§ 46-323 — Certification of as-built plans
Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code § 46-323
Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/2e519231-41c4-4d6c-8a0c-c018f91c9296
Sec. 46-323. - Certification of as-built plans.
This division shall apply to all projects whether the stormwater management system or portions thereof will be dedicated to the department or retained privately. After completion of construction of the project and before the release of required performance assurances referenced in section 46-321, a professionally prepared and certified 'as-built' set of plans (record drawings) shall be submitted to the department for review. These as-built plans/record drawings must be prepared and certified by the engineer of record, i.e., the company/engineer who originally prepared the construction plans. Additionally, a digital copy of the 'as-built' plans (record drawings) as well as finalized digital versions of all analyses, models, manuals, and reports that are consistent with the as-built conditions is required in a format acceptable to the department. These plans shall include all pertinent data relevant to the completed storm drainage system and stormwater management facilities, and shall include: (1) Pipe size and pipe material. (2) Invert elevations. (3) Top rim elevations. (4) Elevation of the emergency overflow (spillway) for ponds. (5) Grades along the emergency flood routing path(s). (6) Pipe structure lengths. (7) As-built values of all proposed elevations, lengths, sizes, etc. above or next to any superseded values shown as strikethrough. (8) BMP types, dimensions, and boundaries/easements. (9) "As-planted" plans for BMP's, as applicable. (10) Data and calculations showing detention basin storage volume. (11) Data and calculations showing BMP treatment capacity. (12) Certified statement on plans stating the completed storm drainage system and stormwater management facilities substantially comply with construction plans and the stormwater management permit as approved by the department. (See certificate in the Stormwater Technical Standards Manual.)
(Ord. No. 4770, § 4(Exh. A), 8-4-2025)
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
