§ 163.03 — Design criteria for stormwater detention or retention facilities

Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 163.03

Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/47b0b3e1-af4f-4c52-bfbc-f7ab5b61e36c

Sec. 163.03. - Design criteria for stormwater detention or retention facilities.

Detention/retention facilities shall be designed in accordance with the following guidelines to limit the peak discharge from a development. (1) For development with a drainage area (tributary to a combined sewer) equal to or greater than ten acres, peak discharge from the detention/retention facility shall be limited to the five year, predeveloped frequency storm peak discharge, with a duration equal to or slightly greater than the time of concentration for the drainage area or the 24 hour duration storm, whichever provides the lesser peak discharge. (2) For developments with a drainage area (tributary to a combined sewer system) less than ten acres, peak discharge from the detention/retention facility shall be limited to the ten year period redeveloped frequency storm peak discharge with a duration equal to or slightly greater than the time of concentration for the drainage area of the 24 hour duration storm whichever provides the lesser peak discharge. (3) The five year or ten year peak discharge shall be based on land use conditions prior to development, using corresponding runoff coefficients, time of concentration and other basin parameters. (4) Inflow (runoff) to all stormwater detention or retention facilities shall be determined using a 100 year 24 hour storm to develop an inflow hydrograph. (5) The 100 year 24 hour peak discharge and inflow hydrograph shall be based on land use conditions representing fully developed conditions, using corresponding runoff coefficients, time of concentration and other basin parameters. (6) A routing procedure shall be used to demonstrate that the stormwater detention or retention facility will reduce the 100 year peak discharge equal to or less than the five year or ten year peak discharge using the predeveloped conditions. (7) The results of the routing procedure shall demonstrate that adequate storage volume has been provided. The detention facility shall not be overtopped from the 100 year 24 hour storm event and shall have a minimum freeboard of two feet between the maximum routed pool elevation and the top of the facility embankment. (8) An emergency spillway shall be provided to discharge flow resulting from pool elevations greater than the 100 year 24 hour pool elevation. The spillway shall have a minimum size adequate to pass the routed 100 year 24 hour storm (assuming the primary spillway is not functional) without overtopping the detention facility embankment. The elevation of the emergency spillway shall not be placed lower than the routed 100 year 24 hour pool elevation. (9) Erosion protection shall be provided for the primary outlet and emergency spillway so that the detention facility embankment will be protected. Location of the emergency spillway shall be in undisturbed material. (10) The minimum allowable size of the primary outlet conduit from the detention or retention facility shall be 12 inches, unless otherwise approved by the Muncie sanitary district engineer. If further restriction of the outlet conduit is required, the restriction shall be made at the head end for the outlet conduit. (11) In the event the discharge velocity from the primary outlet or emergency spillway is greater than six feet per second or is excessive in the opinion of the sanitary district engineer, energy dissipation may be required. (12) Detention facilities which are designed to have dry bottoms, must be designed to have underdrains, to drain the bottom of the detention facility so the facility can be maintained. The bottom of the facility shall be designed to have longitudinal and transverse grade to the outlet so that the facility will empty leaving no ponded water. (13) The methodology used to develop peak discharge hydrography and flood routing calculation shall be in accordance with acceptable engineering practice. Calculations based on the soil conservation service procedures, corps of engineers procedures or the bureau of reclamation procedures are considered acceptable. (14) Peak discharge calculations shall be submitted for the five year or ten year predevelopment and 100 year post-development condition. The calculations shall show the drainage area, runoff calculations, time of concentrations and other basin parameters used to develop the appropriate peak discharge. (15) Calculations shall be submitted which show stage-discharge relations (rating curves) for the primary outlet and emergency spillway, the stage-storage relationship for the retention facility, the inflow hydrography for the 100 year 24 hour storm and the routing 100 year 24 hour discharge hydrography.

(Ord. No. 60-98, § 1, 11-9-98)