§ 13.05.290 — Schedule of tap-in and connection charges
Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 13.05.290
Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/1e4ed704-cc6f-4a6e-900e-a3b19f41b525
§ 13.05.290: Schedule of tap-in and connection charges.
(A) For the purpose of this section, the following definitions shall apply unless the context clearly indicates or requires a different meaning: “City sewer system” means the sanitary sewer system of the City, located both within the City limits and within that area beyond the boundaries of the City limits, over which the City and Board of Public Works have jurisdiction as to sewers. “Connection” and “tap-in” shall be identical whether used independently or jointly and shall cover not only situations where there is an initial or first tap-in or connection into the City sewer system but also where improvements which are already connected are additions to, enlargements of, or expansions of the existing improvements. “Improvement” means any building, structure, or physical enclosure, whether attached or unattached to real estate, and whether mobile or immobile. “Plumbing” means any piping governed by the Indiana Plumbing Code, the sanitary sewer lateral between a building and the main, and the water service supply from the stop-box to the building. “Warehouse” means a building used primarily for the storage of goods and merchandise and that does not involve assembly or the manufacture of goods and merchandise. (B) There is hereby imposed a tap-in charge upon all persons who shall hereafter do either of the following: (1) Tap-in to the sewer system which is either publicly or privately owned and which is either a part of the City sewer system or directly or indirectly or eventually extends to or flows into the City sewer system; or (2) Add to an existing improvement a structure to which plumbing of any sort is extended. The charge shall be imposed if the existing improvement is connected or tapped into a sewer line which is either publicly or privately owned, the line is either a part of the City sewer system or directly or indirectly or eventually extends or flows into the sewer system. The tap-in charge shall be paid to the Utility Department prior to obtaining a permit for construction on the premises. The Building Commissioner shall not issue any permit until such tap-in charge has been paid to the Utility Department. No fee shall be charged if an addition to an existing improvement is due to complying with the Americans with Disabilities Act (ADA) and does not involve the installation of additional fixtures or an increase in sewer usage. This exemption shall apply to all applications received after January 1, 1993. (C) The charges shall be as follows: (1) A residential single-family house or condominium single-family unit (excluding mobile homes, trailers, motor homes, or other similar vehicular-type construction): $1,500 each effective July 1, 2015. This fee shall be adjusted each year on July 1st beginning July 1, 2016, in the following dates and amounts: July 1, 2016 | $1,800 July 1, 2017 | $2,000 July 1, 2018 | $2,100 (2) A residential duplex home (excluding mobile homes, trailers, motor homes, or other similar vehicular-type construction): 0.5 times the residential single-family house charge per living unit. (3) Apartments and townhouses: 0.5 times the residential single-family house charge per unit. (4) Hotels and motels: 0.5 times the residential single-family house charge per rental room. (5) Hospitals and nursing homes: 0.5 times the residential single-family house charge per bed planned as of the time of connection. (6) Mobile home, trailer, motor home, or other similar vehicular-type improvements: 1.0 times the residential single-family house. (7) Industrial, commercial, office, professional or educational improvements or schools, and any and all other types of improvements of every kind and nature, which are not specifically listed above, shall be charged a tap-in fee based on the size of any new water meter. The charges shall be calculated using the following equivalency factors times the residential single-family house charge: Meter Size | Equivalency Factor ⅝ inch meter | 1.0 ¾ inch meter | 1.4 1 inch meter | 2.5 1¼ inch meter | 4.0 1½ inch meter | 5.7 2 inch meter | 10.0 3 inch meter | 23.0 4 inch meter | 40.0 6 inch meter | 91.0 8 inch meter | 162.0 10 inch meter | 253.0 12 inch meter | 365.0 No credits shall be applied to the sewer tap fee for previous water service meter size or previous sewer tap fees paid for any new water meter or water meter size increase. (8) Churches and improvements built by churches or church-owned property and devoted solely to church-related activities: 1.0 times the residential single-family house charge per improvement. (9) Warehouse. The sewer tap-in fee will be based on the size of any new water meter(s) or existing water meter size change. The charges shall be calculated using the following equivalency factors times the residential single-family house charge: ⅝ inch meter | 1.0 ¾ inch meter | 1.4 1 inch meter | 2.5 1¼ inch meter | 4.0 1½ inch meter | 