§ 10.16.020 — Wastewater discharge permits
Code of Ordinances, City of Bloomington, Indiana (Supp. No. 51, Update 1: codified through Ordinance No. 2026-15, passed July 17, 2026) · Bloomington Municipal Code § 10.16.020
Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/53e09759-bb7c-488c-a769-70d92f931220
10.16.020 - Wastewater discharge permits.
No significant industrial user shall discharge wastewater into the POTW without first obtaining an individual wastewater discharge permit from the director. The director may require other users to obtain individual wastewater discharge permits as necessary to carry out the purposes of this title. All existing industrial dischargers connected to or discharging to the POTW shall obtain a wastewater discharge permit within ninety days after the effective date of the ordinance codified in this title. Any violation of the terms and conditions of an industrial wastewater discharge permit shall be deemed a violation of this title and subjects the wastewater discharge permittee to sanctions set forth in Chapter 10.30 of this title. (a) Permit Application. Industrial dischargers shall complete and file with the city, a permit application in the form prescribed by the city, and accompanied by the appropriate fee. Existing industrial dischargers shall apply for a wastewater discharge permit within thirty days after the effective date of the ordinance codified in this chapter, and proposed new industrial dischargers shall apply at least ninety days prior to connecting to the POTW. No discharge permit shall be issued unless and until the following conditions have been met: (1) Disclosure of name, address, and location of the discharger; (2) Disclosure of standard industrial classification (SIC) number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended; (3) Disclosure of wastewater constituents and characteristics, including, but not limited to, those mentioned in this title, including Section 307 of the Act as appropriate, as determined by bona fide chemical and biological analyses. Sampling and analysis shall be performed in accordance with procedures established by the U.S. EPA and contained in 40 CFR, Part 136, and 40 CFR 403.12 as amended; (4) Disclosure of time and duration of discharges; (5) Disclosure of average daily and instantaneous peak wastewater flow rates, in gallons per day, including daily, monthly and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the city due to cost or nonfeasibility; (6) Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location and elevation; (7) Description of activities, facilities and plant processes on the premises including all materials which are or may be discharged to the sewers or works of the city; (8) Disclosure of the nature and concentration of any pollutants or materials prohibited by this title in the discharge, together with a statement regarding whether or not compliance is being achieved with this title on a consistent basis and if not, whether additional operation and maintenance activities and/or additional pretreatment is required for the industrial discharger to comply with this title; (9) Where additional pretreatment and/or operation and maintenance activities will be required to comply with this title, the industrial discharger shall provide a declaration of the shortest compliance schedule by which the industrial discharger will provide such additional pretreatment and/or implementation of additional operational and maintenance activities; (10) Users shall provide wastewater treatment as necessary to comply with this title and shall achieve compliance with all categorical pretreatment standards, permit limits, local limits, and the prohibitions set out in Chapter 10.12 of this title within the time limitations specified by EPA, the state, or the director, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the director for review, and shall be acceptable to the director before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the city under the provisions of this title; (11) Disclosure of each product produced by type, amount, process or processes and rate of production; (12) Disclosure of the type and the amount of raw materials utilized (average and maximum per day); (13) All permit applications for new or modified permits shall be signed by an authorized representative of the user; (14) All sewers shall have an inspection and sampling manhole or structure with an opening of no less than twenty-four inches diameter and an internal diameter of no less than thirty-six inches containing flow measuring, recording and sampling equipment as required by the city to assure compliance with this title. The city will evaluate the complete application and data furnished by the industrial discharger and may require additional information. Within thirty days after full evaluation and acceptance of the data furnished, the city shall issue a wastewater discharge permit subject to terms and conditions provided herein; (15) Develop, submit to the city for approval, and implement a slug control plan pursuant to Section 10.16.030(g). (b) Permit Terms and Conditions. The terms and conditions of each wastewater discharge permit shall include, but not be limited to, the following: (1) Fees and charges to be paid upon initial permit issuance; (2) Effluent limits, best management practices, categorical pretreatment standards, local limits, state and local laws, and effluent limits on the average and maximum wastewater constituents and characteristics regulated thereby; (3) Effluent limits on average and maximum rate and time of discharge and/or requirements for flow regulations and equalization; (4) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (5) Special conditions as the city may reasonably require under particular circumstances of a given discharge including sampling locations, frequency of sampling, number, types, and standards for tests and reporting schedule; (6) Any grant of a monitoring waiver by the director (Section 10.16.060) must be included as a condition in the user's permit; (7) Compliance schedules and progress reports as required by Section 10.16.015 of this chapter; (8) Requirements for submission of special technical reports or discharge reports where same differ from those prescribed by this title; (9) A slug control plan as required by Section 10.16.030(g) of this title; (10) A statement of duration (effective date and termination date); (11) A statement of non-transferability; (12) Requirements for self-monitoring, sampling, reporting, notification, and recordkeeping. These requirements shall include an identification of pollutants or best management practices to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; (13) The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge; (14) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedules may not extend the compliance date beyond applicable federal deadlines. (c) Permit Effective Date. The effective date of the wastewater discharge permit is the date in which the USB approves and signs the permit. (d) Permit Duration. No wastewater discharge permit shall exceed five years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five years at the discretion of the director. Each wastewater discharge permit will indicate a specific date upon which it will expire. (e) Permit Renewal. Wastewater discharge permits are renewable. To renew a wastewater discharge permit the permittee must apply for renewal no later than four months prior to the expiration date of the permit. Otherwise the permittee must apply for a new permit. (f) Permit Transfer and Assignment. Wastewater discharge permits are issued to a specific user at a specific location for a specific operation, and are not assignable to any other user and are not transferable to any other location, without prior written authorization from the director. (g) Permit Modification. (1) The city may modify any wastewater discharge permit in order to ensure the city's compliance with applicable laws and regulations. (2) Changes in National Categorical Pretreatment Standard. (A) No later than one hundred eighty days after the promulgation of any applicable National Categorical Pretreatment Standard, all industrial dischargers shall submit to the city the information required by subsections (a)(8) and (a)(9) of this section. (B) No later than nine months after the promulgation of any applicable National Categorical Pretreatment Standard, the wastewater discharge permit of each industrial discharger subject to such standards shall be modified to reflect such standards. (3) All industrial dischargers shall be informed of any proposed modifications in their permit at least sixty days prior to the effective date of modification. (4) Any modification to a permit shall include a reasonable time schedule in which the industrial discharger shall comply.
(Ord. No. 19-05, § 16, 2-20-2019)
Ask a question about Bloomington law
Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
