For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 154.21 — Inspection

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 154.21

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/cc5e0ccb-3d67-4090-8412-2cf2e3761a04

§ 154.21. - Inspection.

(a) The permittee shall have the designated qualified inspector or knowledgeable person inspect the constructed erosion and sediment control measures at least once each week and after each rain event of 0.5 inches or more within a 24-hour period and complete a written record of the inspection. (b) The city engineer, office of public works, department of building and zoning, or their designees shall inspect construction sites periodically to ensure compliance with the erosion control plan. During inspections, the permittee shall provide all inspection records upon request (weekly site inspection, 0.5 inch or greater rain event in 24 hours inspection, incidence of noncompliance report submitted to the Illinois Environmental Protection Agency). The erosion control plan and storm water pollution prevention plan shall also be on-site and available upon request.

(Ord. No. 105-3-12, § 1(Exh. A), 3-6-12)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.