For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.08 — Floodplain Regulations

Code of Ordinances of the Village of Palatine, Illinois (Codified through Ordinance No. O-113-26, enacted October 12, 2026. (Supp. No. 2, Update 2)) · Palatine Code of Ordinances, App. B, art. VI, § 6.08

Corpus is an independent public-information project, not the official City of Palatine website. Stable reference: corpuslaw.us/code/d0d0e463-1931-45e2-bad4-318b5e00c201

6.08. - Floodplain Regulations.

Development of land in and adjacent to floodplains or containing watercourses or drainage ways shall be in accordance with following floodplain regulations of the Village of Palatine: (a) Purpose and Intent. (1) Purpose. The purpose of these floodplain regulations is: a. To assure that new development does not increase the flood elevations or damage hazard or reduce flood conveyance to others upstream or downstream, or create unstable conditions susceptible to erosion; b. To protect new buildings and major improvements to buildings from flood damage; c. To protect human life and health from the hazards of flooding; d. To lessen the burden on the taxpayers for flood control projects, repairs to flood damaged public facilities and utilities and flood rescue and relief operations; e. To assure that new development does not result in any new or additional expense other than for the developer of the property for flood protection or for lost environmental stream uses and functions; f. To assure that new development does not result in any increase in flood velocity or impairment of the hydrologic and hydraulic functions of streams and floodplains unless a water resource benefit is realized; g. To assure that new development does not unreasonably or unnecessarily degrade surface or ground water quality; h. To make federally subsidized flood insurance available for property in the village by fulfilling the requirements of the National Flood Insurance Program; i. To protect, conserve and promote the orderly development of land and water resources; and j. To preserve the natural characteristics and functions of watercourses and floodplains in order to moderate flood and stormwater impacts, improve water quality, reduce soil erosion, protect aquatic and riparian habitat, provide recreational opportunities, provide aesthetic benefits and enhance community and economic development. k. To assure that new development does not violate any provision of the ordinance either during or after construction. (2) Intent. This Section 6.08 is intended to comply with the Rules and Regulations of the National Flood Insurance Program codified as 44 CFR 59-79, as amended and promulgated by the United States Department of Housing and Urban Development, Federal Insurance Administration as provided in the Rules and Regulations of the Federal Register, Volume 41, No. 207, Tuesday, October 26, 1976, as amended, and which are hereby adopted by reference, and filed in the office of the Village Clerk, pursuant to 65 Illinois Compiled Statutes (ILCS) 5/1-2-1, 11-12-12, 11-30-2, 11-30-8, and 11-31-2. However, to the extent the provisions of this Section 6.08 are more restrictive than those required by the Federal Insurance Administration, or the Cook County Watershed Management Ordinance, this Section 6.08 shall take precedence. This section is also intended to comply with Public Act 85-905 and the Rules and Regulations promulgated by the Illinois Department of Transportation, Division of Water Resources as well as meet the requirements of the Rivers, Lakes and Streams Act, as amended [615 ILCS 5/18(g)]. (b) Floodplain Administrator. (1) The Village Engineer is hereby designated as the Floodplain Administrator of the village's floodplain regulations and ordinances as it pertains to this section 6.08. (2) No person, firm, corporation or governmental body not exempted by law shall commence any development in the SFHA without have being first reviewed and approved by the Floodplain Administrator. Such approval shall not exempt compliance with any other sections of the Palatine Code of Ordinances. (3) The Floodplain Administrator shall not grant approval unless all other applicable federal, state and local permits or waivers have been obtained. (4) The Floodplain Administrator shall inspect or cause to be inspected before, during and after construction of all development within the SFHAs. The Floodplain Administrator can request of the permittee any supporting documents such as hydraulic studies, calculations, surveys, elevation and floodproofing certificates or other data or documentation necessary to assure that the development has been constructed in compliance with the approved permit. (c) Base Flood Elevation. (1) The corporate authorities shall obtain, review, and reasonably utilize base flood elevation data available from Federal, State, or other sources, as criteria for requiring that substantial improvements or other development conform with the provisions of Section 6.08(C), until such time as such data has been received from the Federal Insurance Administration. Base flood data received from the Federal Insurance Administration shall take precedence over data from other sources. (2) The Village shall use the following data listed below in descending order of overall accuracy, completeness and currentness. When data of a higher order become available, data of a lower order will not be used. a. The base flood or 100-year frequency flood elevation for the SFHA's of Salt Creek and Buffalo Creek and their tributaries branches shall be delineated on the 100-year flood profiles in the county wide Flood Insurance Study for Cook County prepared by the Federal Emergency Management Agency and generally identified as such on map number 17031J, panels 0038J, 0039J, 0043J, 0044J, 0177J, 0179J, 0181J, 0182J and 0183J, dated August 19, 2008 and such amendments to such study and maps as may be prepared from time to time. The base flood or 100-year frequency flood elevations for the SFHA's of those parts of unincorporated Cook County that are within the one and one-half mile extra territorial jurisdiction of the Village of Palatine and may be annexed into the Village shall be as delineated on the 100-year flood profiles in the Flood Insurance Study of Cook County prepared by the Federal Emergency Management Agency FEMA and generally identified as such on map number 17031J, panels 0063J, 0178J, dated August 19, 2008 and such amendments to such study and maps as may be prepared from time to time. b. Other detailed 100-year flood studies, if certified by IDNR/OWR. c. USGS Maps of flood prone areas. d. USGS-NIPC Hydrologic Investigation Atlases (Floods of Record). e. Illinois State Water Survey Floodplain Information Repository. (3) When no base flood information exists, the base flood elevation shall be determined by a licensed Professional Engineer registered in the state: a. For a riverine SFHA, the BFE shall be determined from a backwater model, such as HEC-II, HEC-RAS, or a dynamic model such as HIP. The flood flows used in the