§ 2.29.040 — Evaluation and upgrade of existing and subsequently-acquired buildings
Code of Ordinances, City of Bloomington, Indiana (Supp. No. 51, Update 1: codified through Ordinance No. 2026-15, passed July 17, 2026) · Bloomington Municipal Code § 2.29.040
Corpus is an independent public-information project, not the official City of Bloomington website. Stable reference: corpuslaw.us/code/f6ea10cd-ce88-4ba6-9ad9-fceda2552e29
2.29.040 - Evaluation and upgrade of existing and subsequently-acquired buildings.
(a) Unless otherwise exempt per 2.29.050 below or subject to the standards of 2.29.030(a) or (b) above, all occupiable city buildings should eventually be brought up to at least LEED - EB:O&M Silver standards. In the interest of determining the extent and timing by which occupiable City buildings should be upgraded to LEED standards, the city shall conduct an evaluation of all existing and subsequently-acquired occupiable city buildings. The evaluation shall consist of two phases. (1) Phase I - Basic Inventory: During Phase I, the city shall conduct a limited study of all existing buildings to discern which buildings qualify for Phase II of the evaluation process. (A) During Phase I, the city shall collect data on existing city buildings, including, but not limited to: (i) age of the building; (ii) number of employees who occupy the building daily; (iii) number of public who visit the building daily; (iv) existing utility bills; (v) number of square feet; and (vi) building type (B) Phase I shall be completed within one year after the adoption of the ordinance from which this chapter derives. (2) Phase II - Analysis: During Phase II, the city shall examine systems that effect building performance. (A) During Phase II, the city's analysis shall include, but not be limited to the efficiency of the following building features: (i) the building envelope, including the walls, windows, roofs and doors; (ii) the heating, ventilation and air conditioning system (HVAC) including all fans, boilers, and compressors and the energy that they use; (iii) the lighting systems including the amount of energy used per square foot for lighting, and the amount of time that the light is on versus the amount of time it is needed; and (iv) the interior finish systems, their maintenance and the impact they may have on the interior environment. (B) After the foregoing systems are examined, the city shall perform a cost- benefit analysis of the costs of bringing each building up to LEED Silver. In the interest of maintaining close control of the cost, the city shall pursue the LEED Silver standard only when the payback period is no more than 10 years. In the event the cost-benefit analysis shows the anticipated payback to be more than 10 years, the persons responsible for the project shall recommend to the board having authority over the project which level of LEED certification is appropriate for that particular project. If no level of LEED certification is possible, then the project under consideration shall implement as many components of the LEED program as feasible. (C) For all existing buildings, Phase II shall be completed by December 31, 2020. Starting January 1, 2011, at least one building per year shall be subjected to Phase II analysis. (b) For all existing occupiable City of Bloomington buildings whose payback period does not exceed 10 years per Phase II above, the city shall complete the following by December 31, 2022: 1) register the building with the United States Green Building Council under the LEED-EB:OM program and 2) and implement operational improvements and equipment upgrades necessary to obtain certification. The city will then continue with the LEED certification process. The December 31, 2022 deadline shall be subject to available funds. (c) Subsequently-acquired occupiable City of Bloomington buildings obtained after the passage of the ordinance from which this chapter derives shall be subject to the evaluative process outlined in 2.29.040(a) if said building will not immediately undergo major renovation as defined in section 2.29.020 above. Where a subsequently-acquired building does not undergo immediate major renovation, and where said building is not exempt per 2.29.050 below, the city shall undertake Phase I and Phase II evaluations as described above and complete these evaluations within three years of acquiring the building.
(Ord. No. 09-04, § I, 3-25-2009)
Ask a question about Bloomington law
Corpus searches the Bloomington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
