§ 153.132. - Construction plan review process.

(a) After receiving approval of the preliminary plan, the subdivider shall submit six sets of construction plans to the city engineer who shall distribute them as follows: Two sets shall be retained by the office of public works (shall include items (a), (b), (c), (d), (e), (f), (g), (h), (i), (j), (k), (l) and (m) of section 153.131). One set to the electric division (shall include items (a), (b), (c), (d), (e), (f), (g), (h), (i), (j) and (m) of section 153.131); One set to the water division (shall include items (a), (b), (c), (d), (e), (f), (g), (h), (i), (j) and (m) of section 153.131); One set to the fire department fire safety division (shall include items (a), (b), (c), (d), (e), (f), (g), (h), (i) and (m) of section 153.131); One set to the Sangamon County Engineer when the subdivision is located outside of the corporate limits of Springfield (shall include items, (a), (b), (c), (d), (e), (f), (g), (h), (i), (j), (k), (l) and (m) of section 153.131). (b) Construction plans shall be submitted a minimum of 30 days before the final plat is to be submitted for review. (c) The department of city engineer shall complete its review within 30 days after all items of information required by section 153.131 have been submitted in writing. (d) Within 25 days after complete submission, the fire department fire safety division, electric and water divisions and the Sangamon County Engineer, if applicable, shall notify the city engineer in writing of any changes required in the construction plans or of their approval of them as submitted. (e) Within 30 days after complete submission, the city engineer shall notify the subdivider's engineer of approval of the plans or of any required changes unless the review time is extended for no more than 14 days by the city engineer in a letter to the subdivider's engineer listing reasons for the extension. If plans must be resubmitted, the city engineer shall also inform the engineer of the number of sets of plans to be submitted. (f) When construction plans are resubmitted with the required changes, they shall be re-reviewed within 14 days unless the review time is again extended by the city engineer in the manner set forth in subsection (e) above. (g) The city engineer shall notify the subdivider and the subdivider's engineer of the approval of the construction plans. Construction plans shall not be approved until proof of acquisition of a county access permit or 404 permit, if applicable, is submitted. The city engineer shall also send a notice of the approval to the: Planning commission. Electric division. Appropriate water division(s). Fire safety division of the fire department. Department of building and zoning. Springfield Metro Sanitary District. Sangamon County Engineer, if applicable. Other utility companies involved. (h) Construction plan approval shall remain valid for a three-year period after which approval expires and plans must be resubmitted.

(Ord. No. 804-10-93, § 1(Exh. A), 10-19-93; Ord. No. 264-07-12, § 1(Exh. A), 7-17-12)