hydraulic models shall be obtained from a hydrologic model, such as HEC-HMS, HEC-I TR-20, or HIP, or by techniques presented in various publications prepared by the United States Geological Survey for estimating peak flood discharges. Flood flows should be based on anticipated future land use conditions in the watershed as determined from adopted local and regional land use plans. Along any watercourse draining more than one (1) square mile, the above analysis must be submitted to the Illinois State Water Survey Floodplain Information Repository for filing. b. For an isolated depressional SFHA, the Base Flood Elevation shall be the historic Flood of Record plus one (1) foot, unless calculated by a detailed engineering study and approved by the Illinois Department of Natural Resources, Office of Water Resources (IDNR-OWR). c. For an isolated depressional area which is not a SFHA, the BFE shall be the flood of record as determined by the Floodplain Administrator, unless calculated by a detailed engineering study. (4) The flood profiles, flows and floodway data in the designated flood study, referenced in Section 6.08 (c)(2 a. of this ordinance, must be used for analysis of base conditions. If the study data appears to be in error or conditions have changed, IDNR-OWR shall be contacted for concurrence on the appropriate base conditions to use. The study shall be submitted to FEMA and IDNR-OWR for review. No development activity shall take place until formal acceptance is received from FEMA and IDNR-OWR amending the regulatory data. (d) Regulations of the Floodplain Areas. All lands deemed to be in the floodplain including the floodway unless specifically noted, shall be subject to the following regulations: (1) Permitted Uses. The following uses are permitted in the floodplain where compensatory storage has been provided for any required fill unless specifically exempted: a. Recreation; such as, but not limited to, day camps, golf courses, parks, or picnic groves; b. Arboreta, Wildlife Sanctuaries, or Woodland Preserves; c. Nurseries, Orchards or other Agricultural Uses; provided that any such vegetation will not create a damaging or potentially damaging increase in flood heights or velocity or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or channel, or permanently impair existing water quality or aquatic habitat; d. Hiking Trails, Bike Paths and Bridle Paths; e. Outdoor Transient Amusement Enterprises such as Circuses, Carnivals and Similar; provided they are on the site less than 30 days and are not located in the floodway or other areas essential to the conveyance of flood waters and are permitted by the underlying zoning. Parking lots for outdoor transient amusement enterprises can be located within the floodplain but not in a floodway or other areas essential for the conveyance of flood waters, provided access is restricted during times of flooding and the owner agrees to accept liability for all damages caused during flood events. Signs shall be posted to clearly identify the flood hazard; f. Storm Sewer Outlets that: i. Do not extend riverward or lakeward of the existing adjacent natural bank; ii. Do not result in an increase in ground elevation; and iii. Are designed so as not to cause stream bank erosion at the outfall location; g. Drain Tiles and Drainage Systems; h. Overhead Utility Transmission Lines; provided such facilities will not create a damaging or potentially damaging increase in flood heights or velocity or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the flood way or channel, or permanently impair existing water quality or aquatic habitat, such structures shall not be located in the floodway and shall be designed in such a way as to not catch debris. No above ground facilities or structures other than those necessary to support the overhead utility may be placed in the floodplain; i. Underground Utility Lines; including those crossing a lake or stream and where the final grade after the installation of the utility lines has not changed from the grade prior to installation, and will not create a damaging or a potentially damaging increase in flood heights or velocity or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or channel, or permanently impair existing water quality or aquatic habitat. In the case of stream crossing the top of the pipe or encasement is buried a minimum of three (3) feet below the existing stream bed. Any utility crossing carrying material which may cause water pollution as defined by the Environmental Protection Act [415 ILCS 5/1 et seq.] shall be provided with shut-off valves on each side of the body of water to be crossed. New and replacement public sanitary sewer systems and water supply systems shall be located and constructed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into the flood waters. All sanitary manhole rims shall be placed above the Flood Protection Elevation, or in the alternative, such manholes shall be provided with watertight, lock-type covers. Other public utilities such as gas, electric communications, etc shall be located and constructed to minimize or eliminate flood damage. No above ground facilities related to the underground utility shall be placed in the floodplain; j. Fencing of any Type; in any yard, provided that any such fencing shall not be located in the floodway, in a floodplain without a detailed study, or other areas essential to the conveyance of flood waters; k. Sidewalks, Driveways, Patios and Similar Structures; provided they are constructed at grade. In Instances of an Existing Depressed Driveway for an attached garage; the relocation of said driveway by filling in the depressed area to grade level and construction of a new driveway on the premises. Compensatory storage shall not be required in these cases; l. Roadways and Parking Lots where required by regulations for zoning districts other than residential and any modifications thereto and do not result in the filling in of any floodplain areas and where the depth of flooding at the 100-year frequency flood event will not exceed 1 foot. New parking lots built below the Base Flood Elevation shall clearly post the potential flood hazard. Applications involving filling require a special use for said fill and compensatory storage must be provided; m. Lighting Standards and Similar Structures provided that they will not create a damaging or potentially damaging increase in flood heights or velocity or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the flood way or channel, or permanently impair existing water quality or aquatic habitat; n. Open Structures such as Playground Equipment and Pavilions; provided that they are properly anchored and without washrooms or other sanitary sewage facilities and are not located in the floodway or other areas essential to the conveyance of flood waters; o. Floodproofing; of existing non-residential structures: i. A Professional Structural Engineer, registered in the state, shall develop and/or review the structural design, specifications and plans for construction, and shall