§ 52.22 — SYSTEM DEVELOPMENT CHARGE
Fort Wayne, Indiana Code of Ordinances (2026 S-60: local legislation current through Ord. G-19-26, passed 7-14-26) · Fort Wayne Code of Ordinances § 52.22
Corpus is an independent public-information project, not the official City of Fort Wayne website. Stable reference: corpuslaw.us/code/709c70ff-68de-4f6b-bf46-0957c1047376
§ 52.22 SYSTEM DEVELOPMENT CHARGE.
A system development charge (“SDC”) shall be assessed for all permanent connections to the Fort Wayne water system in accordance with the Fort Wayne Water Utility’s connection policies after filing of the tariff with the Indiana Utility Regulatory Commission, as follows: System Develop ment Charge | Unit of Measur e | 2025 | Phase I System Develop ment Charge | Unit of Measur e | 2025 | Phase I 5/8 x 3/4" | Per meter | $580.0 0 | $650.00 3/4" | Per meter | $870.0 0 | $975.00 1" | Per meter | $1,450 .00 | $1,625. 00 1 1/2" | Per meter | $2,900 .00 | $3,250. 00 2" | Per meter | $4,640 .00 | $5,200. 00 3" | Per meter | $8,700 .00 | $9,750. 00 4" | Per meter | $14,50 0.00 | $16,250 .00 6" | Per meter | $29,00 0.00 | $32,500 .00 8" | Per meter | $46,40 0.00 | $52,000 .00 10" | Per meter | $66,70 0.00 | $74,750 .00 12" | Per meter | Not active | $139,75 0.00 Size of Meter | SDC Size of Meter | SDC 5/8" | $580 3/4" | $870 1" | $1,450 1 ½” | $2,900 2" | $4,640 3" | $8,700 4" | $14,500 6" | $29,000 8" | $46,400 10" | $66,700 (Ord. G-14-18, passed 6-26-18; Am. Ord. G-11-19, passed 5-28-19; Am. Ord. G-13-25, passed 8-12-25)
Ask a question about Fort Wayne law
Corpus searches the Fort Wayne sections it holds and shows the ones that match, with their citations. Free, no sign-in.