§ 151.48 — Final plan, stage two
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 151.48
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/9138c3fc-1370-448b-b0a0-4c61ca86b0e1
§ 151.48. - Final plan, stage two.
(a) The owner/developer shall submit the final plan within six months following approval of the preliminary plan or the preliminary plan must be resubmitted for approval as called for in stage one except a public hearing shall not be required unless there are major changes in the plan. The documentation shall be presented to the regional planning commission for review and recommendation. The regional planning commission shall again refer copies to the city engineer, the city traffic engineer, the city department of building and zoning, the county superintendent of highways, city water, light, and power, and the Springfield Sanitary District for their review prior to the meeting. In the event a major change has been made as described under section 151.29, a second public hearing shall be held before the regional planning commission in the same manner called for in stage one, preliminary plan. (1) The final plan shall consist of a scale model or a rendered site plan to clearly indicate the character of all physical developments and their spacial relationships. (2) Drawings and data listed below will be provided along with certification of the owner/developer that the documents submitted are those plans he agrees to abide by in the physical development of the PED. a. The layout of vehicular circulation systems, pavement design data, and detailed public street construction plans. b. The layout of pedestrian circulation systems. c. Proposed topography at one-foot contour intervals. d. The location of buildings and structures. e. The location of lot lines for exchange of ownership, if any, and lot numbers. f. The use of buildings and the use of open space or other significant spaces or elements of the plan. g. The height of structures. h. The general surface drainage pattern, drainage capacity computations, and detailed storm sewer construction plans. i. Detailed sanitary sewer construction plans and design data. j. The location of proposed utility easements. k. Sketches or photos sufficient to indicate the general character of development. l. Proposed parking facilities for all uses. m. The covenants or other regulations to be placed on the land or agreements to be required of persons using the land. n. Show evidence for continuous maintenance of all open space. o. Permits for street intersections with highways maintained by public agencies other than the city. p. Detailed water supply and distribution plans. (3) Lines delineating area on the drawings to illustrate the time, increments, and phasing of the proposed development. (4) A certificate lettered on the plan indicating that the owner/developer agrees to abide by the plan for physical development of the site as represented in the submission and that future owner assigns will be required to abide by the same covenant. (5) A performance bond shall be provided to the city in the amount of 125% of the total cost of all public improvements called for in the planned experimental development. (6) Construction of all public improvements shall not commence until the final plan has been approved by the city. (b) When the final plan and drawing have been approved and all plans signed, an official record shall be made of this approval by the city planning and zoning commission and the total PED submission shall be recommended to the city for final approval. The final plan shall be recorded by the owner/developer within 30 days with the recorder of deeds of Sangamon County in the same way as a plat of subdivision is recorded. These plans must first be certified by the city planning and zoning commission indicating that the development plan has been approved and that the developer may proceed with development.
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