certify that the building or floodproofing alterations have been designed so that below the flood protection elevation, the structure and attendant utility facilities are water-tight and capable of resisting the effects of the base flood. The building design or floodproofing alterations shall take into account flood velocities, duration, rate of rise, hydrostatic and hydrodynamic forces, the effects of buoyancy and impacts from debris or ice; ii. Floodproofing measures shall be operable without human intervention and without an outside source of electricity; iii. The Floodplain Administrator shall maintain the engineer's certificate and a record of the specific "as built" elevation to which the building was floodproofed; iv. A building permit must be secured for any flood-proofing work; p. Elevation of existing structures, residential or non-residential buildings, by fill shall be in accordance with the following: i. The fill must extend at least ten (10) feet beyond the foundation before the grade slopes below the Base Flood Elevation for buildings, unless it is demonstrated that the building is and the building site are reasonably safe from flooding per design standard requirements in Technical Bulletin 10-01 issued by FEMA; ii. Be placed in layers no greater than six-inches deep before compaction; and iii. No compensatory storage is required for the floodplain volume displaced by the building however compensatory storage is required for this fill; q. Elevation of existing Structures, residential or non-residential buildings, by means other than filling shall be in accordance with the following: i. The building or improvements shall be elevated on crawl space, stilts, piles, walls, or other foundation that is permanently open to flood waters and is resistant to damage by hydrostatic pressures of the base flood or 100-year frequency flood. The permanent openings shall be no more than one foot above grade, and consist of a minimum of two openings. The openings must have a total net area of not less than one square inch for every one square foot of enclosed area subject to flooding below the Base Flood Elevation. Such openings shall be designed and constructed in accordance with the Federal Insurance Administration Technical Bulletin 1-93; ii. An adequate drainage system must be installed to remove floodwaters from the area internal to the structure foundation within a reasonable period after the flood waters recede; iii. The foundation and supporting members shall be anchored and aligned in relation to flood flows and adjoining structures so as to minimize exposure to known hydrodynamic forces such as current, waves, ice and floating debris; iv. All areas below the flood protection elevation shall be constructed of materials resistant to flood damage in accordance with the Federal Insurance Administration Technical Bulletin 2-93. The lowest floor (including basement) and all electrical, heating, ventilating, plumbing, and air conditioning equipment, ductwork, service equipment and utility meters shall be located at or above the flood protection elevation. Water and sewer pipes, electrical and telephone lines, submersible pumps, and other water proofed service facilities may be located below the flood protection elevation provided they are waterproofed; v. No area below the flood protection elevation shall be used for storage of items or materials or modified or occupied at a later date for habitable space; vi. Designs for meeting these requirements shall be prepared, signed and sealed by a licensed Professional Structural Engineer or a licensed architect registered in the state; r. Reconstruction of a building or structure destroyed or damaged by fire, or other act of nature where: i. Any building or structure so destroyed may be restored in its entirety if such building or structure and the use thereof conformed to all the regulations of the district in which such building or structure was located before such damage or destruction, and shall continue to so conform after restoration of such building or structure; ii. If all or substantially all of such building or structure is designed or intended for a use which is not permitted in the district in which it is located, said building or structure may be restored unless the damage exceeds 40% of its market value before it was damaged, in which case it shall conform to this ordinance; iii. The replacement structure shall not exceed the outside dimension of the building or structure destroyed or damaged and shall be designed to include floodproofing measures included in Section 6.08(C)(1)(o), in the case of non-residential buildings or elevated to two (2) feet above the base floodplain elevation in case of residential structures in accordance with Section 6.08(C)(1)(p); s. Improvements or Additions to existing Buildings or Structures; provided that any such improvement shall be located wholly at or above the flood protection elevation and outside of the floodway, and shall meet the requirements specified in Section 6.08 (d)(1) p or q of this ordinance and all of the National Flood Insurance Program requirements for substantial improvements. Improvements shall not exceed 40% of the market value of the structure before the improvement or repair is started and shall be counted cumulatively for a ten (10) year period beginning at the start of the first improvement; t. Removal of Topsoil; in accordance with Section 6.09 of the Subdivision Regulations; u. Minor maintenance dredging of a stream channel where: i. The affected length of stream is less than 1000 feet; ii. The work is confined to reestablishing flows in natural stream channels; or iii. The cross sectional area of the dredged channel conforms to that of the natural channel upstream and downstream of the site; v. Construction of shore line and stream bed protection that: i. Does not exceed 1000 feet in length or 2 cubic yards per lineal foot of stream bed; ii. Materials are not placed higher than the existing top of bank; iii. All materials utilized shall be properly sized or anchored to resist anticipated forces of current and wave action; iv. Materials shall be placed in a way which would not cause erosion or the accumulation of debris on properties adjacent to or opposite the project; v. Materials shall be placed so that the modified cross-sectional area of the channel will conform to that of the natural channel upstream and downstream of the site. In no case shall cross-sectional area of the natural channel be reduced. The bank may be graded to obtain a flatter slope and to lessen the quantity of material required; vi. Vegetative stabilization and gradual side slopes are the preferred mitigation methods for existing erosion problems. Where high channel velocity sharpens or wave action necessitates the use of alternate stabilization measures, natural rock, rip-rap or natural rock filled gabions are preferred material. Artificial materials such as concrete, construction rubble, and sheet piles should be avoided, unless there are no possible alternatives; w. Structures