§ 154.15 — Requirements

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 154.15

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/9f83b1e1-e1ac-4f46-b252-3b49c16ce776

§ 154.15. - Requirements.

(a) Erosion control plans for areas less than one acre. The erosion control plan shall not require signature and seal of a licensed design professional. The erosion control plan shall include the following items: (1) Site location and boundary, including dimensions. (2) Location of existing features, including but not limited to, waterways, drainage swales, roadside ditches, curb and gutter or edge of pavement and sanitary and storm sewer structures. (3) Location of proposed structures. (4) Spot elevations, existing and proposed, at a minimum, for the following: edge of pavement or curb and gutter, property corners, slope changes and finish floor elevation of structures. (5) Location and dimensions of erosion control measures, including but not limited to, perimeter erosion barrier, inlet protection and stabilized construction entrance. (6) Name, address and phone number of the permittee. (b) Erosion control plans for areas one acre or more. The erosion control plan shall be signed and sealed by a licensed design professional and shall include the following items: (1) Site boundaries and adjacent lands which accurately identify site location; (2) Location of lakes, streams, wetlands, channels, drainage ways, ditches, other water courses and any other special areas, as defined by the Illinois Urban Manual, on both the site and adjacent lands; (3) Location of the 100-year floodplain including flood fringe and floodway or a statement that no part of the property is in a 100-year floodplain; (4) Location and general identification of the vegetative cover; (5) Location and dimension of on-site and off-site storm water drainage systems, including easements and natural drainage patterns on and immediately adjacent to the Site, and the size, slope and land cover of the upslope drainage areas; (6) Location and dimensions of utilities, easements, structures, roadways, highways, sidewalks, paved areas and other impervious surfaces; (7) Site topography at a contour interval not to exceed two feet, except that for slopes greater than 20%, a five-foot contour is acceptable. (8) Location of all proposed land disturbing activities and land development activities. (9) Identification, locations and dimensions of all site erosion control measures necessary to meet the requirements of this chapter. Installation details and cross-sections of erosion control measures shall be shown or referenced. (10) A written statement on the erosion control plan identifying the land owner or land user and the party responsible for maintaining site erosion control measures during construction. (11) A plan showing the permanent erosion control measures. (c) General criteria, standards and specifications. All erosion control measures required as part of any erosion control plan shall comply with the design criteria, standards and specifications identified in the most recent edition of the Natural Resources Conservation Service Illinois Urban Manual and most recent edition of Illinois Department of Transportation Standard Specifications of Road and Bridge Construction. The following standards and design elements are required and shall be addressed in all erosion control plans: (1) Erosion control sequence plan. All land disturbance activities including temporary erosion control best management practices, permanent vegetative cover and the various stages or phases of earth disturbance and construction shall follow a chronological sequence as shown on the erosion control plan. (2) Phasing plan. A phasing plan of land development shall be required for all sites. The area and schedule of each phase shall be shown. (3) Waste and material disposal. All waste and unused building materials (including garbage, cleaning wastes, wastewater, toxic materials, or hazardous materials) shall be disposed of following all federal, state and local regulations. (4) Stabilized construction entrance. Each site shall have a stabilized construction entrance installed to prevent sediment from being tracked onto public or private roadways. (5) Culvert and inlet protection. All on-site storm culverts and inlets, and the impacted off-site downstream culverts and inlets shall be protected with appropriate best management practices. (6) Runoff control. Runoff from the entire disturbed area on the site shall be controlled by all appropriate best management practices. If a channel or area of concentrated runoff passes through or adjacent to the site, silt fences shall be placed along the channel edges. Attention shall be given to the land area and slopes to be controlled before choosing an appropriate best management practices. (7) Sediment cleanup. All off-site sediment deposits occurring as a result of land disturbing activities shall be cleaned up by the applicant before the end of each workday. Flushing may not be used as a cleanup method. (8) Disturbance timing. Removal of existing vegetation shall be at a minimum. Existing vegetation shall be maintained until removal is necessary based upon each phase of construction. Appropriate best management practices shall be constructed prior to any land disturbance. Permanent vegetation shall be established as soon as practical after the completion of each phase of work on the site. (9) Temporary stabilization. Disturbed soil to be left inactive for more than 14 calendar days shall be stabilized by mulching, temporary seeding, sodding, covering with tarps, or equivalent control measures. (10) Soil and material storage pile(s). Soil and material storage pile(s) containing more than ten cubic yards of material shall not be located in a 100-year floodplain and must be at least 25 feet from a roadway ditch or drainage channel. If the storage pile(s) remain(s) 14 or more calendar days, the perimeter shall be stabilized utilizing appropriate best management practices. The 25-foot setback requirement from a roadway ditch or drainage channel shall not apply to areas under one acre. (11) Channelized and sheet flow drainage. Channelized and sheet flow runoff from adjacent areas passing through the site shall be diverted around disturbed areas, if practical, and the channel shall be protected. Diverted runoff shall be conveyed in a manner that will not erode the conveyance and receiving channels. If diversion of channelized flow and/or sheet flow is impractical, the flow shall be controlled through appropriate best management practices to prevent erosion and carrying off of sediment and pollutants. (12) Steep slope condition. Sites with slopes of 12 percent or more shall require use of additional best management practices. (13) Site dewatering. Water pumped from the site shall flow to a temporary sediment basin or other appropriate control designed for the highest dewatering pumping rate to prevent sediment from leaving the site. Water shall not be discharged in a manner that causes erosion of the site or receiving channels. (14) Final stabilization. The methods of final stabilization shall be identified. If seeding is to be used, the type of seed, rates and amount of seed shall be provided.

(Ord. No. 105-3-12, § 1(Exh. A), 3-6-12)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.