5.7 2 inch meter | 10.0 3 inch meter | 23.0 4 inch meter | 40.0 6 inch meter | 91.0 8 inch meter | 162.0 10 inch meter | 253.0 12 inch meter | 365.0 No credits shall be applied to the sewer tap fee for previous water service meter size or previous sewer tap fees paid for any new water meter or water meter size increase. (D) Tap-In Fee Exemption. The tap-in fee for any new single-family home constructed on property designated as an economic revitalization area and approved for tax abatement by City Council shall be reduced to 0.375 times the residential single-family house charge per living unit, subject also to any other exemptions or reductions allowed in this chapter. This subsection shall apply to any home for which a building permit is issued on or after February 1, 1994. Any new single-family home constructed by a not-for-profit organization exempt from income taxes under 26 USCA 501 of the Internal Revenue Code shall be exempt from the tap-in fee provided by subsection (C)(1) of this section so long as all the following apply: (1) The house is constructed for sale to low income individuals who could not otherwise afford such a home; (2) The purchaser of the house is not an officer or employee of the not-for-profit organization; (3) The house is not constructed for the use of the not-for-profit organization; (4) The not-for-profit organization complies with all fair housing laws and does not discriminate against any potential purchaser on the basis of race, color, creed, religion, national origin, sex, or handicap; and (5) The not-for-profit organization does not charge interest to the purchaser. All other provisions of this chapter shall apply, including, but not limited to, obtaining all necessary permits and construction standards. (E) Any single-family house to be remodeled or relocated by a not-for-profit organization exempt from income taxes under 26 USCA 501(C) of the Internal Revenue Code shall be exempt from the tap-in fee provided by subsection (C)(1) of this section so long as all of the following apply: (1) The house is owned by said not-for-profit organization at the time of application for the permit; (2) The house is remodeled or relocated for sale or lease to low income persons (as defined by the U.S. Department of Housing and Urban Development); (3) Such low income purchaser or tenant is not an officer, agent or employee of said not-for-profit organization; (4) The house is not remodeled or relocated for the use of the not-for-profit organization; and (5) Said not-for-profit organization complies with all fair housing laws and does not discriminate against any potential purchaser or tenant on the basis of race, color, creed, religion, national origin, sex or handicap. All other provisions of this chapter shall apply, including, but not limited to, obtaining all necessary permits and construction standards. (F) Any facility that is constructed by a not-for-profit organization exempt from income taxes under 26 USCA 501(C) shall be exempt from the tap-in fee provided by subsection (C) of this section so long as all of the following apply: (1) The facility is constructed for the sole purpose of supporting youth activities. (2) The facility is served by one water meter. (3) The water meter installed is three-quarter inch or smaller. (4) The facility is completely separate and detached from any other building on the property. All other provisions of this chapter shall apply, including, but not limited to, obtaining all necessary permits and construction standards. (G) The charges established in subsection (C) of this section shall not apply in the following instances during the period indicated: (1) For any improvement or real estate covered by any written contract with the City, acting by and through the board, and with a private contractor, and regardless of whether amounts charged under the contract are more or less than required under subsection (C) of this section, under the following circumstances: the contract is in full force and effect and has not been satisfied; the private contractor has not fully received all recoupment to which he is entitled under the contract; and the improvement or real estate is subject to charges imposed for direct tap-in or connection to the sewer constructed under the contract, regardless of whether or not the improvement or real estate is also subject to a charge for an indirect tap-in or connection to the City sewer system. In the event that all these circumstances are satisfied, then the charges established in the contract for the direct tap-in or connection (but not any charge for any indirect tap-in or connection) shall preempt and supersede the charges established under this section. However, if any payment to be made under such a contract would be more than enough to pay the private contractor of the contract in full, then the tap-in and connection charge shall be whichever of the following is the lesser: (a) The total amount required to be paid under the contract without consideration of the fact that the contract is being paid in full. (b) The amount required under subsection (C) of this section. However, in