§ 17-10 — Pretreatment of industrial wastewater and permits for wastewater discharge, Board of Works powers
Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-10
Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/af4e65cd-47df-48e7-8146-315d6cb97d33
Sec. 17-10. - Pretreatment of industrial wastewater and permits for wastewater discharge, Board of Works powers.
(a) Pretreatment of wastewater - facilities and additional pretreatment measures: (1) Users shall provide wastewater treatment as necessary to comply with this Division and shall achieve compliance with all categorical Pretreatment Standards, Local Limits, and the prohibitions set out in Subsection 17-8(c) of this Division within the time limitations specified by EPA, the State, or the Director, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the User's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the Board or its designee for review, and no construction of such facilities shall be commenced until the User is notified in writing that the plans are acceptable. The review of such plans and operating procedures shall in no way relieve the User from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the City under the provisions of this Division. All facilities necessary for compliance shall be subject to periodic inspection by the City to determine that such facilities are being operated in conformity with applicable Federal, State and local law. The owner shall maintain operating records of the influent and effluent to show the performance of the treatment facilities and for comparison against City monitoring records. (2) Whenever deemed necessary, the Director may require Users to designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the POTW and determine the User's compliance with the requirements of this Division. (3) The Director may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. An individual wastewater discharge permit may be issued solely for flow equalization. (4) The Board or its designee may require Users, other than residential users, to supply pertinent information on wastewater flow characteristics. Such measurements, tests and analyses shall be at the User's expense. If made by the City, an appropriate charge may be assessed to the User at the City's option. (5) Grease, oil, and sand interceptors shall be provided by the User as necessary for the proper handling of wastewater containing excessive amounts of grease and oil, or sand. All interception units shall be of a type and capacity acceptable to the Board of Public Works or its designee, and shall be so located to be easily accessible for cleaning and inspection. Interceptors or traps shall be constructed of impervious materials capable of withstanding abrupt and extreme changes in temperature and shall be of substantial construction, be gas tight and equipped with easily removable covers. Specifications for grease, oil, and sand interceptors shall be in accordance with provisions of the Indiana Plumbing Code, as amended. Such interceptors shall be inspected, cleaned, and repaired by the User at their expense. (6) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (b) Accidental discharges/slug Discharge Control Plans: (1) All Significant Industrial Users (SIU's) shall submit an accidental discharge/slug discharge control plan to the Director every two (2) years or when substantial changes occur to the components of the plan. Each plan is subject to approval by the Director, and shall thereafter be implemented by the User. The Director may require any User to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control Slug Discharges. Alternatively, the Director may develop such a plan for any User. An accidental discharge/slug discharge control plan shall address, at a minimum, the following: a. Description of discharge practices, including non-routine batch discharges; b. Description of stored chemicals; c. Procedures for immediately notifying the Director of any accidental or Slug Discharge, as required hereafter; d. Procedures to prevent adverse impact from any accidental or Slug Discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (2) Dischargers shall notify the Director immediately upon the occurrence of a "slug" or accidental discharge of substances prohibited by this Division. The notification shall include location of discharge, date and time of occurrence, type of waste, concentration and volume, and corrective actions. Immediate notification may be verbal, followed by a written verification within five (5) days of the incident. (3) Dischargers shall notify the Director immediately if any changes occur at the facility that affect the potential for a slug or accidental discharge. Additionally, dischargers with an approved slug or accidental discharge plan shall submit a revised plan if any changes occur at the facility that affect the potential for a slug or accidental discharge. (c) Hauled Wastewater: (1) Septic tank waste may be introduced into the POTW only at locations designated by the Director, and at such times as are established by the Director. Such waste shall not violate Section 17-8 of this Division or any other requirements established by the City. The Director may require septic tank waste haulers to obtain individual wastewater discharge permits. (2) The Director may require haulers of industrial waste to obtain individual wastewater discharge permits. The Director also may require generators of hauled industrial waste to obtain individual wastewater discharge permits. The Director also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this Division. (3) Industrial waste haulers may discharge loads only at locations designated by the Director. No load may be discharged without prior consent of the Director. The