§ 170.12.03 — Demolition permits

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 170.12.03

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/3130de9f-ae05-4476-b60e-8598d8b668b8

§ 170.12.03. - Demolition permits.

(a) Notwithstanding any provisions of article I, of chapter 170, the issuance of a demolition permit is conditioned upon the following: (1) The commencement of work upon the demolition project within a period of 20 days from the date of issuance of the permit, except in the case of an unsafe and dangerous building. (2) The completion of demolition work within a period of 60 days from the date of issuance of said permit; except that the department shall extend, without additional fee, permits for such major demolition projects which by their nature could not have been completed within 60 days, and such extension shall be for a reasonable time as the department may deem appropriate. (3) Except in those instances where the city has determined that a building or other structure presents an imminent danger to the public health, safety or welfare, whenever an application is submitted to the department of building and zoning for a demolition/wrecking permit for any building or structure identified on the list of properties potentially eligible for landmarking as promulgated by the Historic Sites Commission, the department shall delay action on the application for an initial period of 30 days from the date the application was received and follow the procedures set forth at chapter 101, section 101.16 of this Code pertaining to regulations for the demolition of landmarks and proposed landmarks. (b) Should the work not be completed within a period of 60 days as aforesaid, the contractor or owner may, prior to the expiration of the permit, make application for an extension of the period not to exceed an additional 30 days, and the department is hereby authorized to grant the extension thereof upon payment of a fee, which is based upon the amount of work remaining, and upon showing that work on the demolition project has been continuous and uninterrupted, or has been interrupted by reason of weather or other conditions not under the control of the contractor or owner. (c) Failure to begin work within a period of 20 days shall be cause for the cancellation of the permit. Failure to complete the demolition work within a period of 60 days or an extension thereof shall subject the owner of the property to penalties as provided under section 170.10.999. (d) Once demolition work begins, all work shall be completed the same day, and all debris shall be removed from the site the same day. If the debris cannot be removed from the site the same day, no trespassing signs shall be posted, and caution tape must be placed around the debris. If the demolition of the structure cannot be completed the same day, then a 48-inch high fence, with openings less than four inches in size, shall be installed around the demolition site. In addition, all excavations greater than 36 inches in depth shall be immediately backfilled, except that in the event that new construction is to be erected on the demolition site, the site need not be graded or leveled as hereinafter provided. If, however, an excavation greater than 30 inches in depth remains after completion of demolition, a 48-inch high fence, with openings less than four inches in size, shall be installed and maintained around the excavation, with "no trespassing" signs posted. The owner or contractor must make application for a building permit within 30 days after completion of demolition, and in no event shall any demolition site be left ungraded or not leveled for a period of more than 30 days, unless actual construction shall have commenced thereon. However, if new construction is not to be erected on the demolition area but elsewhere on the premises, then the demolition area must be graded and leveled to ground level, or otherwise placed in a safe condition by fencing as described above. This fencing shall be limited to one year. (e) It shall be an express term of any contract of demolition that the job site is to be left at grade level free and clear of any debris, including brick and broken concrete, and in a safe condition. All debris shall be disposed of in an approved, licensed landfill.

(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06; Ord. No. 409-11-13, § 1(Exh. A), 11-19-13)