§ 16.10.110 — Floodplain status standards
Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 16.10.110
Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/041194d1-9e3f-4627-8a68-13c4cb5793f9
§ 16.10.110: Floodplain status standards.
(A) Floodways (Riverine). Located within SFHAs, established in EMC § 16.10.040, are areas designated as floodways. The floodway is an extremely hazardous area due to the velocity of floodwaters, which carry debris, potential projectiles, and have erosion potential. Under the provisions of the Flood Control Act (IC 14-28-1) a permit for construction in a floodway from IDNR is required prior to the issuance of a local building permit for any excavation, deposit, construction, or obstruction activity located in the floodway. This includes land preparation activities such as filling, grading, clearing, and paving undertaken before the actual start of construction of the structure. General licenses and exemptions to the requirements of the Flood Control Act (IC 14-28-1 and 312 IAC 10) may apply to qualified additions/improvements to existing lawful residential structures, rural bridges, logjam removals, wetland restoration, utility line crossings, outfall projects, creek rock removal, and prospecting. (1) If the site is in a regulatory floodway as established in EMC § 16.10.040, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to IDNR and apply for approval for construction in a floodway, provided the activity does not qualify for a general license or exemption (IC 14-28-1 or 312 IAC 10). (2) No action shall be taken by the Floodplain Administrator until approval has been granted by IDNR for construction in the floodway, or evidence provided by an applicant that the development meets specified criteria to qualify for a general license or exemption to the requirement of the Flood Control Act. The floodplain development permit shall meet the provisions contained in this chapter. (3) The floodplain development permit cannot be less restrictive than an approval issued for construction in a floodway issued by IDNR, or the specified criteria used to qualify for a general license or exemption to the Flood Control Act for a specific site/project. However, a community’s more restrictive regulations (if any) shall take precedence. (4) In floodway areas identified on the FIRM, development shall cause no increase in flood levels during the occurrence of the base flood discharge without first obtaining a conditional letter of map revision and meeting requirements of EMC § 16.10.100(A). A conditional letter of map revision cannot be issued for development that would cause an increase in flood levels affecting a structure and such development should not be permitted. (5) In floodway areas identified by IDNR through detailed or approximate studies but not yet identified on the effective FIRM as floodway areas, the total cumulative effect of the proposed development, when combined with all other existing and anticipated development, shall not adversely affect the efficiency of, or unduly restrict the capacity of, the floodway. This adverse effect is defined as an increase in the elevation of the regulatory flood of at least fifteen-hundredths (0.15) of a foot as determined by comparing the regulatory flood elevation under the project condition to that under the natural or pre-floodway condition as proven with hydraulic analyses. (6) For all projects involving channel modifications or fill (including levees) the City shall submit the data and request that the Federal Emergency Management Agency revise the regulatory flood data per mapping standard regulations found at 44 CFR 65.12. Permitted uses shall be any use permitted by IDNR pursuant to the applicant’s submission of plan and specification for approval for construction in a floodway as above. (B) Fringe (Riverine). If the site is in the fringe (either identified on the FIRM or identified by IDNR through detailed or approximate studies and not identified on a FIRM), the Floodplain Administrator may issue the local floodplain development permit provided the provisions contained in this chapter have been met. (C) SFHAs Without Established BFE and/or Floodways/Fringes (Riverine). (1) Drainage Area Upstream of the Site Is Greater Than One Square Mile. If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined, and the drainage area upstream of the site is greater than one square mile, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to IDNR for review and comment. No action shall be taken by the Floodplain Administrator until written approval from IDNR (approval for construction in a floodway, letter of authorization, or evidence of general license qualification) or a floodplain analysis/regulatory assessment citing the one percent annual chance flood elevation and the recommended FPG has been received from IDNR. Once the Floodplain Administrator has received the proper written approval, evidence of general license qualification, or floodplain analysis/regulatory assessment approving the proposed development from IDNR, a floodplain development permit may be issued, provided the conditions of the floodplain development permit are not less restrictive than the conditions received from IDNR and the provisions contained in this section have been met. (2) Drainage Area Upstream of the Site Is Less Than One Square Mile. If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined and the drainage area upstream of the site is less than one square mile, the Floodplain Administrator shall require the applicant to provide an engineering analysis showing the limits of the floodplain and one percent annual chance flood elevation for the site. Upon receipt, the Floodplain Administrator may issue the local floodplain development permit, provided the provisions contained in this chapter have been met. (D) SFHAs Not Identified on a Map. (1) If a proposed development site is near a waterway with no SFHA identified on a map, the Floodplain Administrator shall verify the drainage area upstream of the site. If the drainage area upstream of the site is verified as being greater than one square mile, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to IDNR for review and comment. (2) No action shall be taken by the Floodplain Administrator until written approval from IDNR (approval for construction in a floodway, letter of authorization, or evidence of general license qualification) or a floodplain analysis/regulatory assessment citing the one percent annual chance flood elevation and the recommended FPG has been received from the IDNR. (3) Once the Floodplain Administrator has received the proper written approval, evidence of general license qualification, or floodplain analysis/regulatory assessment approving the proposed development from IDNR, a floodplain development permit may be issued, provided the conditions of the floodplain development permit are not less restrictive than the conditions received from IDNR and the provisions contained in this chapter have been met.
( Ord. G-2026-9 , 4-28-2026 )
Ask a question about Evansville law
Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
