For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.10.085 — Floodplain development permit and certification requirements

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 16.10.085

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/b392a78f-7670-40fe-a35f-b9b2748a32f2

§ 16.10.085: Floodplain development permit and certification requirements.

An application for a floodplain development permit shall be made to the Floodplain Administrator for all development activities located wholly within, partially within, or in contact with an identified SFHA. Such application shall be made by the owner of the property or his/her authorized agent, herein referred to as the applicant, prior to the actual commencement of such construction on a form furnished for that purpose. Such applications shall include, but not be limited to, plans drawn to scale showing the nature, location, dimensions, and elevations of the area in question, existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the location of the foregoing. Specifically, the following information is required: (A) Application Stage. (1) A description of the proposed development. (2) Location of the proposed development sufficient to accurately locate property and structure(s) in relation to existing roads and streams. (3) A legal description of the property site. (4) For the reconstruction, rehabilitation, or improvement of an existing structure, or an addition to an existing building, a detailed quote and description of the total work to be completed including but not limited to interior work, exterior work, and labor as well as a certified valuation of the existing (pre-improved or pre-damaged) structure. (5) A site development plan showing existing and proposed development locations and existing and proposed land grades. (6) A letter from a licensed professional surveyor or engineer noting that an elevation reference bench-mark has been established or confirmed for those projects requiring elevations to be met, or a published bench-mark from a plat, letter or similar document. (7) Verification that connection to either a public sewer system or to an approved on-site septic system is available and approved by the respective regulatory agency for proposed structures to be equipped with a restroom, kitchen or other facilities requiring disposal of wastewater. (8) Plans showing elevation of the top of the planned lowest floor (including basement) of all proposed structures in Zones A, AH, and AE. Elevation should be in NAVD 88. (9) Plans showing elevation (in NAVD 88) to which any nonresidential structure will be floodproofed. (10) Plans showing location and specifications for flood openings for any proposed structure with enclosed areas below the FPG. (11) Plans showing materials to be used below the FPG for any proposed structure are flood resistant. Plans for proposed activities requiring a specified FPG that involve land or watercourse alterations, or involve floodproofing of a structure, shall be certified by a professional engineer, professional surveyor, or professional architect. (12) Plans showing how any proposed structure will be anchored to resist flotation or collapse. (13) Plans showing how any electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities are designed and/or located. Elevation should be in NAVD 88. (14) Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. A hydrologic and hydraulic engineering analysis is required, and any watercourse changes submitted to IDNR for approval. Once IDNR approval is obtained, a FEMA conditional letter of map revision must be obtained prior to construction. (See EMC §§ 16.10.090 and 16.10.100 for additional information.) (15) Any additional information, as requested by the Floodplain Administrator, which may be necessary to determine the disposition of a proposed development or structure with respect to the requirements of this chapter. (16) An application and permit fee shall be charged for the processing of a floodplain development permit application. A fee schedule shall be developed by the Floodplain Administrator and/or designee for categories of proposed activities sufficient to recover the cost of processing applications. (17) A floodplain development permit shall not be issued for any proposed activity until all necessary permits have been received from those governmental agencies from which approval is required by Federal or State law. (B) Floodplain Development Permit Validity and Expiration. (1) The approval of a floodplain development plan by the Floodplain Administrator and/or designee shall be valid for a period of one year from the date such approval was granted, or until the floodplain development permit for which the plan was submitted was issued, whichever occurs first. However, prior to the issuance of the permit, if there are any material changes to an approved floodplain development plan or circumstances that cause the floodplain development plan to be inaccurate or incomplete, then a new or corrected floodplain development plan shall be submitted to the Floodplain Administrator as a precondition for obtaining a floodplain development permit. (C) Construction Stage. (1) Upon establishment of the lowest floor of an elevated structure or structure constructed on fill, it shall be the duty of the applicant to submit to the Floodplain Administrator an elevation certificate for the building under construction. The Floodplain Administrator shall review the elevation certificate. Any deficiencies detected during the review shall be corrected by the applicant before work is allowed to continue. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. The elevation certificate shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by the same. (D) Finished Construction. (1) Upon completion of construction of any structure requiring certification of elevation, an elevation certificate which depicts the “as-built” lowest floor elevation and other applicable elevation data is required to be submitted by the applicant to the Floodplain Administrator. The elevation certificate shall be prepared by or under the direct supervision of a registered land surveyor and certified by the same. (2) Upon completion of construction of an elevated structure constructed on fill, a fill report is required to be submitted to the Floodplain Administrator to verify the required standards were met, including compaction. (3) Upon completion of construction of a floodproofing measure, a floodproofing certificate is required to be submitted by the applicant to the Floodplain Administrator. The floodproofing certificate shall be prepared by or under the direct supervision of a registered professional engineer or architect and certified by same. (4) The project manager and/or clerk of the Evansville-Vanderburgh Building Commission shall not issue a certificate of completion or certificate of occupancy until the Floodplain Administrator and/or designee has received and reviewed a properly completed elevation certificate or floodproofing certificate.

( Ord. G-2026-9 , 4-28-2026 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.