§ 154.05 — Definitions
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 154.05
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/49c7ab47-aede-49fa-a628-f80542167ee7
§ 154.05. - Definitions.
For the purpose of this chapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning. Agricultural land use. Use of land for planting, growing, cultivating and harvesting of crops for human or livestock consumption and pasturing or yarding of livestock. Applicant. Landowner or landowner's designee. Best management practices (BMP). Those practices as described in the most current edition of the "Illinois Urban Manual" to control erosion and sedimentation. Certificate of occupancy. A document issued by the office of public works, department of building and zoning, which states that the described portion of the building complies with the requirements of the adopted edition of the International Building Code, and with the Springfield Zoning Ordinance, for the use group and division shown, and the use for which the proposed occupancy is classified. Certified professional in erosion and sediment control (CPESC). A person who is certified according to the policy and procedures as defined by Certified Professional in Erosion and Sediment Control, Inc. City. The City of Springfield, Illinois. City engineer. The city engineer of the City of Springfield, Illinois. Clearing. Any activity that removes the vegetative surface cover. Construction. Any land development, land disturbing or floodplain development activity. Construction site control measure. A control measure used to meet the requirements of the erosion control plan, or to otherwise improve the site with respect to erosion control. Control measure. A practice or combination of practices to control erosion and sedimentation pollution. Drainage way. Any natural or artificial watercourse, trench, channel, ditch, swale or similar depression into which surface water flows. Emergency activity. Any activity that is immediately necessary for the protection of life, property or natural resources. Erosion. The detachment and movement of soil, sediment or rock fragments by water, wind, ice, or gravity. Erosion control plan. A written description and drawing of the number, location, and size of BMPs and other pertinent information designed to meet the requirements of this chapter submitted by the applicant for review and approval. Fee. Payment by permittee in consideration of expenses incurred by the city, both in professional and consulting fees, and in time, materials, transportation and workload expended by city employees reviewing the erosion control plan and inspecting erosion control measures. Final stabilization. The occurrence of all of the following: (1) all land disturbing activities at the site have been completed; (2) no areas of active erosion are evident; (3) all temporary erosion control measures have been removed; (4) the plan of final site conditions has been met; and (5) a permanent perennial vegetative cover with a density of 70% of the cover for the area has been established or equivalent permanent stabilization measures have been employed. Floodplain development activity. An activity in a special flood hazard area as defined in the chapter 150 of City of Springfield, Illinois Code of Ordinances, as amended, including, but not limited to, construction, filling and excavating. Floodplain development permit. A floodplain development permit issued by the Springfield-Sangamon County Regional Planning Commission. Illinois Urban Manual. The manual prepared by the USDA Natural Resources Conservation Service for the Illinois Environmental Protection Agency as a technical reference for developers, planners, engineers, government officials and others involved in land use planning, building site development, and natural resource conservation in rural and urban communities and developing areas. Incidence of noncompliance (ION). An Illinois Environmental Protection Agency Incidence of Noncompliance form used to document a violation of the erosion control plan. Land development activity. The construction of buildings, roads, parking lots, storage areas and similar facilities. Land disturbing activity. Any man-made change to the land surface including removing vegetative cover, excavating, filling, scraping and grading; but not including agricultural land uses, growing and tending of gardens, harvesting of trees, or landscaping modifications. Land user. Any person or entity operating, leasing, renting, or having made other arrangements with the landowner by which the landowner authorizes use of land. Landowner. Any person or entity holding title to or having a legal or equitable interest in land. Licensed design professional. A licensed professional engineer or a certified professional erosion control specialist. Notice of intent (NOI). An Illinois Environmental Protection Agency Notice of Intent form requesting coverage under the Illinois Environmental Protection Agency's NPDES Permit No. ILR10 for storm water discharges from construction site activities. Notice of termination (NOT). An Illinois Environmental Protection Agency Notice of Termination form requesting the end of coverage under the Illinois Environmental Protection Agency's NPDES Permit No. ILR10 for storm water discharges from construction site activities. Notice of violation (NOV). A notice issued by the office of public works, department of building and zoning when the conditions of the erosion control permit are not being met. Office of public works, department of building and zoning. The Springfield, Illinois Office of Public Works, Department of Building and Zoning. Permit. An erosion control permit issued by the office of public works, department of building and zoning. Permit completion notice. An erosion control permit notice issued by the office of public works, department of building and zoning, when all disturbed areas have been permanently stabilized by permanent vegetation or other means. Permittee. The applicant in whose name a valid erosion control permit is duly issued pursuant to this chapter and any agents, employees, or others acting under the direction of the applicant. Professional engineer. A person licensed under the laws of the State of Illinois to practice professional engineering. Runoff. The rainfall, snowmelt, or irrigation water flowing over the ground surface. Site. The entire area included in the legal description of the land upon which the land disturbing or land development activity is proposed. Stop work order. An order issued by the office of public works, department of building and zoning when work is being performed without an erosion control permit or when a notice of violation corrective action has not been completed in the specified time. Storm water pollution prevention plan (SWPPP). A document required by the Illinois Environmental Protection Agency for coverage under the General NPDES Permit ILR10 for storm water discharges from construction site activities. The document is a written description of the erosion and sediment control plan for the construction site.
(Ord. No. 105-3-12, § 1(Exh. A), 3-6-12)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
