For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-180 — Building sewers and connections

Code of Ordinances of the Village of Palatine, Illinois (Codified through Ordinance No. O-113-26, enacted October 12, 2026. (Supp. No. 2, Update 2)) · Palatine Code of Ordinances § 30-180

Corpus is an independent public-information project, not the official City of Palatine website. Stable reference: corpuslaw.us/code/450ce0eb-2a94-44ed-a124-4b33e4077caa

Sec. 30-180. - Building sewers and connections.

(a) No person shall uncover, make any connections with, or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the authorized village official. ..... (b) All disposal by any person into the sewer system is unlawful except those discharges in compliance with federal standards promulgated pursuant to the Federal Act and more stringent state and local standards. ..... (c) There shall be two classes of building sewer permits: ..... (1) For residential and commercial service; and ..... (2) For service to establishments producing industrial wastes. ..... In either case, the owner or agent shall make application on a special form furnished by the village. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the authorized village official. A permit and inspection fee as established by the village for a residential or commercial building sewer permit shall be paid to the village at the time the application is filed. The industrial user, as a condition of permit authorization, must provide information describing its wastewater constituents, characteristics, and type of activity. (d) A building sewer permit will only be issued and a sewer connection shall only be allowed if it can be demonstrated that the downstream sewerage system, including sewers, pump stations, and wastewater treatment system, have sufficient reserve capacity to adequately and efficiently handle the additional anticipated waste load. ..... (e) All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the village from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. ..... (f) A separate and independent building sewer shall be provided for every building, except that where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard, or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer. ..... (g) Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the authorized village official, to meet all requirements of this article. ..... (h) The size, slope, alignment, and materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the village. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriated specifications of the American Society of Testing Materials, Water Pollution Control Federation Manual of Practice No. 9, and Standard Specifications for Water and Sewer Main Construction in Illinois shall apply. In case of conflict, the provisions of the applicable village code shall take priority. ..... (i) Whenever possible, the building sewer shall be brought to the building at or below the elevation of the building service connection. In any buildings in which any floor elevation is lower than the finished street grade, sanitary sewage carried by the building drain shall be lifted by a means which is approved in accordance with this chapter and discharged to the building sewer. ..... (j) No persons shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. ..... (k) The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code, or other applicable rules and regulations of the village. In the absence of village rules or regulations, the procedures set forth in appropriate specifications of the American Society of Testing Materials, Water Pollution Control Federation Manual of Practice No. 9, and Standard Specifications for Water and Sewer Construction in Illinois shall apply. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the authorized village official before installation. ..... (l) The applicant for the building sewer permit shall notify the authorized village official when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the authorized village official. ..... (m) All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the village. ..... (n) The owner of the building or property served by sewer shall be responsible for the maintenance and repair of the building sewer, up to and including the connection to the main. ..... (o) If an existing building sewer is no longer to be used for its intended purpose as in case of the demolition of a building or the installation of a replacement line, the building sewer shall be disconnected and plugged at the connection point to the main or at another location approved by the public works director or designee. The plug shall be permanent and watertight. The owner of the property or the applicant is responsible for all costs and restoration associated with the disconnection. The disconnection and plugging must be inspected and approved by the public works director or designee. .....

(Code 1976, § 19-84; Ord. No. O-102-84, § 3, 11-26-1984; Ord. No. O-61-04, § 2, 4-12-2004; Ord. No. O-109-24, Exh. A(19-84), 11-18-2024)

Ask a question about Palatine law

Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.