13.08.020 - Permits and review procedures.

(a) Preliminary Review. (1) At the request of an applicant, a preliminary review of stormwater management plans can be conducted by CBU prior to a project receiving approval from City of Bloomington boards, commissions, and/or city council or similar approvals that are delegated to staff level approvals. Often such a review is required or encouraged by a department other than CBU or by sections of BMC other than Chapter 13. Such reviews are also requested by designers to determine the constructability of a project. This review is intended to provide high-level feedback from CBU and find any serious issues with the feasibility of a project. (2) Submittal Requirements. (A) Plans prepared by professional engineers, land surveyors, and/or architects, as appropriate. (B) Drainage calculations. (C) Refer to the CBU Stormwater Design Manual for additional requirements. (3) Review Procedures. (A) Any projects applying for a preliminary review shall be submitted at least nineteen business days before the board/commission/city council hearing at which the project will be heard. (B) Staff shall provide review comments in a narrative form and submit them to the petitioner and the City staff members who prepare the hearing packet for the board/commission/city council prior to the packet being sent out. (b) Stormwater Management Permit. (1) Purpose. The purpose of the stormwater management permit and procedure is to mitigate the environmental impact of development and to protect the water quality of the City of Bloomington and surrounding areas. This permit and procedure is a mechanism to ensure compliance with the MS4GP and this SMO by providing a thorough review and permitting process as well as inspection and close-out process for all construction activities which affect stormwater. (2) Applicability. (A) No land-disturbing activity, development, or redevelopment of land that is subject to this chapter shall occur unless a stormwater management permit has been issued except as exempted in Section 13.08.020(b)(3), below. (B) New retail gasoline outlets and new MS4-owned fueling areas or those that replace their existing tank systems, regardless of size, are required to install appropriate measures to reduce lead, copper, zinc, and polyaromatic hydrocarbons in stormwater run-off. (3) Exemptions. (A) Land-disturbing activity that is cumulatively less than two thousand five hundred square feet. (B) Land-disturbing activity on a single-family residential lot or lots containing duplexes, triplexes, and fourplexes, which is less than one acre and not part of a larger common plan for development or sale. (C) City of Bloomington infrastructure projects that disturb less than one acre of land and have a negligible effect on the stormwater system, as determined by the assistant director of the utilities engineering division or their designee after considering the following factors: (i) Existing and proposed impervious surfaces, (ii) Existing and proposed facilities that adequately achieve detention and water quality requirements, (iii) Proximity to sensitive hydrological features, (iv) Size of the project, and (v) Any other adverse impacts the project may reasonably have on the MS4. (D) Projects which are already regulated by a MS4 other than the City of Bloomington (e.g. Indiana University and Indiana Department of Transportation). (E) Activities exempted under Section 13.05.010(b). (4) Additional Requirements. (A) Compliance with the standards of this SMO shall not relieve any person of the independent obligation to comply with all applicable standards and practices set out in the Indiana Administrative Code, The Indiana Department of Environmental Management, all applicable provisions of the Bloomington Municipal Code, and all applicable rules, regulations, standards, and specifications of any city department regarding development, redevelopment, or land-disturbing activity. (5) Stormwater Management Permit Process. The stormwater management permit (SMP) process will be similar for all projects and will be simplified for sites not requiring CSGP coverage. Refer to the stormwater design manual for information on the applicability of the CSGP and SMP application process details. (A) Submittal Requirements. (i) Completed stormwater management permit application. (ii) Full set of sealed construction plans that include the information required by the stormwater design manual and the CBU rules and regulations. (iii) Stormwater drainage report that includes the information required by the stormwater design manual and the CBU rules and regulations. (iv) For projects requiring new or modified stormwater infrastructure or BMPs, a draft operation and maintenance plan and a performance bond estimate prepared by a licensed engineer. (B) Plan Review. Once the application is deemed substantially complete, the following will take place: (i) Review will be conducted by CBU and/or its plan review consultant(s). Comments and deficiencies will be provided to the applicant. The applicant may be required to resubmit materials for additional review. (ii) The applicant may not submit the NOI to IDEM (if applicable) or commence land-disturbing activities until the stormwater management permit is issued. (C) Permit Issuance. The