or facilities related to the use of or requiring access to, the water or shoreline such as pumping facilities, piers, boat ramps and other functionally water dependent uses, provided that any such structure or facility shall not be located in the floodway, in a floodplain without a detailed study, or other areas essential to the conveyance of flood waters and the proposed structure or facility is the minimum necessary to meet current or future needs as a water dependent use; x. Specific construction approved by IDNR-OWR. (2) Special Uses. The following may be permitted in the floodplain upon approval of the Mayor and Village Council of the Village of Palatine and subject to the procedures and provisions of Section 14.05 of the Zoning Ordinance. Special uses in the floodplain requested in conjunction with an application for a Plat of Subdivision or a Planned Development shall be processed as a part of that application. a. Residential Front, Side or Rear Yards for new or substantially improved construction; except that no principle structures or fill shall be permitted thereon. b. Fencing of Any Type; in any yard, not located in the floodway, in a floodplain without a detailed study, or other areas that are essential to the conveyance of flood water. Before an application for any permit may be approved, the applicant must file with the Floodplain Administrator, copies of all permits, duly issued, which are required by Federal and State agencies to construct the proposed fence in the floodplain. c. Structures or facilities related to the use of or requiring access to, the water or shoreline such as pumping facilities, piers, boat ramps and other functionally water dependent uses to be located within a floodway provided: i. The proposed structure or facility is the minimum necessary to meet current or future needs as a water dependent use. ii. The proposed structure or facility will not create a damaging or potentially damaging increase in flood heights or relocations or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or channel. iii. The proposed structure or facility will not permanently impair or degrade the aquatic habitat nor will prevent the migration of indigenous fish species that require access to upstream areas as part of their life cycle, such as for spawning. iv. A permit or a letter indicating a permit is not required must be obtained from IDNR-OWR. d. Filling in of Land where. i. Compensatory storage is provided by and through the removal of 110% of the volume of existing material from opposite to or adjacent to the areas filled and occupied, or it shall be demonstrated by the applicant's engineer that through a determination of flood discharges and water surface elevations that the location selected is hydraulically equivalent and is capable of storing flood waters. All such excavations shall be constructed to drain freely and openly to the watercourse. All floodplain storage lost below the existing 10 year flood elevation shall be replaced below the proposed 10 year flood elevation: All floodplain storage lost above the existing 10 year flood elevation shall be replaced above the proposed 10 year flood elevation. There shall be no reduction in floodway surface area as a result of a floodway modification, unless such modification is necessary to reduce flooding at an existing structure. ii. All applicable Federal, State and Local permits must be obtained. iii. New structures may be permitted on such filled land provided that the elevation of the filled land is at least two (2) feet above the base flood elevation and all applicable Local, State and Federal requirements regarding the construction of the structure are met. New buildings must be constructed on properly designed and compacted (ASTM D-698 or equivalent) that encompass the entire lot for single family residential or extends beyond the building walls for multi-family, commercial or industrial development at least ten (10) feet for buildings without basements and at least twenty (20) feet before dropping below the Base Flood Elevation and has appropriate protection from erosion and scour. Any structures built on fill in or near the floodplain shall meet the requirements of Federal Insurance Administration Technical Bulletin 10-01 and shall be certified as meeting such requirements by a qualified design professional. iv. The design of the fill or the fill standard must be approved by a registered engineer. Land so filled shall not be considered floodplain provided upon completion of the filling activity, sufficient data is submitted to FEMA in order to amend the regulatory flood data. This certification from FEMA that the filled land is no longer within the regulatory floodplain must be received before a building permit for a new structure can be issued. e. Flood control structures, dikes, dams and other public works or private improvements for the purpose of backing up water provided: i. The project is determined to be in the public interest by providing flood control, public recreation or regional stormwater detention. ii. The proposed project will not create a damaging or potentially damaging increase in flood heights or relocations or be a threat to public health and safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or channel. iii. The project will not permanently impair or degrade the aquatic habitat nor will prevent the migration of indigenous fish species that require access to upstream areas as part of their life cycle, such as for spawning. iv. The project will not cause or contribute to degraded water quality. The design of the project should include gradual bank slopes, appropriate bank stabilization measures and a pre-sedimentation basin. v. A non-point source control plan shall be implemented in the upstream watershed to control the effects of sediment runoff as well as minimize the input of nutrients, oil and grease, metals and other pollutants. vi. Any increase in upstream flood stages greater than 0.0 foot when compared to the existing conditions, for all events up to and including the 100-year frequency event shall be contained within the channel banks (or within existing vertical extensions of the channel banks) such as within the design protection grade of existing levees or floodwalls or within recorded flood easements. vii. A permit or a letter indicating a permit is not required must be obtained from IDNR-OWR, Dam Safety Section for a Dam Safety Permit or waiver for any structure built for the purpose of backing up water in the stream during normal or flood flow. All dams and impoundment structures shall meet the permitting requirements of 17 Adm. Code 3702 (Construction and Maintenance of Dams). f. Facilities for Volume Control Practices and for the Storage and Detention/Retention of Storm Water: i. Volume Control practices and Stormwater detention facilities shall not be located in the floodway or other areas essential for the conveyance of floodwaters. ii. The plans and specifications for the facility shall be approved by the Floodplain Administrator and shall