§ 30-45 — Connection to municipal water supply
Code of Ordinances of the Village of Palatine, Illinois (Codified through Ordinance No. O-113-26, enacted October 12, 2026. (Supp. No. 2, Update 2)) · Palatine Code of Ordinances § 30-45
Corpus is an independent public-information project, not the official City of Palatine website. Stable reference: corpuslaw.us/code/735afdee-390e-4786-a136-c03fa3fc7ced
Sec. 30-45. - Connection to municipal water supply.
(a) Required connections. The owner or operator of any lot improved or to be improved with a principal structure used for human occupancy, with access to an available water main, shall connect, in accordance with and pursuant to chapter 8, any such principal structure's plumbing system to the village water works system, at such time as any one of the following conditions are met: ..... (1) As a requisite condition of obtaining a building permit to construct, install or cause to be constructed or installed a new principal structure used for human occupancy; ..... (2) As a requisite condition of obtaining a building permit for the development, redevelopment, rezoning or major renovations defined as Level 3 alterations under the latest edition of the International Building Code, as adopted in chapter 8, of any principal structure intended for human occupancy; ..... (3) When an existing principal structure located on a lot served by a private potable water supply system, and such system requires major repairs. For the purposes of this section, major repairs shall be defined as repairs requiring one or more of the following: ..... a. The deepening of an existing well shaft; or ..... b. The construction and installation of a new well shaft. ..... (b) Exceptions. Notwithstanding anything to the contrary, the mandatory connection requirements in subsection (a) of this section shall, in the following limited circumstances, not apply where: ..... (1) A lawfully permitted principal structure used for human occupancy, that has a valid certificate of occupancy, is serviced by a private potable water supply and system, and is located on a lot for which no portion of the principal structure is within 200 feet of the village water supply system. ..... (2) An existing private potable water supply system, otherwise allowed under the provisions of this section, requires minor repairs and will: ..... a. Require a temporary disconnection causing a discontinuation or interruption of water service for a period less than seven days; and ..... b. Include one or more of the following minor repair activities: ..... 1. Disinfection; ..... 2. Cleaning; ..... 3. Electrical repair; ..... 4. Pump replacement of the private potable water supply or system; or ..... 5. Repair or replacement of piping from the well to the structure. ..... (c) Penalty. Any owner or occupier of any lot who fails to make the required connection outlined in this section within 30 days' written notice from the village shall be fined as established by ordinance or resolution of the village per offense. Each day in which any such violation shall continue will constitute a separate offense. ..... (d) Extension of water main. At any such time that connection is required or elected to be made to a village owned water main, if the existing public water main does not extend or is not available along the full length of the property frontage on at least one side of the property making connection, the property owner shall be responsible for extending the water main to their far property line in accordance with the village's requirements. ..... (e) Payment of fee in lieu of construction. In the event that a property owner cannot construct the water main as required, the requirements for construction of water main extensions may be met by the payment of a fee in lieu of construction. The calculation of the fee shall be based upon the estimated cost of construction, as set forth herein. The property owner will be considered to have met the owner's obligation to construct the required improvement upon village's receipt of payment. ..... (1) The property owner shall be charged a fee as set out in the village fee schedule whenever this alternative is selected for implementation. All fees are based upon the linear foot of frontage of the subdivision/tract of land. ..... a. The fee shall be reduced by 50 percent when there are lots on both sides of the right-of-way where the water main will be constructed. ..... b. The amount of the fee shall be automatically adjusted for the increase or decrease in construction costs during the previous calendar year. The Engineering News Record Construction Cost Index or other cost adjustment index published by a reliable/reputable source shall be utilized to update the published fee amounts. ..... c. The mayor and village council may adjust (reduce) the standard fee at the time the fee is determined to consider unusual circumstances in specific cases to help ensure that the fee amount has been fairly calculated. ..... (2) Payment of fee. The village manager or designee shall calculate the amount of a fee as set forth in these regulations. The village manager is hereby designated to administer this payment of fee in lieu of construction program. Payments may be by cash or check made payable to the village. The payment of fees in lieu of construction of public water main infrastructure shall satisfy the requirement that public infrastructure be constructed as part of the requirements of this chapter to install water mains. The connections from the water main to any structure on private property are not included and the cost remains the responsibility of the property owner. ..... (3) Assessments for public infrastructure improvements. Nothing contained herein shall affect the right of the village to enact ordinances requiring assessments/recaptures for construction of public infrastructure from property owners as authorized under the Illinois Compiled Statutes in accordance with statutory rights granted to municipalities. ..... (4) Service extensions. Payment of a fee in lieu of construction shall in no way obligate the village to extend public water lines or sanitary sewers to provide service to any property within the applicable subdivision, nor does it obligate the village to construct public infrastructure within the applicable subdivision. .....
(Code 1976, § 19-26; Ord. No. O-109-24, Exh. A(19-26), 11-18-2024)
Ask a question about Palatine law
Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
