For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 51.63 — Permits

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 51.63

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/2ca95f18-78a1-41aa-8492-3cafc47b188a

§ 51.63. - Permits.

(a) No person shall construct, alter, or extend a private sewage disposal system within the city unless he holds a valid permit issued by the department of building and zoning stating the name of such extension as proposed. The permit shall indicate a maximum permissible waste loading. (b) All applications for permits granted under the provisions of this article shall be made to the building department. The permit shall be issued to persons applying for such permit who qualify under the provisions of this article and who conform with the minimum design and performance standards of this article. No permit shall be issued unless the application has been approved by the office of public health and the office of public works. (c) A permit shall only be issued to an Illinois licensed private sewage disposal system contractor or a homeowner installing his own residential sewage disposal system. (d) Permit application forms shall be provided by the department of building and zoning, shall be completed and signed by each applicant and shall include the following: (1) The name and address of the applicant and the contractor. (2) A plot plan showing the location of the property, any building, septic tank, seepage field and potable water service. (3) A statement of the quantity of the average anticipated daily flow of sewage. (4) Construction plans and specifications for the proposed disposal facility sufficient to verify conformity with the state private sewage disposal licensing code. (5) Percolation tests as required by this article shall be conducted by either an Illinois licensed private sewage disposal system installation contractor, an Illinois registered engineer or architect, an Illinois registered sanitarian, a soil scientist, an authorized representative of the health department or other professional persons acceptable to the health agency. (6) Such other information as may be required by the department of building and zoning to substantiate that the proposed construction, alteration, or extension complies with the minimum standards of this article. (e) The department of building and zoning shall refuse to grant a permit for the construction, alteration, or extension of a private sewage disposal system where public sewage systems are available. A public sewer shall be deemed available when a public sewer line is in place within any street, alley, right-of-way, or easement that adjoins or abuts the premises for which the permit is requested, or is located in or under the premises for which the permit is requested, or when the premises to be served is located within a reasonable distance from a public sewer to which a connection is practical and is permitted by the controlling authority for the public sewer. A reasonable distance from the public sewer to the closest boundary line of the premises for the purpose of this provision shall be deemed to be not greater than 200 feet for a single-family residence and not greater than 1,000 feet for a commercial establishment or a multi-family dwelling. (f) The department of building and zoning and/or office of public health shall act on all applications within 15 days of receipt. (g) There shall be a permit fee in the amount of $20 for a system that is altered or extended and $40 for a new system. The fee shall be collected by the department of building and zoning at the time an application for the permit is submitted, and shall be deposited into the corporate fund. (h) The permit shall be valid for a period of one year from the date of issuance. If construction is not started within this period, the permit is void.

(Ord. No. 670-9-95, § 1(Exh. I), 9-19-95; Ord. No. 585-10-03, § 1(Exh. 1), 10-21-03)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.