Director may collect samples of each hauled load to ensure compliance with applicable Standards. The Director may require the industrial waste hauler to provide a waste analysis of any load prior to discharge. (4) Industrial waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents and whether any wastes are RCRA hazardous wastes. (d) Individual Wastewater Discharge Permit Requirement: (1) It shall be unlawful to discharge sewage, nondomestic wastes, or other wastes to any sewer outlet within the jurisdiction of the Board of Public Works without having been issued a wastewater discharge permit if the discharger: a. Is subject to National Categorical Pretreatment Standards as promulgated by the EPA , unless the discharger is found to be a non-significant Categorical Industrial User (CIU); b. Discharges nondomestic wastewater in the amount equal to or exceeding twenty-five thousand (25,000) gallons per day; c. Contributes a nondomestic wastestream exceeding five (5) percent of the dry weather hydraulic or organic capacity of the wastewater treatment plant; or d. Has a reasonable potential to adversely affect the treatment plant processes by inhibition, pass-through of pollutants, sludge contamination, or endangerment of treatment plant personnel. (2) The Director may require other Users to obtain individual wastewater discharge permits as necessary to carry out the purposes of this Division. (3) Any violation of the terms and conditions of an individual wastewater discharge permit shall be deemed a violation of this Division and subjects the wastewater discharge permittee to the sanctions set out in Sections 17-11 through 17-13 of this Division. Obtaining an individual wastewater discharge permit does not relieve a permittee of its obligation to comply with all Federal, State, and Local Pretreatment Standards and Requirements. (e) Individual Wastewater Discharge Permit: New Connections: Any User required to obtain an individual wastewater discharge permit who proposes to begin or recommence discharging into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this individual wastewater discharge permit, in accordance with Subsection (g) below of this Division must be filed at least ninety (90) days prior to the date upon which any discharge will begin or recommence. (f) Individual Wastewater Discharge Permit Application Contents: (1) All Users required to obtain an individual wastewater discharge permit shall submit a permit application. Applications for wastewater discharge permits may be procured from the Director. The Director may require Users to submit all or some of the following information as part of a permit application. a. Identifying Information: (i) The name and address of the facility, including the name of the operator and owner. (ii) Contact information, description of activities, facilities, and plant production processes on the premises. b. Environmental Permits. A list of any environmental control permits held by or for the facility. c. Description of Operations. (i) A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such User. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; (ii) Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; (iii) Number and type of employees, hours of operation, and proposed or actual hours of operation; (iv) Type and amount of raw materials processed (average and maximum per day); (v) Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. d. Time and duration of discharges. e. The location for monitoring all wastes covered by the permit. f. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in Subsection 17-10(a) (40 CFR 403.6(e)). g. Measurement of Pollutants. (i) The categorical Pretreatment Standards applicable to each regulated process and new categorically regulated processes for Existing Sources. (ii) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the Standard or by the Director, of regulated pollutants in the discharge from each regulated process. (iii) Instantaneous, Daily Maximum, and long-term average concentrations, or mass, where required, shall be reported. (iv) The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Subsection (p)(1) "Analytical Requirements" of this Section 17-10. Where the Standard requires compliance with a BMP or pollution prevention alternative, the User shall submit documentation as required by the Director or the applicable Standards to determine compliance with the Standard. (v) Sampling must be performed in accordance with procedures set out in Subsection (p)(2) "Sample Collection" of this Section 17-10. (vi) Any other information as may be deemed necessary by the Director to evaluate the permit application. (2) Incomplete or inaccurate applications will not be processed and will be returned to the User for revision. (g) Individual Wastewater Permit Fees: The following wastewater discharge permit fees are required to be submitted: a. Each Significant Industrial User (SIU) wastewater discharge permit will be issued for a fee of one thousand dollars ($1,000.00). b. All other User wastewater discharge permits shall be issued for a fee of five hundred dollars ($500.00). (h) Application Signatories and Certifications: (1) All wastewater discharge permit applications, User reports and certification statements shall be signed by an Authorized Representative of the User and contain the certification statement in Subsection (p)(5)(a) of this section 17-10. (2) If the designation of an Authorized Representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this Section must be submitted to the Director prior to or together with any reports to be signed by an Authorized Representative. (i) Individual Wastewater Discharge Permit Decisions: (1) The Director will evaluate the data furnished by the User and