§ 98-319 — Industrial discharge permit
Code of the City of Michigan City, Indiana (Codified through Ordinance No. 4808, adopted August 5, 2026. (Supp. No. 22, Update 1)) · Michigan City Code § 98-319
Corpus is an independent public-information project, not the official City of Michigan City website. Stable reference: corpuslaw.us/code/6da8e3e6-2dd5-4acf-be43-14006a0944c2
Sec. 98-319. - Industrial discharge permit.
(a) Required. All industrial users proposing to connect to or discharge sewage, industrial wastes and other wastes to the POTW must obtain a wastewater permit before connecting or discharging to the POTW. All existing industrial dischargers connected to or discharging to the POTW must obtain a wastewater permit within 60 days after the effective date of the ordinance from which this article is derived. (b) Major contributors. All industrial users, on demand of the board or its duly authorized representatives, shall provide the board with sufficient information to determine if they are classified as major contributors. Any industrial user determined to be a major contributor shall be required to apply to the board for and obtain a permit which describes in detail the wastewater constituents and characteristics allowed. The permit sets forth the applicable surveillance schedule and the monitoring requirements the user shall be subject to in order to discharge into the sewerage system. (c) Duration; renewal. A major contributor/industrial user permit shall be valid for four years unless processing changes are made that, in the opinion of the board or its duly authorized representative, alter the wastewater constituents and characteristics significantly. In the event of a change, a new application shall be filed accordingly. A permit may be renewed without reapplication at the end of four years at the discretion of the board. (d) Compliance with article. Nothing in a major contributor/industrial user permit shall constitute an exception to the prohibitions and limitations on wastewater admissibility as set forth in this article. Major contributors are subject to all applicable fees, rates and charges set forth in this article. (e) Modifications. The board reserves the right to amend any wastewater permit in order to ensure compliance with applicable laws and regulations. (1) Within nine months of the promulgation of a national categorical pretreatment standard, the wastewater permit of each discharger affected by that standard will be revised to require compliance with the standard within the timeframe prescribed. (2) Where a discharger subject to a national categorical pretreatment standard has not previously submitted an application for a wastewater permit, he must apply for a wastewater permit from the board within 180 days after the promulgation of the applicable national categorical pretreatment standard. (3) In addition, any discharger with an existing wastewater permit must submit to the board, within 180 days after the promulgation of an applicable national categorical pretreatment standard, the information required by 40 CFR 403.12(b). (4) The discharger shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of the change. Any changes or new conditions in the permit must include a reasonable time schedule for compliance. (f) Permit conditions. Wastewater permits shall include the following: (1) Fees and charges to be paid upon initial permit issuance. (2) Limits on the average and maximum wastewater constituents and characteristics regulated by this article. (3) Limits on the average and maximum rate and time of discharge. (4) Requirements for installation and maintenance of inspection and sampling facilities. (5) Special conditions the board may require under particular circumstances of a given discharge, including sampling locations, frequency of sampling, number, types and standards for tests, and reporting schedules. (6) Compliance schedules. (7) Requirements for submission of special technical reports or discharge reports where they differ from those outlined in this article. (g) Transfer. Industrial discharge permits shall be issued to specific industrial dischargers for a specific operation, and are not assignable to another discharger at the same location, unless prior written approval is obtained from the board or its duly authorized representatives. (h) Application. (1) Major contributors/industrial users shall make applications for the proposed discharge on a form provided by the city, accompanied by the appropriate fee. The permit application shall be supplemented by any plans, specifications, studies or other information considered necessary by the board or the manager. (2) Existing industrial dischargers must apply for a wastewater permit within 45 days after the effective date of the ordinance from which this article is derived. All new dischargers shall apply to the board at least 90 days prior to connecting to the public sewer.
(Ord. No. 2205, 12-17-1974; Code 1980, § 50.05(I); Ord. No. 2778, 6-19-1984; Ord. No. 2989, 9-15-1987; Ord. No. 3648, § I, 12-17-1996)
Ask a question about Michigan City law
Corpus searches the Michigan City sections it holds and shows the ones that match, with their citations. Free, no sign-in.