stormwater management permit will be issued after the submittal review is completed, all fees are paid, and a preconstruction meeting has been held. In issuing a stormwater management permit, CBU may impose such terms and conditions as are reasonably necessary to meet the purposes of this chapter. The project site owner is responsible for compliance with this chapter, the City of Bloomington Stormwater Design Manual, the CSGP (as applicable), and these terms and conditions. (D) Post-Permit Issuance. (i) Duration. a. The stormwater management permit shall remain active until the permit is closed via written notice from CBU, or if (b) below is met. b. The stormwater management permit shall expire three hundred sixty-five days after issuance if earth-disturbing activities have not yet taken place unless an extension is granted by the director. c. If a project has received a stormwater management permit and has begun earth-disturbing activities but then becomes inactive for a period of one hundred eighty days or longer, the stormwater management permit shall expire. A new stormwater management permit shall be obtained before work resumes. (ii) Changes or Amendments. a. The stormwater management permit applicant shall submit revisions or amendments to an approved permit for consideration by the local, state, and federal authorities having jurisdiction prior to installation of such revisions or amendments. A revision or amendment to an approved stormwater management permit shall only be authorized upon review and written approval by all local, state, and federal authorities having jurisdiction. b. CBU reserves the right to require the responsible parties to remove any and all unapproved improvements which may impact stormwater at the responsible parties' expense. (iii) Termination of the Permit. The stormwater management permit shall terminate when either the permit expires in accordance with Section 13.08.020(b)(3)(D)(i) or the permitted project receives written notification from CBU that the permit has been closed in accordance with Section 13.08.050. (c) Drainage and/or Utilities Easements. (1) Purpose. The purpose of this section is to outline the procedures for obtaining and recording unplatted drainage and/or utility easements, modifying unplatted drainage and/or utility easements, terminating unplatted drainage and/or utility easements, and vacating unplatted easements and to ensure statutory requirements of the Indiana Code and the MS4 General Permit are met. (2) Applicability. This Section 13.08.020(c), governs easements that are: (A) Required and/or granted pursuant to a provision of this SMO; (B) Permitted or required as a commitment or condition of approval for unplatted drainage and/or utility easements; (C) Previously dedicated unplatted drainage and/or utilities easements; or (D) Any other instances in which an easement would be required by CBU. (3) Easement Procedures. (A) With the exception of platted easements, all other proposals to create, terminate, vacate, or modify drainage and/or utilities easements shall be reviewed and approved by CBU prior to such easement documents being recorded at the Monroe County Recorder's Office. (B) Drainage and/or utilities easements shall be required for: (i) Private stormwater drainage systems that drain the right-of-way or two or more lots; and (ii) Private retention/detention facilities, and water quality infrastructure. (C) All drainage easements: (i) Shall prohibit any alteration within the easement that would hinder or redirect flow. (ii) Shall provide that the owner of the lot on which the easement is placed shall be responsible for maintenance of the drainage features within such easement. (iii) Shall be enforceable by CBU and by owners of properties that are adversely affected by conditions within the easement. (iv) Shall allow CBU to enter upon the easement for the purpose of maintenance, to charge the costs of such maintenance to the responsible parties, to construct drainage facilities within the easement, and to assume responsibility for the drainage features at its discretion. (D) Form. Easement instruments shall be prepared in a recordable form acceptable to the city legal department and CBU. (E) Recording. Approved easement instruments shall be recorded in the Monroe County Recorder's office. A copy of the easement shall be delivered to CBU in a format that is acceptable to CBU staff. The grantor shall be responsible for any and all costs associated with recording the easement document. (F) Encroachments. All encroachments into a drainage easement require prior written approval from CBU in the form of an encroachment agreement. Any encroachment into a drainage easement without an encroachment agreement will be subject to enforcement and may be directed to be removed from the easement at the property owner's expense. (G) Covenants, Conditions, and Restrictions. Inclusion of language defining easements in an instrument creating covenants, conditions, and restrictions shall not be sufficient to create, modify, terminate, or vacate an easement. Easement instruments shall be independently recorded documents that may be modified, terminated, or vacated only as provided in this SMO.

(Ord. No. 2024-08, § 1, 5-8-2024; Ord. No. 2025-24, §§ XVIII—XXII, 7-30-2025)