For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-6.4 — Demolition permit and registration

Code of Ordinances of the City of South Bend, Indiana (Codified through Ordinance No. 11254-26, enacted February 9, 2026 (Supp. No. 65)) · South Bend Code of Ordinances § 6-6.4

Corpus is an independent public-information project, not the official City of South Bend website. Stable reference: corpuslaw.us/code/0c0c5534-0c70-4592-a931-db361f7e2293

Sec. 6-6.4. - Demolition permit and registration.

(a) No person, firm, or corporation shall demolish or cause to be demolished a building or structure in the City without obtaining, in advance, a demolition permit from the Department. (b) The applicant shall file with the Department a completed application on the form provided, with all information indicated on the application submitted in full and with all other required information. (c) All persons performing demolition work within the City shall be registered with the Department. Registration shall be on forms provided by the Department and shall be accompanied by payment of a registration fee of one hundred twenty-five dollars ($125.00). Said registration shall be for a term of one (1) year, commencing on the effective date of the surety bond required by this section. However, an owner of the property performing their own demolition work shall be exempt from the bonding and registration requirement, to the extent that buildings or structures being demolished are six hundred (600) square feet or under. For buildings or structures being demolished which are over six hundred (600) square feet, the owner shall be subject to the bonding requirement set forth in Subsection 6-6.4(d). (d) The Department shall not issue a demolition permit until the applicant files a ten thousand dollar ($10,000.00) bond with the Department, which bond must be approved by the Controller, or their designee, indemnifying the City against all loss or damage to public ways, public places, and other public property during the course of the work under the demolition permit and further conditioning that the applicant will indemnify the City and pay any and all personal and property damages caused by any negligent act or omission in the demolition of such building or structure. However, the owner of the property performing their own demolition work on a building or structure under six hundred (600) square feet shall be exempt from the bond requirement. (e) Prior to commencing demolition or renovation activities, the owner or operator of a facility must meet all inspection and notice requirements pursuant to 326 IAC 14-10 et seq., as amended from time to time. (f) In all cases where traffic control may be necessary during the demolition work or whenever the building or structure to be demolished is adjacent to arterial streets, the permit holder shall be required to comply with all Department of Public Works and/or Board of Public Works requirements for accessing the right-of-way. The permit holder shall be liable upon his performance bond for the placement of any necessary traffic control devices, such as barricades, warning signs and lights. (g) The permit holder shall place any necessary devices such as barricades, warning signs, and lights when performing demolition work over, across, or upon public sidewalks. (h) The permit holder shall take all necessary precautions to protect public ways, public places, and other public property during the course of the work authorized by the demolition permit. The permit holder must repair or replace any public ways, public places, and other public property damaged during the demolition, to conform to current City specifications, with the work to be approved by the Public Works Department. (i) The permit holder shall cut off the sewer service connection to the main sewer line by plugging the sewer line with concrete sufficient to prevent a back-up leak. The permit holder shall notify the Department to inspect the sewer line plug before he begins back-filling. (j) After removing all materials and debris from any basement of a building to be demolished, the permit holder shall leave site in a "buildable state," which shall be considered clean compactable fill level with the surrounding area, as determined by the Department. Rubbleized brick does not constitute a "buildable state," unless it otherwise meets the requirements of this definition. (k) No fire shall be permitted on the demolition site for the disposition of material resulting from the demolition. (l) All construction and demolition ("C/D") waste must be handled and disposed of properly in a state permitted municipal solid waste ("MSW") landfill, non-MSW landfill, or C/D site that is authorized to accept such waste (defined by 329 IAC 10-2-37). C/D waste may include scrap lumber, bricks, concrete, stone, glass, wallboard (drywall), roofing, plumbing fixtures, wiring, and nonasbestos insulation. (m) The permit holder shall fill to grade level and grade the lot with three (3) inches of topsoil. Seeding must be done at the time the lot is graded; provided, however, that seeding shall not be required if a new building is scheduled to be constructed on the demolition site within six (6) months after completion of the demolition.

(Ord. No. 8243-92, § 1; Ord. No. 8931-98, § 2; Ord. No. 9528-04, § 4; Ord. No. 9902-09, § III, 2-9-09; Ord. No. 10225-13, § II, 3-25-13; Ord. No. 11211-25, § I, 6-23-25)

Ask a question about South Bend law

Corpus searches the South Bend sections it holds and shows the ones that match, with their citations. Free, no sign-in.