provide all storage capacity for the 100 year storm event above the base flood elevation. iii. All berming or other raised earthen structures are subject to the required amount of compensatory storage and shall not affect the flow of water. iv. The facility shall demonstrate adequate engineering and design features so as to prevent stagnant water or other adverse environmental effects. g. Signs; according to the rules and regulations as stated in Article VIII of the Zoning Ordinance and provided they are not located in the floodway or other areas essential to the conveyance of flood waters. h. Detached Garages or Storage Sheds Without Toilets or Other Sanitary Sewerage Facilities, provided they are properly anchored and made flood resistant, in accordance with the Federal Insurance Administration Technical Bulletin 2-93, are less than 700 square feet total for all accessory structures in size, are not located in a floodway or other area essential to the conveyance of flood waters and meet all applicable State and Federal regulations. The maximum square footage for any one replacement detached garage structure, which is necessary to comply with the required parking, identified in Appendix A of the Village of Palatine Code of Ordinances, cannot exceed 600 square feet, or as further determined by Article VI of Appendix A of the Village of Palatine Code of Ordinances. The maximum square footage for any one replacement storage shed is 100 square feet. For all replacement detached garages, which are necessary to comply with required parking identified in Appendix A of the Village of Palatine Code of Ordinances or storage sheds, which are replacing existing structures in a similar location and like encroachment into the floodplain as the existing detached garage or storage shed on the Subject Property, the proposed replacement structure shall comply with the following: 1) the proposed new replacement structure shall not adversely impact the subject or surrounding properties or encroach any further into the floodplain, as determined by the Village Engineer. 2) pursuant to the Village review of the submitted topographical survey or other required engineering plans in support of the proposed new replacement structure, a determination of no further adverse impact to the subject or surrounding properties or further encroachment into the floodplain must be made by the Village Engineer, in review of the submitted plans, in order to continue the Special Use process. 3) if the Village determines that the proposed new structure would have an adverse impact or further encroachment into the floodplain, a standard Variation process would be required in order to continue forward with the Special Use process. i. Retaining Walls; provided that they are not located in the floodway or other areas essential to the conveyance of flood waters. j. Bridges and Culverts; provided: i. Construction shall not result in an increase of upstream flood stages greater than 0.1 foot when compared to the existing conditions for all flood events up to and including the 100-year frequency event; or the upstream flood stage increases will be contained within the channel banks (or within the vertical extensions of the channel banks) such as within the design protection grade of existing levees or flood walls or within recorded flood easements. ii. If the proposed construction will increase upstream flood stages greater than 0.1 feet, the applicant must contact IDNR-OWR, to obtain a permit for a dam or waiver. iii. The engineering analysis of upstream flood stages must be calculated using the flood study flows, and corresponding flood elevations for tailwater conditions for the required flood study. Culverts must be analyzed using the US DOT, FHWA Hydraulic Chart for the selection of Highway Culverts. Bridges must be analyzed using the US DOT/FHA Hydraulics of Bridge Waterways calculation procedures. iv. The hydraulic analysis for the backwater caused by the bridge showing the existing condition and proposed regulatory profile must be submitted to IDNR-OWR for concurrence that a CLOMR is not required. v. Lost floodplain storage shall be compensated for per Section 6.08(d)(2)d. of this ordinance. vi. Velocity increases must be mitigated per Section 6.08(d)(4)d. of this code of ordinances. vii. All excavations for the construction of the crossing shall be designed per Section 6.08(d)(4)e. of this code of ordinances. k. Modification or Reconstruction of Existing Bridges, Culverts and Approach Roads; provided: i. The proposed reconstruction or modification shall be constructed with no more than 0.1 foot increase in backwater over the existing flood profile for all flood frequencies up to and including the 100-year event, if the existing structure is not a source of flood damage. ii. Where the existing bridge or culvert and roadway approach is a source of flood damage to buildings or structures in the upstream floodplain, the applicant's engineer shall evaluate the feasibility of redesigning the structure to reduce the existing backwater, taking into consideration the effects on flood stages on upstream and downstream properties. iii. The determination as to whether or not the existing crossing is a source of flood damage and should be redesigned must be prepared in accordance with the Department of Transportation Rules [17 Ill. Adm. Code 708] (Floodway Construction in Northeastern Illinois) and submitted to IDNR-OWR for review and concurrence before a permit is issued. l. Above Ground Swimming Pools and Spas; provided they are not located in the floodway or other areas essential to the conveyance of flood waters. Compensatory storage must be provided for lost storage volume. m. Raised Patios or Decks, provided they are not located in the floodway or other areas essential to the conveyance of flood waters. n. Activities incidental to and customarily associated with any of the foregoing. o. Dredging of a stream channel that does not meet the criteria of Section 6.08(d)(1)t. of this ordinance. p. Construction of shore line or stream bank stream bank protection that does not meet the criteria of Section 6.08 (d) (1) u. of this ordinance. (3) Restrictions on Usage. No provision of this Section 6.08 shall be construed to permit any of the following in the floodplain. a. New Structures and Buildings; with the exception of those listed in Section 6.08(d)(1) and (2). New Structures and Buildings cannot be elevated by any means other than by fill. b. Sanitary Landfills, Dumps, Junkyards, and Outdoor Storage of Inoperable Vehicles within the 500-year floodplain. c. Outside storage of recreational vehicles, even if in compliance with section 7.03(d)(1)ii of Appendix B of the Palatine Code of Ordinances, in excess of 180 consecutive days unless they are fully licensed and ready for highway use. d. On-site Sewage Disposal Systems or Water Treatment Facilities; -within the 500 Year Floodplain. e. Those structures or facilities which produce, use or store highly volatile, flammable, explosive, toxic and/or water-reactive materials within