may require additional information. Within sixty (60) days of receipt of a complete permit application, the Director will make a recommendation to the Board. The Board shall review the recommendation and may approve or deny application for an individual wastewater discharge permit. (2) If the Board of Public Works rejects the application for noncompliance, the Board shall establish a compliance schedule and require compliance schedule reports and compliance date reports on forms supplied by the Director. (j) Individual Wastewater Discharge Permit Issuance: Duration and Contents of Permit: (1) An individual wastewater discharge permit shall be issued for a specified time period, not to exceed five (5) years from the effective date of the permit. An individual wastewater discharge permit may be issued for a period of less than five (5) years, at the discretion of the Director. Each individual wastewater discharge permit will indicate a specific date upon which it will expire. (2) An individual wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the Director to prevent Pass Through or Interference, protect the quality of the waterbody receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. a. Individual wastewater discharge permits must contain: (i) A statement that indicates the wastewater discharge permit issuance date, expiration date and effective date; (ii) A statement that the wastewater discharge permit is nontransferable without prior notification to the City in accordance with Subsection (n)(2) "Individual Wastewater Discharge Permit Cessation, Revocation, Transfer, Reissuance" of this Section 17-10, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; (iii) Effluent limits, including Best Management Practices, based on applicable Pretreatment Standards; (iv) Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or Best Management Practices) to be monitored, sampling location, sampling frequency, and sample type based on Federal, State, and Local law; (v) A statement of applicable civil and criminal penalties for violation of Pretreatment Standards and Requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable Federal, State, or Local law; (vi) Requirements to control Slug Discharges. b. Individual wastewater discharge permits may contain, but need not be limited to, the following conditions: (i) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (ii) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (iii) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; (iv) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (v) The unit charge or schedule of User charges and fees for the management of the wastewater discharged to the POTW; (vi) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (vii) A statement that compliance with the individual wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State Pretreatment Standards, including those which become effective during the term of the individual wastewater discharge permit; and (viii) Other conditions as deemed appropriate by the Director to ensure compliance with this ordinance, and State and Federal laws, rules and regulations. (k) Permit Appeals: (1) An administrative appeal from any terms of an individual wastewater discharge permit issued under this Section shall be made pursuant to Section 17-1(d) of this Division, but the effectiveness of the individual wastewater discharge permit shall not be stayed pending the administrative appeal. (2) Decisions by the Board not to reconsider an individual wastewater discharge permit, not to issue an individual wastewater discharge permit, or not to modify an individual wastewater discharge permit shall be considered final administrative actions for purposes of judicial review. (3) Aggrieved parties seeking judicial review of the final administrative individual wastewater discharge permit decision must do so by filing a complaint with the St. Joseph County, Indiana Superior or Circuit Court. (l) Permit Modification: The Board of Public Works may modify a wastewater discharge permit for good cause, including but not limited to, the following reasons: (1) To incorporate any new or revised Federal, State or local Pretreatment Standards or Requirements; (2) To address significant alterations or additions to the User's operation, processes, or wastewater volume or character since the time of the individual wastewater discharge permit issuance; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the City's POTW, City personnel, or the receiving waters; (5) Violation of any terms or conditions of the individual wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) To correct typographical or other errors in the individual wastewater discharge permit; or (8) To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with Subsection (n)(2) of this Section 17-10. (m) Wastewater Analysis: When requested by the Director, a User must submit information on the nature and characteristics of its wastewater within sixty (60) days of the request. The Director is authorized to prepare a form for this purpose and may periodically require Users to update this information. (n) Individual Wastewater Discharge Permit Cessation, Revocaton, Transfer, Reissuance: (1) Individual wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All individual wastewater discharge permits issued to a User are void upon the issuance of a new individual wastewater discharge permit to that User. (2) Individual wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least thirty (30) days advance notice to the Director and the Director approves the individual wastewater discharge permit transfer. The notice to the Director must include a written certification by the new owner or operator which: