Sec. 07.03. - Inspection.
(a) Preconstruction. Prior to beginning any work within the subdivision, the person or persons designated in the subdivision improvement agreement to be responsible for the installation of improvements shall meet on the site with representatives of the city or county as specified in the agreement. The subdivider, prior to commencing any work within the subdivision, shall make arrangements with the enforcement official to provide for inspection in accordance with subsection (c) below. (b) Construction. The county or city representatives designated in the subdivision improvement agreement shall inspect and require that the installation of all improvements take place in accordance with plans approved by the plan commission. The county or city representatives shall have authority, as specified in the subdivision improvement agreement, over the schedule of construction, materials used, methods of construction, and workmanship to ensure compliance with the approved plans and terms of the agreement. (c) Inspection. Inspection of the construction of all roads and utilities shall be made by at least one of the following people: the county highway engineer or city engineer, enforcement official, county surveyor, county building commissioner or utility inspector. The contractor shall notify the county highway engineer or city engineer 24 hours prior to each phase of work. Inspection shall be made of: (1) Installation of water and sanitary sewer; (2) Subbase preparation; (3) Base aggregate placement; (4) Each asphalt course; (5) Curb placement; and (6) Sewer pipe placement. (d) Subgrade Inspection. Prior to placing the base aggregate, the subgrade of the pavement must be proof rolled with a ten-ton triaxial dump truck in the presence of the city engineer or county highway engineer. Failing the proof roll will require additional undercutting, additional aggregate or additional asphalt, as recommended by the subdivider's engineer and approved by the city engineer or county highway engineer. (e) Consulting Engineer. The local jurisdiction may contract with an independent third party consulting engineer to do inspections. The subdivider shall be responsible for paying the cost the cost associated with the consulting engineer.
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.