For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-7 — Building sewers and connections

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-7

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/5e9bd177-bbfd-43c8-b398-a2c627ce6a8d

Sec. 17-7. - Building sewers and connections.

(a) No unauthorized person shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Board of Public Works or designee. (b) There shall be two (2) classes of building sewer permits: (1) For residential and commercial service; and (2) For service to establishments producing material wastes. In either case, the owner or his agent shall make application on a special form furnished by the City. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the Inspector. A permit and inspection fee of twenty-five dollars ($25.00) for a residential or commercial building permit and fifty dollars ($50.00) for an industrial building sewer permit shall be paid to the City of South Bend at the time the application is filed. (c) All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the City from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. (d) A separate and independent building sewer shall be provided for every building; except where one (1) building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, courtyard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one (1) building sewer. (e) Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the Inspector, to meet all requirements of this Article. (f) The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointly testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the City. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Society of Testing Materials and Water Pollution Control Federation Manual of Practice No. MOP9 shall apply. (g) Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer. (h) No person shall make connection of roof downspouts, basement drains, sump pumps, exterior fountain drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. (i) The connection of a building sewer into the public sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the City, or the procedures set forth in appropriate specifications of the American Society of Testing Materials and the Water Pollution Control Federation Manual of Practice No. MOP9. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the City Engineer before installation. (j) The applicant for the building sewer permit shall notify the Inspector when the building sewer is ready for inspection and connection to the public sewer. The construction shall be made under the supervision of the Inspector or his representative. (k) All excavations for building sewer installation must be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the City.

(Ord. No. 7942-88, § 1)

Ask a question about South Bend law

Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.