a. States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; b. Identifies the specific date on which the transfer is to occur; and c. Acknowledges full responsibility for complying with the existing individual wastewater discharge permit. Failure to provide advance notice of a transfer renders the individual wastewater discharge permit void as of the date of facility transfer. (3) A User with an expiring individual wastewater discharge permit shall apply for an individual wastewater discharge permit reissuance by submitting a complete permit application, in accordance with Subsection (f) "Individual Wastewater Discharge Permit - Contents" of this Section 17-10, a minimum of ninety (90) days prior to the expiration of the User's existing individual wastewater discharge permit. (4) The Director may revoke an individual wastewater discharge permit for good cause, which shall be subject to appeal under Section 17-11(d) of this Division, but the effectiveness of revocation shall not be stayed pending administrative appeal. Reasons for permit revocation by the Director include but are not limited to the following: a. Failure to notify the Director of significant changes to the wastewater prior to the changed discharge; b. Failure to provide prior notification to the Director of changed conditions pursuant to Subsection (o)(5) of this Section 17-10; c. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; d. Falsifying self-monitoring reports and certification statements; e. Tampering with monitoring equipment; f. Refusing to allow the Director timely access to the facility premises and records; g. Failure to meet effluent limitations; h. Failure to pay fines; i. Failure to pay sewer charges; j. Failure to meet compliance schedules; k. Failure to complete a wastewater survey or the wastewater discharge permit application; l. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or m. Violation of any Pretreatment Standard or Requirement, or any terms of the wastewater discharge permit or this ordinance. (o) Reporting requirements—List of Required Reports: (1) Baseline Monitoring Reports. Within either one hundred eighty (180) days after the effective date of a categorical Pretreatment Standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing Categorical Industrial Users currently discharging to or scheduled to discharge to the POTW shall submit to the Director a report which contains the information listed in Subsection a. below. At least ninety (90) days prior to commencement of their discharge, New Sources, and sources that become Categorical Industrial Users subsequent to the promulgation of an applicable categorical Standard, shall be required to submit to the Director a report which contains the information listed in Subsection a. below. A New Source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. a. Users described above shall submit the information set forth below: (i) Identifying information. The name and address of the facility including the name of the operator and owners together with contact information, description of activities, facilities, and plant production processes on the premises. (ii) Environmental control. A list of any environmental permits held by or for the facility. (iii) Description of operations. A brief description of the nature, average rate of production (including each product produced by type, amount, processes and rate of production), and standard industrial classifications of the operation(s) carried out by such User. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated process. (iv) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in Subsection 17-8(d) (40 CFR 403.6(e)). (v) Measurement of pollutants. 1. Identification of the categorical Pretreatment Standards applicable to each regulated process and any new categorically regulated processes for Existing Sources. 2. Submission of the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the Director) of regulated pollutants in the discharge from each regulated process. 3. Instantaneous, daily maximum and long term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out herein. Where the Standard requires compliance with a BMP or pollution prevention alternative, the User shall submit documentation as required by the Director or the applicable Standards to determine compliance with the Standard. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the User should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with Pretreatment Standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with the supporting data shall be submitted to the Control Authority. 4. Sampling and analysis shall be performed in accordance with Subsection (p)(1) "Analytical Requirements" for reports, Section 17-10 of this Division. 5. The Director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. 6. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant Discharges to the POTW. 7. Sampling must be performed in accordance with procedures set out herein. (vi) Reserved. (vii) Compliance Certification. A statement, reviewed by the User's Authorized Representative as defined in Section 17-5.1, Division 1 of this Article and certified by a qualified professional, indicating whether Pretreatment Standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the retreatment Standards and Requirements. (viii) Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the Pretreatment Standards, the shortest schedule by which the User will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable Pretreatment Standard. A compliance schedule pursuant to this subsection must meet the requirements set out in the subsequent Subsection (o)(2) of this Section 17-10. (ix) Signature and Report Certification. All baseline monitoring reports must be certified in accordance with Subsection (p)(5)(a) of this Section 17-10, and signed by an Authorized Representative as defined in Section 17-5.1, Division 1 of this Article. (2) Compliance Schedule Reports. The following conditions shall apply to the Compliance Schedule required by the foregoing Subsection (o)(1)(a)(viii) of this Section 17-10. a. