For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 62-280 — Wastewater discharge permits

Code of Ordinances of the City of Mishawaka, Indiana (Codified through Ordinance No. 5932, enacted May 5, 2025. (Supp. No. 18)) · Mishawaka Municipal Code § 62-280

Corpus is an independent public-information project, not the official City of Mishawaka website. Stable reference: corpuslaw.us/code/f588b332-50d6-4bb4-b12b-409378b18a6f

Sec. 62-280. - Wastewater discharge permits.

(a) General permits. All dischargers deemed by the control authority to be significant industrial users (SIU) or which discharge any waste characteristic limited by section 62-147 shall obtain a wastewater discharge permit before connecting to or discharging to the POTW. The superintendent may permit wastewater flows resulting from groundwater remediation discharges into the POTW authority wastewater collection and treatment system with approval by the utility board. Groundwater remediation discharges shall be subject to all applicable requirements of this article. Groundwater remediation discharges shall also be subject to all applicable sewer rates and charges found in division 6 of this article. (b) Permit application. Industrial wastewater dischargers shall complete and file with the authority, a permit application in the form prescribed by the authority. Existing industrial/commercial dischargers shall apply for a wastewater discharge permit within 30 days after being requested to do so by the authority. Proposed new dischargers shall apply at least 90 days prior to connecting to the POTW. The authority will evaluate the complete application and data furnished by the discharger and may require additional information. Within 30 days after full evaluation and acceptance of the data furnished, the authority may issue a wastewater discharge permit subject to the terms and conditions provided herein. No discharge permit shall be issued unless and until the following conditions have been met: (1) Disclosure of name, address, and location of the discharger. (2) Disclosure of standard industrial classification (SIC) number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended, and the applicable national categorical pretreatment standard. (3) Disclosure of wastewater constituents and characteristics, including, but not limited to, priority pollutants, and to those mentioned in this article as determined by categorical pretreatment standards as they apply to the discharger and pollutants requested by the authority. Sampling and analysis shall be performed in accordance with procedures established by the United States Environmental Protection Agency and contained in 40 CFR 136, as amended. (4) Disclosure of time, duration and volume of each specific discharge at each specific discharge point. (5) Disclosure of average daily and instantaneous peak wastewater flow rates, in gallons per day, including daily, monthly and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the authority due to cost or nonfeasibility. (6) Disclosure of site plans, mechanical and/or plumbing plans to show all connections of pollutant-generating processes, inspection manholes, sampling chambers and appurtenances by size, location and elevation, including measuring and sampling equipment. (7) Description of activities, facilities and plant processes on the premises including all materials stored above or below ground which are or may be discharged to the sewers or works of the authority. (8) Disclosure of the nature and concentration of any pollutants or materials prohibited by this article in the discharge, together with a statement regarding whether or not compliance is being achieved with this article on a consistent basis and if not, whether additional operation and maintenance activities and/or additional pretreatment is required for the discharger to comply with this article. (9) Where additional pretreatment and/or operation and maintenance activities will be required to comply with this article, the discharger shall provide a declaration of the shortest schedule by which the discharger will provide such additional pretreatment and/or implementation of additional operational and maintenance activities. a. The schedule shall contain milestone dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the discharger to comply with the requirements of this article including, but not limited to, dates relating to hiring an engineer, hiring other appropriate personnel, completing preliminary plans, completing final plans, executing contracts for major components, commencing construction, completing construction, and all other acts necessary to achieve compliance with this article. No increment referred to in this subsection shall exceed nine months. b. Not later than 14 days following each milestone date in the schedule and the final date for compliance, the discharger shall submit a progress report to the authority, including no less than a statement as to whether or not it complied with the increment of progress represented by that milestone date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the discharger to return the construction to the approved schedule. In no event shall more than nine months elapse between such progress reports to the authority. (10) The discharger will also provide a certified operator to run the pretreatment system. The operator must hold wastewater treatment plant operation certification, issued by the state department of environmental management, that is required for that pretreatment system. (11) Disclosure of each product produced by type, amount, process and rate of production. (12) Disclosure of the type and amount of raw materials utilized (average and maximum per day). (13) All permit applications for new or modified permits shall be signed by a principal executive officer of the discharger and certified by a qualified professional acceptable to the superintendent. All renewal applications for existing permits shall be signed by a principal executive officer of the discharger. All permit applications shall contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (14) Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system. (15) List of any environmental control permits held by or for the facility. (16) Any other information as may be deemed by the city to be necessary to evaluate the permit application.

(Ord. No. 5265, § 2, 8-2-2010)

Ask a question about Mishawaka law

Corpus searches the Mishawaka sections it holds and shows the ones that match, with their citations. Free, no sign-in.