Sec. 98-271. - Compliance schedule reports.
(a) Any noncategorical industry or categorical industry that must meet a local limit, or in the case of a category industry, a categorical pretreatment standard, which is not in compliance with the limitations contained in this article, must develop a compliance schedule during which time the industry must meet these standards. The schedule should contain increments of progress (hiring engineers, starting construction and the like) which correspond to specific dates for their completion. These represent major events leading to the operation of pretreatment equipment to meet the pretreatment standards of the board. (b) All industrial users subject to these conditions must submit a progress report to the board no later than 14 days following each date in the compliance schedule. (1) This report must include whether the user complied with the increment of progress to be met on that date, the reason for delay if the date was not met, and the steps being taken to return to compliance. (2) In no event can more than nine months elapse between progress reports. (40 CFR 403.12(c))
(Code 1980, § 50.06(A); Ord. No. 2778, 6-19-1984; Ord. No. 3648, § I, 12-17-1996)
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.