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the User to meet the applicable Pretreatment Standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); b. No increment referred to above shall exceed nine (9) months; c. The User shall submit a progress report to the Director no later than fourteen (14) days following each date in the schedule and the final date of compliance including, at a minimum, whether or not the user complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the User to return to the established schedule; and d. In no event shall more than nine (9) months elapse between such progress reports to the Director. (3) Reports on Compliance with Categorical Pretreatment Standard Deadline. Within ninety (90) days following the date for final compliance with applicable categorical Pretreatment Standards, or in the case of a New Source following commencement of the introduction of wastewater into the POTW, any User subject to such Pretreatment Standards and Requirements shall submit to the Director a report containing the information described in Subsection (o)(1)(a)(v) ("Measurement of Pollutants") of this Section 17-10. For Users subject to equivalent mass or concentration limits established in accordance with the procedures in Subsection 17-8(d) of this Division, this report shall contain a reasonable measure of the User's long-term production rate. For all other Users subject to categorical Pretreatment Standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the User's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with Subsection (p)(5)(a) of this Section. All sampling will be done in conformance with Subsection (p)(2) "Sample collection" of this Section 17-10. (4) Periodic Compliance Reports. a. Any permittee subject to a pretreatment standard set forth in this Division shall submit to the Director, twice per year, unless required more frequently by the discharge permit, a periodic compliance report on forms provided or prescribed by the Director indicating the nature and concentration of prohibited or regulated substances in the effluent. Included in the report shall be a record of all measured or estimated average and maximum daily flows during the reporting period, computed by verifiable techniques as required by the applicable discharge permit. In cases where the Pretreatment Standard requires compliance with a Best Management Practice (BMP) or pollution prevention alternative, the User must submit documentation required by the Director or the Pretreatment Standard necessary to determine the compliance status of the User. b. Users shall be required to have a Certified Industrial Wastewater Operator of the State of Indiana sign all periodic compliance reports indicating whether pretreatment Standards and Requirements are being met on a consistent basis, and if not whether additional operation and maintenance and/or additional pretreatment is required to meet the pretreatment standards and requirements, unless otherwise indicated in the User's permit. The Director shall specify the certification class required in the User's permit. c. All periodic compliance reports must be signed and certified in accordance with Subsection (p)(5)(a) of this Section 17-10 and signed by an Authorized Representative as defined in Section 17-5.1, Division 1 of this Article. d. All wastewater samples must be representative of the User's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a User to keep its monitoring facility in good working order shall not be grounds for the User to claim that sample results are unrepresentative of its discharge. e. If a User subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the Director, using the procedures prescribed in Subsection (p)(1), "Analytical Requirements" and in Subsection (p)(2) "Sample Collection" of this Section 17-10, the results of this monitoring shall be included in the report. f. A permittee may request a sampling waiver for pollutants not present. Such requests shall be subject to the review and approval of the Director. At a minimum, such requests shall include: (i) Sampling data and other technical factors demonstrating that the pollutant is not present in the discharge; (ii) Data from greater than one (1) sampling of the facility's process wastewater prior to any treatment; and (iii) A certification statement in accordance with Subsection (p)(5)(a) of this Section, and signed by an Authorized Representative as defined in Section 17-5.1, Division 1 of this Article. The Director may also require additional information or data. Approved requests for a sampling waiver for pollutants not present shall result in a modification of the permittee's industrial wastewater discharge permit. (5) Reports of Changed Conditions. Each User must notify the Director of any significant changes to the User's operations or system which might alter the nature, quality, or volume of its wastewater at least thirty (30) days before the change. a. The Director may require the User to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under Subsection (f) "Individual Wastewater Discharge Permit - Contents" of this Section 17-10. b. The Board of Public Works may issue an individual wastewater discharge permit under Subsection (j) of this Section 17-10 or modify an existing wastewater discharge permit under Subsection (l) "Permit Modification" of this Section 17-10, in response to changed conditions or anticipated changed conditions. (6) Reports