For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-79.1 — System Development Charge for Wastewater inside and outside City limits

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 17-79.1

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/6753c6df-2288-4d20-ac45-7466b49e01c5

Sec. 17-79.1. - System Development Charge for Wastewater inside and outside City limits.

(a) No customer will be less than one (1) ERU. There will be no partial ERUs. The City shall round down to the closest applicable ERU calculation at all times. (b) For every new connection to the South Bend Municipal Sewer Works, a system development charge of one thousand one hundred forty-five dollars ($1,145.00) shall be collected per ERU. All charges shall be billed by the City at the time the application for service is filed. (c) For all non-residential types of structures, the ERU calculation shall be based upon the water and sewer use values provided in 327 IAC 3-6-11 divided by three hundred ten (310) gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer capacity certification for the structure and three hundred ten (310) gallons per day, described in the Board of Works Resolution No. 20-2017. For mixed use structures, which include residential and non-residential units, the ERU calculation shall be based on the addition of the number of residential units and the water and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. (d) For parcels with an existing connection to City sewer seeking to redevelop the property, a System Development Charge will be collected if the redevelopment necessitates a larger water meter size to accommodate increased flow. The System Development Charge will be calculated using meter size equivalency factors shown below. The difference between the existing meter size equivalency factor and new meter size equivalency factor will be collected. For example, if the existing development on a parcel has a ⅝ inch meter, and the new development will require a one (1) inch meter, the SDC will be $2,863.00 (SDC for one (1) inch) - $1,145.00 (SDC for ⅝ inch) = $1,718.00. There will not be a credit given if the meter size is reduced. Existing water tap size will be used if the meter is not available. Upon application for connection, the new meter size will need to be determined. Meter Size | Equivalency Factor | SDC Charge 5/8 in. | 1.0 | $1,145 ¾in. | 1.5 | $1,718 1 in. | 2.5 | $2,863 1 ½ in. | 5.0 | $5,725 2 in. | 8.0 | $9,160 3 in. | 15.0 | $17,175 4 in. | 25.0 | $28,625 6 in. | 50.0 | $57,250 8 in. | 80.0 | $91,600 10 in. | 115.0 | $131,675 (e) For residential infill developments of five (5) or fewer residential units per parcel, the System Development Charge shall be waived. For residential infill developments consisting of five (5) units or more, whether developed at one time or over a period of time, the System Development Charge shall be waived for infill residential housing units constructed by not-for-profit development companies or supported by low-income housing tax credits.

(Ord. No. 10461-16, § 1, 10-24-16; Ord. No. 10865-22, § I, 6-28-22)

Ask a question about South Bend law

Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.