the 500-year floodplain. f. Hospitals, Nursing Homes and Housing which are likely to contain occupants who may not be sufficiently mobile to avoid death or injury during a flood event within the 500-year floodplain. g. Police Stations, Fire Stations, Vehicle and Equipment Storage Facilities and Emergency Operations Centers which are needed for flood response activities before, during, and after the flood event within the 500-year floodplain. h. Public or Private Utility Facilities such as wells, pumping stations and other facilities which are vital to maintaining or restoring normal services to flooded areas before, during, and after a flood event within the 500-year floodplain. New sanitary lift stations shall also be located above the Flood Protection Elevation and shall be located to ensure access for maintenance during the Base Flood Event. Existing sanitary lift stations to be repaired or rehabilitated shall have all above ground equipment elevated above the Flood Protection Elevation. Where possible, ground openings and vents shall be adjusted above the Flood Protection Elevation or be constructed with lock-type, watertight structure lids to protect against the Base Flood. (4) Standards for Regulatory Floodway Construction. The only development in the floodway or SFHA where a floodway has not been determined, which will be allowed are uses included as permitted uses, 6.08(c)(1); or special uses, 6.08(c)(2); which will not cause a rise in the base flood elevation, and which will not create a damaging or potentially damaging increase in flood heights or velocity or be a threat to public health safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or channel, or permanently impair existing water quality or aquatic habitat. Construction impacts shall be minimized by appropriate mitigation methods as called for in the ordinance. a. Carrying Capacity and notification. For all projects involving channel modification, fill, or stream maintenance (including levees), the carrying capacity of the channel shall be maintained. In addition, the Village shall notify adjacent communities in writing 30 days prior to the issuance of a permit for the alteration or relocation of the channel. b. Preservation of flood conveyance so as not to increase flood stages upstream. For appropriate uses other than bridge or culvert crossings, on-stream structures or dams, all effective regulatory floodway conveyance lost due to the project will be replaced for all flood events up to and including the 100-year frequency flood. In calculating effective regulatory floodway conveyance, the following factors shall be taken into consideration: i. Regulatory floodway conveyance, 'K'=(1.486/n) ARe0.67, where "n" is Manning's roughness factor, "A" is the effective area of the cross-section, and "R" is the ratio of the area to the wetted perimeter. (see Open Channel Hydraulics, Ven Te Chow, 1959, McGraw-Hill Book Company, New York) ii. The same Manning's "n" value shall be used for both existing and proposed conditions unless a recorded maintenance agreement with a federal, state, or local unit of government can assure the proposed conditions will be maintained or the land cover is changing from a vegetative to a non-vegetative land cover. iii. Transition sections shall be provided and used in calculations of effective regulatory floodway conveyance. The following expansion and contraction ratios shall be used unless an applicant's engineer can prove to IDNR-OWR through engineering calculations or model tests that more abrupt transitions may be used with the same efficiency: (a) When water is flowing from a narrow section to a wider section, the water should be assumed to expand no faster than at a rate of one foot horizontal for every four feet of the flooded stream's length. (b) When water is flowing from a wide section to a narrow section, the water should be assumed to contract no faster than at a rate of one foot horizontal for every one foot of the flooded stream's length. (c) When expanding or contracting flows in a vertical direction, a minimum of one foot vertical transition for every ten feet of stream length shall be used. (d) Transition sections shall be provided between cross-sections with rapid expansions and contractions and when meeting the regulatory floodway delineation on adjacent properties. (e) All cross-sections used in the calculations shall be located perpendicular to flood flows. (f) Erosion/scour protection shall be provided inland upstream and downstream of the transition sections. c. Preservation of Floodway Storage so as not to increase downstream flooding. Compensatory storage provided by and through the removal of 110% of the volume of existing material from opposite to or adjacent to the areas filled and occupied, and is capable of storing flood waters. Artificially created storage lost due to a reduction in head loss behind a bridge shall not be required to be replaced. The compensatory storage shall be placed between the proposed normal water elevation and the proposed 100-year flood elevation. All regulatory floodway storage lost above the existing 10-year flood elevation shall be replaced above the proposed 10-year flood elevation. All such excavations shall be constructed to drain freely and openly to the watercourse. There shall be no reduction in floodway surface area as result of a floodway modification, unless such modification is necessary to reduce flooding at the existing structure. d. Preservation of Floodway Velocities so as not to increase stream erosion or flood heights. For all permitted and special uses, except bridges or culverts or on stream structures, the proposed work will not result in an increase in the average channel or regulatory floodway velocities or stage, for all flood events up to and including the 100-year frequency event. However, in the case of bridges or culverts or on stream structures built for the purpose of backing up water in the stream during normal or flood flows, velocities may be increased at the structure site if scour, erosion and sedimentation will be avoided by the use of rip-rap or other design measures. e. Excavation in the floodway. When excavation is proposed in the design of bridges and culvert openings, including the modifications to and replacement of existing bridge and culvert structures, or to compensate for lost conveyance for any permitted or special uses in the floodway, transition sections shall be provided for the excavation. Expansion and contraction ratios meeting the criteria of Section 6.08(d)(4)b.iii. shall be used unless the applicants engineer can demonstrate through engineering calculations or model tests to the satisfaction of IDNR-OWR that more abrupt transitions can be used with the same efficiency. f. Conditional Letter of Map Revision. If the proposed development would result in a change in the regulatory floodway location or the 100-year frequency flood elevation, a Conditional Letter of Map Revision (CLOMR) must be obtained prior to any filling, grading, dredging or excavating in the