9.03. - Acceptance and approval of required Project Improvements.

(a) Acceptance. Each development is required by this ordinance to contain the necessary Project Improvements as set forth in this Appendix. The village shall determine which Project Improvements the village will accept dedication of in connection with the following types of developments: (1) Planned Developments. All improvements in a planned development that are specifically designated and authorized by the Corporate Authorities. (2) Residential Subdivisions. The underground and surface improvements within the rights-of-way of public streets, easements or outlots in a residential subdivision. (3) Office Research or Industrial Parks. All improvements with office, research or industrial parks. (4) Other Types of Developments. Only those Project Improvements specifically designated and authorized by the Corporate Authorities for acceptance. (b) Approval. When all required Project Improvements are completed in their entirety, the Subdivider shall request the village, in writing, to accept or approve said Project Improvements and the Subdivider must, in such written request, guarantee them for a period of one year from the date of acceptance or approval. (1) Prior to request for approval, the village engineer must be in receipt of: a. Video tapes of all sanitary sewer eight (8) inches or greater in diameter. Tapes shall be of type and size compatible to be used by the village. b. As built engineering plans showing: i. Actual location and size of storm sewers, sanitary sewer and water mains showing actual locations of all inlets, manholes, valve vaults, hydrants and other appurtenance. Actual invert and rim elevations are to be given for all inlets and manholes. ii. Locations and dimensions of roadways, sidewalks and easements. iii. Locations and sizes of all water and sanitary sewer services. iv. Actual location of street lights and underground cables. v. Contour lines of any detention facilities along with calculations indicating actual storage capacity. vi. Elevations of the tops of all foundations and the corners of all lots. vii. Location points of all sanitary service connections to the sewer main. viii. Request for Final Inspection and Approval. Approved by the Metropolitan Water Reclamation District for all applicable permits. ix. An Illinois Environmental Protection Agency operating permit for all water main construction. x. Letter of acceptance from the township, county, and/or state highway department when applicable. (2) Upon receipt of the written request, the village engineer will authorize and schedule a final inspection to take place as soon as reasonably possible after receipt of the written request. a. Final inspections shall not be scheduled between November 15 and April 1 unless, in the opinion of the village engineer, weather conditions permit. b. All deficient improvements which do not totally conform to this appendix (either incomplete, damaged, or poor workmanship of improvements) will be inventoried. c. The inventory of deficiencies will be forwarded to the Subdivider for processing within 60 days of written request. d. When the deficiencies are corrected, the Subdivider shall request a second inspection. Scheduling of the second inspection shall be the same as for the first inspection. e. If the length of time between the first and second inspection is greater than four (4) months, or if the noted deficiencies are not correct at the time the second inspection is made, the request for acceptance will be cancelled. f. If cancelled, a second request letter will be required. The second request for acceptance is subject to the following conditions: i. The Subdivider will be required to pay the cost incurred by the person conducting the inspection. ii. The punch-list of deficiencies recorded during the previous inspections will be voided and a complete reinspection is required. g. The Project Improvements shall be deemed to be "complete" when the village engineer submits, in writing, evidence that all Project Improvements have been completed pursuant to all applicable codes and ordinances and that the Subdivider or Site Developer has satisfied the one-year Performance Guarantee period requirement. (c) Surface maintenance. During the period between the installation of the final surface course on the roadways and the termination of the one year Performance Guarantee period, the village engineer may request the Subdivider to seal all cracks that appear in the pavement section with an approved hot poured rubber asphalt sealing compound. (1) This crack sealing is limited to those cracks that normally occur due to volume and thermal shrinkage. (2) All other type of pavement distress will have to be properly repaired to the satisfaction of the village engineer. (3) All cracks shall be properly routed and air-blown clean in accordance with the manufacturer's recommendations and to the satisfaction of the village engineer. (d) Final acceptance and approval. No Project Improvements, public or private, shall be accepted or approved by the Corporate Authorities nor shall the Project Improvements be deemed to be "complete" prior to receipt of the village engineer's report specifying that the Project Improvements comply with this appendix, approved plans and specifications and any applicable planned development ordinance requirements and that all required as-builts have been received.

Ask a question about Palatine law

Corpus searches the Palatine sections it holds and shows the ones that match, with their citations. Free, no sign-in.