Sec. 6-36.3. - Permits.

(a) Required in advance. No person shall perform or cause to be performed the installation of heating, ventilating, air conditioning or refrigeration equipment or systems without obtaining, in advance, a permit from the Department. (b) Where a person shall unlawfully proceed to do any work or installation without a permit as required herein, the applicable permit fee shall be tripled as a penalty. The payment of such penalty shall not release the person in default from any other penalties provided herein, nor from compliance with any relevant provisions of the Municipal Code. (c) Fees. Each application for a permit for installation of heating, ventilating, air conditioning, and refrigeration equipment or systems shall be accompanied by fees in accordance with the schedule below, with a minimum permit fee being sixty dollars ($60.00). When the total capacity of any system in any single installation is provided by more than one (1) unit, the sum of the capacities of each unit and the total number of such units shall determine the fee. (1) Heating units: .....$60.00 (2) Air Conditioning, Central, Electric: ..... a. Less than 10 tons .....$60.00 b. Over 10 tons .....$70.00 c. Water chillers .....$85.00 d. EMI-air blower .....$60.00 (3) Ventilating and exhaust systems: ..... a. Less than 500 CFM capacity .....$6.00 b. 500 to 1,500 CFM capacity .....$12.00 c. Greater than 1,500 CFM capacity .....$20.00 (4) Ventilating commercial hoods; including make up air: .....$120.00 (5) Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: ..... a. Up to 10 horsepower, each .....$60.00 b. More than 10 horsepower, each .....$75.00 (6) Rooftop combination: ..... a. Up to 7½ tons .....$60.00 b. 7½ tons or more .....$75.00 (7) Heat pumps: ..... a. Up to 7½ tons, each .....$75.00 b. 7½ tons or more, each .....$85.00 c. Earth, coupled water source .....$60.00 (8) Mini-split Unit .....$60.00 a. Each Head .....$20.00 (9) Boilers, steam or hot water: ..... a. Up to 300,000 Btu .....$60.00 b. 300,000 Btu or more .....$70.00 (10) Combination air conditioning/heating: ..... a. VAV Boxes w/Coil .....$60.00 b. P-Tac, per Unit .....$60.00 (11) Air handlers .....$70.00 (12) Duct and register: ..... a. Up to 30 openings .....$60.00 b. 31-100 openings .....$80.00 c. Over 100 openings .....$100.00 (13) Backup generators—Gas line: .....$60.00 (14) Gas reconnection, each .....$60.00 (15) Gas piping (distribution of piping to equipment) to be included on permit application, each gas piping system, per outlet .....$3.00 (16) Woodburning stoves, per flue (including chimney and chimney connector) .....$60.00 (17) Each reinspection fee .....$60.00 (18) Each additional final inspection .....$70.00

(Ord. No. 8243-92, § 1; Ord. No. 8566-94, § 3; Ord. No. 8931-98, § 7, 8-24-98; Ord. No. 9528-04, § 11; Ord. No. 9779-07, § VIII, 8-27-07; Ord. No. 10137-11, § VII, 12-12-11; Ord. No. 10394-15, § X, 10-26-15; Ord. No. 11211-25, § I, 6-23-25)