no event shall the amount required to be paid under subsection (C) of this section be less than that amount required to pay the private contract in full. (2) In an instance where an individual privately constructs a sanitary sewer system, the Utility Board is authorized and granted authority to permit modifications or exceptions to the foregoing schedule within its sole discretion, the modifications or exceptions to depend on particular circumstances such as, but not limited to, the distance of the development from an existing sewer, the cost for the construction of a line connecting the existing sewer to the development, the ownership of the line, and the right to recoupment from the line. (H) The charges under subsection (C) of this section shall be reduced by the amount of any charge paid to the City under any control between a private contractor and the City, acting by and through the board, for any indirect tap-in (for a lateral or an extension) to the City sewer system under the contract while the contract is in full force and effect. (I) This section shall be subject to the following additional terms, provisions, and interpretations: (1) In the event any real estate or improvements can reasonably be tapped into or connected to more than one sewer, the board shall determine to which sewer the tap-in shall be made. (2) Where a tap-in charge is to serve a new improvement which replaces an old improvement, where the old improvement has been either destroyed or removed from the real estate and the old improvement was properly connected to the City sewer system, either directly or indirectly, and the construction of the new improvement upon the real estate is commenced within 60 months from the date of destruction or removal of the old improvement on the real estate, then the following shall apply: (a) If the tap-in and connection charge for the new improvement under subsection (C) of this section would be the same or less than the tap-in and connection charge under subsection (C) of this section would have been for the old improvement if the old improvement had been made under subsection (C) of this section, then there shall be no additional tap-in charge. (b) The schedule in subsection (C) of this section shall apply to add-ons or additions, enlargements, or changed to an existing improvement reduced by all amounts which have previously been paid for the improvements under this section, or reduced by all amounts that would have been paid under subsection (C) of this section had the original tap-in been made pursuant to this section. No reduction in amount shall be allowed if no tap-in fee has been paid. In no event shall the additional tap-in and connection charge be less than the fee provided in subsection (C)(10) of this section. There shall not be an add-on charge for single-family residential houses, residential duplex homes, service stations, car washes, or a combination of a service station and car wash, mobile homes, trailers, motor homes, or other similar-type vehicle homes so long as the add-on addition, enlargement, or change does not modify the original use category listed above. If there is no additional plumbing in the addition, enlargement, or change, no additional fee shall be charged. (3) In the event the construction of the new improvement is after 60 months from the date of destruction or removal of the old improvement from the real estate, then this provision shall not apply and there shall be no credit whatsoever for the old improvement; the tap-in and connection charge shall be determined under this section as if there had never been any old improvement on the real estate. (4) The schedule in subsection (C) of this section shall apply to add-ons or additions, enlargements, or changes to an existing improvement. These modifications shall be considered separate, new, and independent structures to be tapped, either directly or indirectly, to the City sewer system, and the tap-in charge shall be computed as if the modification were a separate structure. However, there shall not be an add-on charge for single-family residential houses, residential duplex homes, service stations, car washes, or a combination of a service station and a car wash, mobile homes, trailers, motor homes, or other similar vehicular-type home, so long as the add-on addition, enlargement, or change does not modify the original use category listed above. (J) In the event any situation arises which is not contemplated or covered by the foregoing provisions and schedule, the tap-in charge shall be determined by the board.
( 1962 Code, Art. 5, Ch. 8.5, § 6 ; Ord. G-77-23 , passed 7-24-1978 ; 1982 Code § 50.58 ; 1983 Code § 5.50.58 ; Ord. G-90-12 , passed 6-12-1990 ; Ord. G-90-21 , passed 9-25-1990 ; Ord. G-92-16 , §§ 1, 2, passed 7-6-1992 ; Ord. G-92-7 , § 1, passed 5-11-1992 ; Ord. G-94-3 , passed 3-23-1994 ; Ord. F-93-2 , passed 2-24-1993 ; Ord. F-93-4 , passed 3-16-1993 ; Ord. G-2002-6 , passed 6-17-2002 ; Ord. G-2003-11 , passed 4-7-2003 ; Ord. G-2015-13 , §§ 4, 5, 6, 6-10-2015 )
Ask a question about Evansville law
Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
