§ 151.25. - Required information.
(a) The construction plans shall be submitted on appropriate size sheets (24 inches by 36 inches) and to a minimum scale of one inch equals 100 feet. Construction plans shall contain the following information: (1) Cover sheet containing the location of the development; symbols that are used; index to sheets; summary of quantities; scales that are used; appropriate place for approval of the city engineer; and the signature and seal of a registered professional engineer. (2) North arrow and bench marks with their elevations noted. Bench marks shall be referenced to mean sea level datum as determined by the United States Geological Survey. (3) Plan sheets showing the locations of all existing and proposed streets, right-of-way lines, sanitary sewers, storm sewers, sidewalks, drainage ditches, easements, rear lot drainage, direction of storm drainage flow, survey monuments, water mains, fire hydrants, and any other appurtenance or structure that might influence design considerations. (4) Profile sheets indicating the existing ground line and proposed grades and elevations for all proposed streets, sanitary sewers, storm sewers, drainage structures, drainage ditches, and rear lot drainage. Elevations shall be referenced to the United States Geological Survey datum. (5) Typical sections showing right-of-way lines, proposed pavement widths, pavement thickness, base thickness, sub-base thickness, subgrade, crown, curbs and gutters, sidewalks, and design data when required. (6) Detailed sheets showing the details of manholes, inlets, catch basins, curb and gutters, drainage structures, and any other structure or appurtenance to be constructed, or reference made to the latest edition of the Standard Specifications for Road and Bridge Construction or the latest edition of Standard Specifications for Water and Sewer Main Construction in Illinois or the latest edition of the Highway Standards published by the State Department of Transportation. (7) Design computations for storm sewer design, special structures, and pavement designs when required. (b) Basic review of the construction plans shall be completed by the department of city engineering within 30 days of the submission date. When construction plans have been resubmitted, they will be re-reviewed and returned to the developer's engineer within 14 days, unless review time is extended by the city engineer in a letter listing reasons for the extension. This letter will be sent to the engineer who submitted the construction plans. When the construction plans have been approved by the city engineer and the city engineer has determined that the other city departments have approved the construction plans, the owner/developer may install the required public improvements. (c) The city engineer shall notify the owner/developer when the construction plans are approved and shall send a copy of such approval to the regional planning commission, the office of public utilities, and the city department of building and zoning. Once the construction plans have been approved, the owner/developer may proceed with the next step.
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.