§ 53.21 APPLICABILITY AND EXEMPTIONS.

(A) It shall be required that a Stormwater Pollution Prevention Plan (SWP3) that addresses post-construction stormwater quality control measures be submitted and approved by the DSM for any project located within the Fort Wayne Stormwater Management District that includes clearing, grading, excavation, filling and other land disturbing activities resulting in the following: (1) The disturbance of one (1) acre or more of total land area as determined per § 53.13. (2) Disturbances of less than one (1) acre of land that are part of a larger common plan of development or sale if the larger common plan will ultimately disturb one or more acres of land. (B) The SWP3 must be approved by the DSM prior to the beginning of any land disturbing activities on the site for which the plan is submitted. The SWP3 shall include stormwater quality features that shall become permanent features of the site plan and shall remain in place following completion of construction activities. The SWP3 shall comply with the design criteria and technical standards and specifications approved by the BSM. (C) Unless otherwise determined by the DSM, all residential properties that are required to have a SWP3 for construction site control as described in § 53.11(C) shall have an approved SWP3 that addresses post-construction stormwater quality control measures. If the condition described in division (A)(1) of this section applies, the residential property shall have its own SWP3 addressing post- construction stormwater quality control measures. If the condition described in division (A)(2) of this section applies, the residential property does not need its own SWP3 but shall be covered by the SWP3 for the larger common plan of development. (D) This Chapter does not apply to the following types of activities: (1) Agricultural land disturbance activities. (2) Forest harvesting activities. (E) This section does not apply to the following activities, provided other applicable permits contain provisions requiring immediate implementation of soil erosion control measures: (1) Landfills that have been issued a certification of closure under 329 IAC 10. (2) Coal mining activities permitted under IC 14-34. (3) Municipal solid waste landfills that are accepting waste pursuant to a permit issued by IDEM under 329 IAC 10 that contains equivalent stormwater requirements, including the expansion of landfill boundaries and construction of new cells either within or outside the original solid waste permit boundary. (4) Roadway projects initiated by the Indiana Department of Transportation. (Ord. G-11-07, passed 4-10-07; Am. Ord. G-17-24, passed 7-9-24; Am. Ord. G-11-25, passed 7-22-25)

Ask a question about Fort Wayne law

Corpus searches the Fort Wayne sections it holds and shows the ones that match, with their citations. Free, no sign-in.