floodway. No further development activities shall take place until a final Letter of Map Revision (LOMR) is issued by FEMA with concurrence from IDNR-OWR. g. Professional Engineer's Supervision. All engineering analyses shall be performed by or under the supervision of a Registered Professional Engineer. h. Analysis Criteria; The flood profiles, flows and floodway data in section 6.08(b) shall be used for analysis. If the 100-year floodway elevation at the site of the construction is affected by backwater from a downstream receiving stream with a larger drainage area, the proposed construction shall be shown to meet the requirements of this section for the 100-year frequency flood elevations of the regulatory conditions and conditions with the receiving stream at normal water elevations. If the applicant learns from IDNR-OWR, the Village of Palatine, or a private owner that a downstream restrictive bridge or culvert is scheduled to be removed, reconstructed, or modified, or a regional flood control project is scheduled to be built, removed, constructed or modified within the next five years, the proposed construction shall be analyzed and shown to meet the requirements of this section for both the existing conditions and the expected flood profile conditions when the bridge, culvert or flood control project is built. (5) Regulation of Riverine SFHAs where the Floodway has not been Determined. Where no floodway has been designated within a riverine floodplain, the entire floodplain shall be regulated as floodway unless the developer has an engineering study performed to determine the floodway that is submitted to FEMA and IDNR-OWR for acceptance as the designated floodway. No development activity shall take place until formal acceptance is received from FEMA and IDNR-OWR. (6) Density Calculations. The floodplain areas may be utilized in calculating the floor area or lot size density for an entire tract of land (hereinafter referred to as "density transfer") in accordance with the following conditions and restrictions except that no structures shall be permitted thereon: a. Density transfers shall not be permitted for tracts of land less than five (5) acres in size; provided that owners of two (2) or more tracts of contiguous land may agree to have such tracts considered as a single unit in order to qualify for density transfers hereunder. b. A plat of survey shall be submitted with each application for density transfer, together with a certification by a registered professional engineer in the state, certifying as to that portion of floodplain which covers the subject tract or tracts of land. Precise location of the floodplain shall be shown on a topographic map at a contour interval of not greater than two (2) feet. c. The maximum allowable density which may be transferred shall be computed in accordance with the following table: Percentage of Total Tract In Floodplain | Portion of Tract in Floodplain Which May Be Used In Calculating Density for the Entire Tract Less than 25% | 100% 25% to 50% | 75% 50% to 75% | 50% 75% or More | 25% d. Other Restrictions. The Mayor and Village Council of the Village of Palatine may prescribe such other reasonable limitations, conditions and restrictions upon transfer of density in each case as are in the interest of preserving the public safety, health, comfort and welfare. (e) Regulations of the Areas Less than One (1) Foot above the Base Flood Elevation. (1) Conditions of Use. Because certain meteorological events can produce flood elevations greater than the established base flood elevation or conditions may occur downstream that create higher flood elevations all lands adjacent to the floodplain and less than one (1) foot above the level of the base flood elevation, are subject to the regulations of Section 6.08 (d), unless said lands are filled and elevation thereof raised to an elevation of one (1) foot or more above the base flood elevation. (2) Construction Within Adjacent Areas. In the event said lands are filled and elevation thereof raised to an elevation of one (1) foot or more above the base flood elevation, or shall be not less than one (1) foot above the base flood elevation, no building or structure shall be constructed or moved within said area unless all of the following conditions are met: a. The proposed site of the building or structure shall be filled so that the elevation of the lowest ground elevation measured at a minimum distance of twenty (20) feet from the foundation of the building or structure is at least one (1) foot above the base flood elevation. b. Any structures built on fill placed in areas one(1) foot or less above the base flood elevation shall meet the requirements of Federal Insurance Administration Technical Bulletin 10-01 and shall be certified as meeting such requirements by a qualified design professional. c. Compensatory storage is not required for fill placed above the base flood elevation. d. All construction shall be in accordance with the Code of Ordinances of the Village of Palatine. (f) Regulations of Isolated Depressional Areas. Isolated depressional areas are areas inundated by the base floods which are not regulatory floodplain. All new structures and improvements on a parcel containing an isolated depressional area shall require an administrative special use and must comply with the following: (1) The lowest opening for all new structures and substantial improvements shall be at or above the flood protection elevation. (2) A development plan prepared by an Engineer shall be submitted which details improvements necessary to drain the depressional area into an established sewer or channel with sufficient downstream capacity to carry the 100 year flow. No compensatory storage is required. (3) The overland flow route must be shown on the plat and easements sufficient to carry the 100 year flow must be provided. (g) Seeding and Stabilization Plan. For all activities located in the floodplain, a seeding and stabilization plan shall be submitted by the applicant. (h) Soil Erosion and Sedimentation Measures. For all activities in the floodplain in which there is the potential for erosion of exposed soil, soil erosion and sedimentation control measure meeting the criteria of Section 6.09, Appendix B of the Palatine Code of Ordinance shall be implemented. (i) Variations of Floodplain Regulations. No variances shall be granted to any development located in a regulatory floodway. However, when a development proposal is located outside of a regulatory floodway, and whenever the standards of this section place undue hardship on a specific development proposal, the applicant may apply to the Floodplain Administrator for a variance. The Floodplain Administrator shall advise the Mayor and Village Council of the Village of Palatine of any such variations. (1) No variance shall be granted unless the applicant demonstrates that: a. The development activity cannot be located outside the SFHA; b. An exceptional hardship would result if the variance were not granted; c. The relief requested is the minimum