of Spills and Potential Problems. a. In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a Slug Discharge or a Slug Load, or any unusual flows or wastes that might cause potential problems for the POTW, the User shall immediately telephone and notify the Director of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the User. b. Within five (5) days following such discharge, the User shall, unless waived by the Director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the User to prevent similar future occurrences. Such notification shall not relieve the User of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the User of any fines, penalties, or other liability which may be imposed pursuant to this Division. c. A notice shall be permanently posted on the User's bulletin board or other prominent place advising employees who to call in the event of a discharge described in Subsection (6)a. above. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. d. Significant Industrial Users are required to notify the Director immediately of any changes at its facility affecting the potential for a Slug Discharge. (7) Reports from Unpermitted Users. All Users not required to obtain an individual wastewater discharge permit shall provide appropriate reports to the Director as the Director may require. (8) Notice of Violation/Repeat Sampling and Reporting. If sampling performed by a User indicates a violation, the User must notify the Director within twenty-four (24) hours of becoming aware of the violation. The User shall also repeat the sampling and analysis and submit the results of the repeat analysis to the Director within thirty (30) days after becoming aware of the violation. (9) Notification of the Discharge of Hazardous Waste. a. Any User who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and State hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the User discharges more than one hundred (100) kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the User: An identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All notifications must take place no later than one hundred eighty (180) days after the discharge commences. Any notification under this Subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions must be submitted under Subsection (o)(5) "Reports of Changed Conditions" of this Section 17-10. The notification requirement in this Subsection does not apply to pollutants already reported by Users subject to categorical Pretreatment Standards under the self-monitoring requirements of Subsection (o)(1) "Baseline Monitoring Report; Subsection (o)(3) Reports on Compliance with Pretreatment Standard Deadlines; and Subsection (o)(4) "Periodic Compliance Reports" of this Section 17-10. b. Dischargers are exempt from the requirements of Subsection (9)a. above, during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the User discharges more than such quantities of any hazardous waste do not require additional notification. c. In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the User must notify the Director, the EPA Regional Waste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. d. In the case of any notification made under this Section, the User shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. e. This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this Division, a permit issued thereunder, or any applicable Federal or State law. (10) Notification of batch or infrequent discharge. The Director may require an industrial user that discharges industrial wastewater on a batch or infrequent basis to submit notification to the Director up to twenty-four (24) hours prior to discharge of such wastewater, in order to allow inspection and sampling. (p) General Standards for Reports: (1) Analytical Requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical Pretreatment Standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the Director or other parties approved by EPA. The Director may require more sensitive analysis if reported pollutant concentrations are not sufficient to determine compliance with Pretreatment Standards or to determine if such Standards are necessary. (2) Sample Collection. a. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, and be based on data that is representative of conditions occurring during the reporting period. b. Except as indicated in Sections c and d below, the User must collect samples using 24-hour flow proportional composite sampling techniques unless time-proportional composite sampling or grab sampling is authorized by the Director. Where time-proportional composite sampling or grab sampling is authorized by the Director, the samples must be representative of the discharge. c. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. d. For sampling in support of baseline monitoring and ninety-day compliance reports, a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which no historical sampling data are available. For Periodic Compliance Reports, required by Subsection 17-10(o)(4), the User is required to collect the number of grab samples necessary to assess and assure compliance with applicable Pretreatment Standards and Requirements. (3) Date of Receipt of Reports. Written reports will be deemed to have been submitted on the date postmarked. For reports, which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. If a report is due on a date that does not fall on a normal business day, the report shall be considered timely if it is received on the next normal business day. (4) Recordkeeping. Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance, any additional records of information obtained pursuant to monitoring activities undertaken by the User independent of such requirements, and documentation associated with Best Management Practices established under Section 17-8. