§ 13.05.190: Extending sewers – Qualifications – Inspection.
(A) The utility shall perform a capacity review of the plans for the proposed extension and under normal conditions shall notify the Indiana Department of Environmental Management and the parties proposing the extension within two weeks of its submittal. The utility shall complete final design plan review within one month of the submittal. The utility shall have the right to modify the proposed extension to increase capacity or service area beyond the development or land owned or controlled by the developer and shall participate in the cost of such modifications as approved by the Utility Board. Construction of any extension shall not be started until final approval of the plans has been granted by the utility and by the Indiana Department of Environmental Management (IDEM). The utility operations staff shall be notified two working days before construction of the sewer extension begins and they shall be renotified at least one working day before construction re-starts after an interruption of work. All work is to conform with the approved plans plus adopted utility regulations and standards. Prior to adopting regulations and standards, a public hearing shall be held to receive comments. (B) Construction of any extension of the sewer system, including building sewer laterals on public right-of-way, shall only be done by a contractor who has qualified by having a $10,000 bond on file with the Evansville Water and Sewer Utility along with a current certificate of insurance in amounts specified by the board. The board may disqualify for cause any contractor who fails to perform in accordance with the plans and specifications and the rules and regulations of the State of Indiana, the Utility Board, and this chapter. (C) Inspections during construction may be done by the utility. The utility shall be notified at least two days before any sewer testing. The expense of after-hours inspections shall be paid by the applicant or contractor requesting the special inspection. Upon completion, the applicant or his engineer/contractor shall request in writing a final inspection and acceptance for maintenance. Where applicable, certified test results of leakage and pipe deflection and one set of “as-built” drawings shall accompany the request. Under normal conditions a list (i.e., “punch list”) of required corrections will be compiled and submitted within three weeks to the applicant and his engineer and contractor. The applicant shall respond within four weeks that the punch list items have been completed or will be completed within a stated reasonable time. This procedure shall be repeated as necessary and the applicant shall be notified in writing when the system has passed final inspection. The applicant shall submit one set of reproducible mylar copies of the “as-built” drawings showing all final sewer and manhole elevations prior to the utility notification of final approval. All sewers built under these requirements shall be completed and accepted within one year of the date of approval for construction unless approved otherwise by the Utility Board. Larger developments may be completed in sections, and each individual section shall be treated as a separate project with separate inspection and testing records. The original approvals from IDEM and the Utility Board of the sewer plans for the total project shall not be affected by the separation of construction into various sections. (D) Prior to final acceptance there shall be no discharge into the sewer systems except that the applicant may request partial use of the sewer system and approval shall be granted by the utility for a permitted discharge if all sewer pipe construction and all sewer tests have been approved by the utility staff and the applicant has posted surety with the board or Area Plan Commission sufficient to complete the incidental items for final approval by the board. (E) The utility shall not restrict the issuance of a building permit for a building that will connect to a sewer extension if the sewer extension plans have been approved and the sewer extension applicant has posted surety sufficient to complete the sewer extension with the Area Plan Commission or utility and agrees to turn the sewer extension over to the utility. (F) The bond filed hereunder shall be for the use and benefit of the board in making needed repairs and/or completing construction.
( 1962 Code § 923.06 ; Ord. G-74-21 , passed 5-6-1974 ; 1982 Code § 50.43 ; Ord. G-81-3 , passed 1-25-1982 ; 1983 Code § 5.50.43 ; Ord. G-90-12 , passed 6-12-1990 ; Ord. G-90-30 , passed 11-28-1990 )
Ask a question about Evansville law
Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.