§ 06.07 — Stormwater management
Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code, App. B, art. 06, § 06.07
Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/87175d64-e4f2-425f-822c-0fbad0ee5557
Sec. 06.07. - Stormwater management.
All subdivisions shall make provision for the installation and maintenance of an adequate storm water drainage system for the management of all storm and surface water drainage and the control of flood runoff to provide for the proper drainage of the subdivision. All such facilities are to control peak flow rates and volume of stormwater discharge associated with specified design storms and shall be designed, constructed and approved by the Michigan City Sanitary District under Chapter 46, Article IX of the Michigan City, Indiana Code of Ordinances. (a) A drainage plan shall be submitted, along with all computations and backup data describing the storm drainage system. The following items shall be provided: (1) Name, address and contact information of property owner and subdivider (if different). (2) A description of the proposed development activity. (3) Location of the proposed development activity sufficient to accurately locate property and structure in relation to existing roads, streams, wetlands and other waterbodies; (4) A legal description of the property. (5) A site development plan showing existing site conditions, existing and proposed building and structure locations, existing and proposed land grades, proposed impervious surface, structural stormwater management and sediment control facilities, and potential or proposed impact to natural resources. (6) Photographs of the proposed project site showing the existing condition. (7) Soils information, including depth to ground water and permeability information, if available. If the proposed control measures are dependent upon the hydrologic properties of the soils, then a detailed soils report shall be submitted. (8) Elevation of the 100 year flood, and floodplain and floodway boundaries (if applicable) at the project site. (9) Elevation of the top of the lowest floor (including basement) of all proposed buildings. Elevation should be in NAVD 88. (10) Elevation (in NAVD 88) to which any non-residential structure will be floodproofed. (11) Narrative description of the project including extent to which the site will be altered or impacted as a result of proposed development and noting all grading, filling and vegetation removal proposed by the development plan. (12) Sufficient engineering analysis in the form of a technical report showing that the proposed stormwater management measures are capable of controlling runoff from the site in compliance with the requirements of the applicable jurisdiction. The analysis and calculations shall be prepared and sealed by a professional engineer or surveyor registered in the State of Indiana. Hydrologic and hydraulic design calculations for the pre-development and post-development conditions for the design storms. Such calculations shall include: a. description of the design storm frequency, intensity and duration, b. time of concentration, c. soil curve numbers or runoff coefficients, d. peak runoff rates and total runoff volumes for each watershed area, e. infiltration rates, where applicable, f. BMP capacities, g. flow velocities, h. data on the increase in rate and volume of runoff for the design storms referenced in the design manuals or other ordinances, and i. documentation of sources for all computation methods and field test results. (13) Description of construction sequencing and timetable for proposed activities, including a description of future phases of the project. (14) Copy of prepared Rule 5 NOI permit application forms from IDEM. (15) Draft Copy of Operation & Maintenance Plan agreement. (16) Copy of Proposed Maintenance easements. (b) A stormwater management approval shall be obtained and Storm Water Pollution Prevention Plan (SWP3) plan submitted in compliance with Section 20.13 of the Joint Ordinance.
(Ord. No. 4770, § 2(Exh. B, B.30, 35, 40), 8-4-2025)
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