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; any information used to demonstrate that the analysis was performed in accordance with methods approved in 40 CFR Part 136; and the results of such analyses. These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning the User or the City, or where the User has been specifically notified of a longer retention period by the Director. (5) Certification Statements. a. Certification of Permit Applications and User Reports. The following certification statement is required to be signed and submitted by Users submitting permit applications in accordance with Subsection (f) of this Section 17-10; Users submitting baseline monitoring reports under Subsection (o)(1) of this Section 17-10; Users submitting reports on compliance with the categorical Pretreatment Standard deadlines under Subsection (o)(3) of this Section 17-10; Users submitting periodic compliance reports required by Subsection (o)(4) or other required User reports. The following certification statement must be signed by an Authorized Representative as defined in Division 1 of this Article: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." b. Non-Significant Categorical Industrial User Certification. The following certification is required to be signed and submitted by Users meeting the conditions described in Section 17-5.1, Division 1 of this Article. This certification statement shall be submitted with Non-Significant Categorical Industrial User Reports and must be signed by an Authorized Representative as defined in Division 1 of this article: "Based on my inquiry of the person or persons directly responsible for managing compliance with the categorical Pretreatment Standards under 40 CFR _______, I certify that, to the best of my knowledge and belief that during the period from _______, to _______, [month, day, year]; (a) The facility described as _____ ___________ met the definition of a non-significant categorical Industrial User as described in 403.3(v)(2); (b) The facility complied with all applicable Pretreatment Standards and requirements during this reporting period; and (c) The facility never discharged more than 100 gallons of total categorical wastewater on any given day during this reporting period. This compliance certification is based upon the following information: _____ _____ _____ " (q) Confidential Information: Information and data on a User obtained from reports, surveys, wastewater discharge permit applications, individual wastewater discharge permits and monitoring programs, and from the Director's inspection and sampling activities, shall be available to the public without restriction, unless the User specifically requests, and is able to demonstrate to the satisfaction of the Director, that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets under the Indiana Access to Public Records Act (IC 5-14-3-4(a)(4)). Any such request must be asserted at the time of submission of the information or data. When requested and demonstrated by the User furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon request to governmental agencies for uses related to the NPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other effluent data, as defined at 40 CFR 2.302 shall not be recognized as confidential information and shall be available to the public without restriction. (r) Board of Works powers: If any waters or wastes are discharged, or are proposed to be discharged, to the public sewers, which waters contain the substances or possess the characteristics enumerated in this Article, and which in the judgment of the Board may have a deleterious effect upon the sewage works, processes, equipment or receiving waters, or otherwise create a hazard to life or constitute a public nuisance, the Board may do any of the following: (1) Require new users or users with significant increase in discharges to submit information on wastewater characteristics and obtain prior approval for discharges. For purposes of this requirement, flow increases of twenty (20) percent or greater, or the discharge of any previously unreported pollutants shall be deemed significant. (2) Reject the wastes in whole or in part for any reason deemed appropriate by the City. (3) Require pretreatment of such wastes to within the limits of normal domestic sewage as defined. (4) Require control of flow equalization of such wastes so as to avoid any "slug" loads or excessive loads that may be harmful to the treatment works. (5) Require payment of a surcharge on any excessive flows or loadings discharged to the treatment works to cover the additional costs of having capacity for and treating such wastes. If the Board permits the pretreatment or equalization of waste flows, the design and installation of the plant and equipment shall be subject to the review and approval of the Board and subject to the requirements of all applicable codes, ordinances and laws. Board action under Subsections (r)(2), (3), (4) and (5) above, shall be subject to judicial review as per Subsection 17-11(d) of this Division. (s) Publication of Users in Significant Noncompliance: The Director shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdiction served by the POTW, a list of the Users which, at any time during the previous twelve (12) months, were in Significant Noncompliance with applicable Pretreatment Standards and Requirements. The term Significant Noncompliance shall be applicable to all Significant Industrial Users (or any other Industrial User that violates Subsections (3), (4), or (8) of this Subsection) and shall mean: (1) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of all the measurements for the same pollutant parameter taken