§ 110-63 — Establishment of dock lines
Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code § 110-63
Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/2377c394-e1f1-4380-90ab-de187bdfa7f8
Sec. 110-63. - Establishment of dock lines.
The determination and establishment of dock lines along waters within the jurisdiction of the port authority shall be in accordance with the following procedure: (1) Survey; preliminary dock lines. Within one year from May 21, 1968, the port authority shall cause the waters of Trail Creek under its jurisdiction to be surveyed, and designate, on a chart reflecting the survey, lines to be known as preliminary dock lines. The dock lines shall coincide as nearly as practicable with the shoreline, the shoreline being the average water line for the past 50 years, as it shall be determined. If, however, docks or bulkheads are located parallel or approximately parallel to the water line and were in existence on January 1, 1925, the dock lines to be established under this section shall coincide with the existing docks or bulkheads. (2) Hearing. After the survey is prepared, the port authority shall conduct a public hearing on the location of the dock lines and shall give notice of the public hearing by publication, once a week for two consecutive weeks, in a newspaper of general circulation in the city. The first publication shall be at least ten days prior to the date of the hearing. (3) Determination of permanent dock lines. After the public hearing, the port authority shall then determine the location of dock lines along the waters under the jurisdiction of the port authority. The dock lines so determined shall become the permanent dock lines of waters within the jurisdiction of the port authority. The port authority shall adopt the survey and plat showing the official permanent dock lines, and it shall be kept and maintained in the office of the city engineer. (4) Changes to dock lines. After establishment of the permanent dock lines, any changes of the permanent dock lines shall be within the discretion of the port authority, and shall be changed only after a written petition has been filed with the port authority, containing any information as may be prescribed from time to time by the port authority. After receipt of the written petition to change the permanent dock lines, the port authority shall conduct a public hearing for the purpose of receiving and considering remonstrances against the petition, if any. It shall give notice of the public hearing by publication in at least one newspaper of general circulation within the city, once a week for two consecutive weeks, the first publication being at least ten days prior to the date of the hearing. After the public hearing, the port authority shall then determine to grant or deny the petition. If the permanent dock lines are changed or altered, the port authority shall instruct the city engineer to reflect the change or alteration on the survey and plat showing the official permanent dock lines, as kept and maintained in the office of the city engineer. The cost of the proceedings shall be paid by the petitioner.
(Ord. No. 2030, 5-21-1968; Code 1980, § 94.12)
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
