§ 53.32 — Content of applications
Code of Ordinances of the City of Muncie, Indiana (Codified through Ordinance No. 5-26 enacted January 5, 2026. (Supp. No. 34)) · Muncie Municipal Code § 53.32
Corpus is an independent public-information project, not the official City of Muncie website. Stable reference: corpuslaw.us/code/427c2025-befb-4dc6-b974-15430d6a9d07
Sec. 53.32. - Content of applications.
In order to be considered for an individual wastewater discharge permit or general permit, all IUs required to have an individual wastewater discharge permit or general permit must submit the information required by section 53.43(B) of this chapter. Users that are eligible may request a general permit under section 53.32. The director shall approve a form to be used as a permit application. In addition, the following information may be requested: (A) Identifying information to including the name and address of the facility, the name of the operator and owner, and contact information. (B) Description of activities, facilities, and plant production processes on the premises, Standard industrial classifications of operation(s) carried out by such user. (C) Number and type of employees, hours of operation, and proposed or actual hours of operation of the industry. (D) Each product produced by type, amount, process and processes, and rate of production. (E) A list of types and amounts of all raw materials, chemicals used or stored, and wastes generated or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW. (F) Type and amount of raw materials processed (average and maximum per day). (G) Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams arid other streams. (H) A brief description of the User's facility shall include a schematic process diagram, which indicates points of discharge site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge to the POTW from the regulated processes. (I) Time and duration of the discharge. (J) The amount, storage of, and disposal of any hazardous waste on site, or generated by the industry. (K) Any request to be covered by a general permit based on section 53.30. (L) Any request for a monitoring waiver (or renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on section 53.46(D). (M) Samples shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 53.52 (analytical requirements). (N) Sampling must be preformed in accordance with procedures set out in section 53.53 (sample collection). (O) Any other information as may be deemed necessary by the director to evaluate the wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the IU for revision. (P) Any other information as may be deemed necessary by the director to evaluate the wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the IU for revision. (Q) At the discretion of the director, general permits may be used to control groups of SIU discharges to the POTW if any of the following conditions are met. All facilities to be grouped by a general permit must: (1) Involve the same or substantially similar types of operations; (2) Discharge the same type of wastes; (3) Require the same effluent limitations; (4) Require the same or similar monitoring; or (5) In the opinion of the director, are more appropriately controlled under a general permit than under an individual wastewater discharge permits. (R) To be covered by the general permit, the SIU must file a written request for coverage that identifies its contact information, production processes, types of wastes generated, the location for monitoring all wastes covered by the general permit, any requests in accordance with section 53.46(E) for a monitoring waiver for a pollutant neither present nor expected to be present in the discharge, and any other information the POTW deems appropriated. A monitoring waiver for a pollutant neither present nor expected to be present in the discharge is not effective in the general permit until after the director has provided written notice to the SIU that such a waiver request has been granted in accordance with section 53.46(E). (S) The bureau of water quality will retain a copy of the general permit, documentation to support the bureau's determination that a specific SIU meets the criteria in section 53.30(A)(1) through (5) and applicable state regulations, and a copy of the IU's written request for coverage for no less than three years after expiration of the general permit. (T) The director may not control an SIU through a general permit where the facility is subject to production-based categorical pretreatment standards or categorical pretreatment standards expressed as mass pollutant discharge per day or for IUs whose limits are based on the combined wastestream formula in accordance with 40 CFR 403.6(e) or net/gross calculations in accordance with 40 CFR 403.15.
(Ord. No. 1-11, § 1(Exh. A), 2-7-11)
Ask a question about Muncie law
Corpus searches the Muncie sections it holds and shows the ones that match, with their citations. Free, no sign-in.