during a six-month period exceed (by any magnitude) a numeric Pretreatment Standard or Requirement, including Instantaneous Limits; (2) Technical Review Criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of a numeric Pretreatment Standard or Requirement including Instantaneous Limits, as defined in Division 1, Section 17-5.1 of this Article multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other violation of a Pretreatment Standard or Requirement as defined in Division 1, Section 17-5.1 of this Article (Daily Maximum, long-term average, Instantaneous Limit, or narrative standard) that the Director determines has caused, alone or in combination with other discharges, Interference or Pass Through (including endangering the health of POTW personnel or the general public); (4) Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the Director's exercise of his or her emergency authority to halt or prevent such a discharge; (5) Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in an individual wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide within thirty (30) days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical Pretreatment Standard deadlines, periodic self monitoring reports, and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; or (8) Any other violations(s), which may include a violation of Best Management Practices, which the Director determines will adversely affect the operation or implementation of the local pretreatment program. (t) False information: Any person who makes any false statement, representation or certification in any application, record, report, plan or other document filed or required to be maintained pursuant to this division, or who falsifies, tampers with, or renders inaccurate any monitoring device or method required under this Division, may be assessed a civil penalty of not more than two thousand five hundred dollars ($2,500.00). (u) Users required to file reports: All Users subject to Federal Categorical Pretreatment Standards will be required to file all reports as described in 40 CFR 403, which is incorporated herein by reference, including amendments that may hereafter be made as the same are published in the Code of Federal Regulations. These reports shall include, but not be limited to, baseline monitoring reports, compliance schedule reports, compliance date reports and periodic compliance reports. (v) Compliance Schedule Reports: Compliance schedule reports must be submitted by any nonresidential discharger not subject to categorical standards who is not in compliance with the terms and conditions of this Division. (w) Bypass: (1) For the purposes of this Section: (a) Bypass means the intentional diversion of wastestreams from any portion of a User's treatment facility. (b) Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. (2) A User may allow any bypass to occur which does not cause Pretreatment Standards or Requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Subsections (w)(3) and (4) of this Section. (3) Bypass Notifications. (a) If a User knows in advance of the need for a bypass, it shall submit prior notice to the Director, at least ten (10) days before the date of the bypass, if possible. (b) A User shall submit oral notice to the Director of an unanticipated bypass that exceeds applicable Pretreatment Standards within twenty-four (24) hours from the time it becomes aware of the bypass. A written submission shall also be provided within five (5) days of the time the User becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The Director may waive the written report on a case-by-case basis if the oral report has been received within twenty-four (24) hours. (4) Bypass Prohibition. (a) Bypass is prohibited, and the Director may take an enforcement action against a User for a bypass, unless: i. Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; ii. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and; iii. The User submitted notices as required under foregoing Subsection (w)(3) of this section. (b) The Director may approve an anticipated bypass, after considering its adverse effects, if the Director determines that it will meet the three conditions listed in Subpart (a)(i) through (iii) above. (x) Upset: (1) For the purposes of this Section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical Pretreatment Standards because of factors beyond the reasonable control of the User. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. (2) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical Pretreatment Standards if the requirements of Subsection (x)(3)(c), below, are met. (3) A User who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: (a) An upset occurred and the User can identify the cause(s) of the upset; (b) The facility was at the time being operated in a prudent and workman-like manner and in compliance with applicable operation and maintenance procedures; and (c) The User has submitted the following information to the Director within twenty-four (24) hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five (5) days): (i) A description of the indirect discharge and cause of noncompliance; (ii) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and (iii) Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (4) In any enforcement proceeding, the User seeking to establish the occurrence of an upset shall have the burden of proof. (5) Users shall have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical Pretreatment Standards. (6) Users shall control production of all discharges to the extent necessary to maintain compliance with categorical Pretreatment Standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost or fails.
(Ord. No. 10095-11, § VI, 6-13-11; Ord. No. 10317-14, § II, 7-28-14)