For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.04.030 — Water quality treatment hot spot developments

Code of Ordinances, City of Bloomington, Indiana (Supp. No. 51, Update 1: codified through Ordinance No. 2026-15, passed July 17, 2026) · Bloomington Municipal Code § 13.04.030

Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/fd0f7a4e-e3bd-4bcb-a1f8-a8a1b406e8f3

13.04.030 - Water quality treatment hot spot developments.

(a) Purpose. The purpose of this section is to mitigate the impact of stormwater runoff from hot spot developments such as gasoline outlets, vehicle maintenance facilities, parking areas, and industrial sites. Refer to the stormwater design manual for more information on hot spot developments. (b) Applicability. All projects which are required to obtain a stormwater management permit and are creating a hot spot development. A parking lot is considered a hot spot development when there is the creation of a new parking lot at least one thousand five hundred square feet in size, or an existing parking lot is expanded by at least one thousand five hundred square feet. (c) Exemptions. (1) Single-family residential developments including duplexes, triplexes, and fourplexes. (2) The assistant director of the engineering division or their designee may determine that full compliance with Section 13.04.030 is not feasible. In such a case, compliance will be required to the extent possible as determined by the assistant director of the engineering division or their designee. (d) Water Quality Treatment Requirements for Hot Spot Land Uses. The development of hot spot land uses shall include water quality treatment BMPs sufficient to treat the proposed pollutants. Refer to the stormwater design manual for BMP specifications. (e) Bioretention Standards in Parking Lots. Surface parking lots expand impervious surface coverage, create water quality challenges, and increase runoff. This section's requirements counter these impacts while incorporating green infrastructure into parking lots. (1) Parking lots shall be constructed such that the water quality volume (WQV) is directed into bioretention facilities located in the interior of or immediately adjacent to the parking lot. Refer to the stormwater design manual for determining WQV and BMP specifications. (2) Bioretention facilities shall be located below the grade of the parking lot to facilitate runoff to flow into the facilities. (3) Bioretention facilities shall be vegetated with appropriate perennials, grasses, shrubs, and/or trees that comply with Section 13.04.050. (4) Bioretention facilities shall comply with the City of Bloomington Stormwater Design Manual. Shrubs shall be planted at least five feet from any underdrain; trees shall be planted at least ten feet from any underdrain.

(Ord. No. 2024-08, § 1, 5-8-2024; Ord. No. 2025-24, § VII, 7-30-2025)

Ask a question about Bloomington law

Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.