necessary; d. There will be no additional threat to public health, safety, beneficial stream uses and functions, especially aquatic habitat, or creation of a nuisance; e. There will be no additional public expenses for flood protection, lost environ-mental stream uses and functions, rescue or relief operations, policing, or repairs to stream beds and banks, roads, utilities, or other public facilities; f. The development will not create a damaging or potentially damaging increase in flood heights or velocity or threat to public health, safety and welfare or impair the natural hydrologic and hydraulic functions of the floodway or change or impair existing water quality or aquatic habitat. g. The activity is not in a regulatory floodway; h. The applicant's circumstances are unique and do not represent a general problem, and i. The granting of the variance will not alter the essential character of the area involved including existing stream uses. (2) The Floodplain Administrator shall notify an applicant in writing that a variance from the requirements of this Section that would lessen the degree of protection to a building will: a. Result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage; b. Increase the risks to life and property; and c. Require that the applicant proceed with knowledge of these risks and that he will acknowledge in writing that he assumes the risk and liability. (3) Variances requested in connection with restoration of a historic site or historic building as defined as "Historic Structure" in this section may be granted using criteria more permissive than the requirements of Sections 6.08(f)a and b, subject to the conditions that; a. The repair or rehabilitation is the minimum necessary to preserve the historic character and design of the structure; and b. The repair or rehabilitation will not result in the structure being removed as a certified historic structure. (j) Disclaimer of Liability. The degree of flood protection required by this Section is considered reasonable for regulatory purposes and is based on available information derived from engineering and scientific methods of study. Larger floods may occur or flood heights may be increased by man-made or natural causes. This Section does not imply that development, either inside or outside of the SFHA, will be free from flooding or damage. This Section does not create liability on the part of the Village or any officer or employee thereof for any flood damage that results from reliance on this Section or any administrative decision made lawfully thereunder. (k) Penalty. Failure to comply with the requirements of a permit or conditions of a variance resolution shall be deemed to be a violation of this Section. Upon due investigation, the Floodplain Administrator may determine that a violation of the minimum standards of this Section exist. The Floodplain Administrator shall notify the owner in writing of such violation. (1) If such owner fails after ten (10) days notice to correct the violation: a. The Village may make application to the Circuit Court for an injunction requiring conformance with this Section or make such other order as the Court deems necessary to secure compliance with this Section. b. Any person who violates this Section shall, upon conviction thereof, be fined pursuant to the village fine schedule. c. A separate offense shall be deemed committed upon each day during or on which a violation occurs or continues. d. The Village may record a notice of violation on the title to the property. (2) The Floodplain Administrator shall inform the owner that any such violation is considered a willful act to increase flood damages and, therefore, may cause coverage by a Standard Flood Insurance Policy to be suspended. (3) The Floodplain Administrator is authorized to issue an order requiring the suspension of the subject development. The stop-work order shall be in written, clearly posted on the subject property, shall indicated the reason for the issuance, and shall order the action, if necessary, to resolve the circumstances requiring the stop-work order. The stop-work order constitutes a suspension of the permit. (4) No development permit shall be permanently suspended or revoked until a hearing is held by the Administrative Hearing Officer. Notification and procedures for the hearing shall be in conformance with Chapter 2 Article XXX (Administrative Hearing Division) of the Palatine Code of Ordinances. (5) Nothing herein shall prevent the Village from taking such other lawful action to prevent or remedy any violations. All costs connected therewith shall accrue to the person or persons responsible. (l) Abrogation and Greater Restrictions. This section is not intended to repeal, abrogate or impair any existing easements, covenants, or deed restrictions. Where this section and other ordinances, easements, covenants, or deed restrictions conflict or overlap, whichever imposes the more stringent restrictions shall prevail. The section intended to repeal the original ordinance or resolution which was adopted to meet the National Flood Insurance Program regulations, but is not intended to repeal the resolution which the Village passed in order to establish initial eligibility for the program. (m) Separability. The provisions and sections of this section shall be deemed separable and the invalidity of any portion of this section shall not affect the validity of the remainder. (n) Procedure. (1) Permits and appeals. The procedure for issuance of building permits, special use permits, and appeals shall be those provided for in Article XIV of the zoning ordinance. Before an application for any permit may be approved under this Section 6.08, the applicant must file with the Floodplain Administrator copies of all permits, duly issued, which are required by federal and state agencies to construct the proposed project in the floodplain." (2) Professional Engineer Review. If the development site is within a floodway or in a floodplain on which a detailed study has not been conducted which drains more than one square mile, then the permit shall be reviewed by a Registered Professional Engineer under the employ or contract of the Village of Palatine to ensure that the development meets the requirements of section 6.08. In the case of an appropriate use, the Professional Engineer shall state in writing that the development meets the requirement of section 6.08. (3) The Floodplain Administrator shall be responsible for obtaining from the applicant copies of all other local, state and federal permits, approvals or permit not required letters that may be required for this type of activity. No permits shall be issued unless all required local, state and federal permits or waivers have been obtained.

(Ord. No. O-83-96, § 9, 5-29-1996; Ord. No. O-137-00, § 3, 10-23-2000; Ord. No. O-118-11, §§ 2, 3, 10-10-2011; Ord. No. O-134-14, § 1, 10-20-2014; Ord. No. O-35-19, 4-8-2019; Ord. No. O-36-26, § 1(Exh. A), 4-13-2026)

Ask a question about Palatine law

Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.