§ 8-613 — Land disturbance permit
Code of the Unified Government of Wyandotte County/Kansas City, Kansas (Supp. No. 52: codified through Ordinance No. O-61-26, passed May 21, 2026) · Kansas City, Kan., Unified Government Code § 8-613
Corpus is an independent public-information project, not the official City of Kansas City website. Stable reference: corpuslaw.us/code/4d55ae30-3dcf-4d1b-a8fe-63c2bcb505ed
Sec. 8-613. - Land disturbance permit.
(a) Permit required. No person may engage in any land disturbance activity, including persons engaged in land disturbance activity related to utility installation or maintenance, without first obtaining a land disturbance permit from the unified government, except as provided in this article. Any land disturbance permit shall encompass all land disturbance activity at the locations and during the times covered by the permit, whether such land disturbance activity is performed by the permittee, his or her contractor or subcontractors, a utility or its contractors, or any other independent agent. The permit fee shall be doubled for sites where land disturbance has occurred without a permit in violation of this article. (b) Permit issuance. The issuance of a permit shall constitute an authorization to do only that work described in the permit or shown on the approved plan. All work shall be completed in strict compliance with the requirements of this article. A copy of the approved plan and the permit must be available on the site for inspection by the county engineer. Field markings showing limits of disturbance must be on site during all installation of erosion and sediment control measures, construction, or other land disturbance activities. (c) Other construction permits delayed. When a person is developing a site and a permit is required in accordance with this article, no other construction permits shall be issued to make improvements on that site until the person has secured a land disturbance permit for the same site. (d) Exemptions. A permit is not required under this article for the following: (1) Any land disturbance activity that, in the course of the subject development, disturbs or will disturb a cumulative total of less than one acre of surface area; provided that none of the following scenarios exist: a. Land disturbance is proposed within 50 feet of a natural or improved channel or drainage way. b. Building construction of new roofed structures of more than 1,000 square feet on a site. c. Land disturbance that includes 50 cubic yards or more of fill. (2) All land farming operations, including plowing or tilling of land for the purpose of crop production or the harvesting of crops on land located in the agricultural districts, including AG and AG (county) zoning districts; (3) Existing nursery operations conducted as a permitted main or accessory use; (4) Any noncommercial garden in any zone that disturbs less than one acre of surface area; or (5) Any emergency activity that is immediately necessary for the protection of life, property, or natural resources. (e) Application. (1) To obtain a permit, the property owner of the site where the land disturbance activity is to be performed or the property owner's authorized representative first must submit a complete application in writing upon forms prescribed by the unified government. (2) Each application shall bear the name(s) and address(es) of the property owner and developer of the site, and of any consulting firm retained by the applicant together with the name of the applicant's principal contact and shall be accompanied by a filing fee. A land disturbance permit will only be issued in the name of the current property owner. (3) A qualified erosion control professional shall be identified on every permit as a responsible party who the unified government official may contact regarding installation, maintenance, notice of violations and removal of erosion and sediment control measures and to ensure that all work is completed in compliance with the SWPPP and all requirements of the land disturbance permit approved by the unified government. The permit holder is responsible for timely written notification to the unified government of any changes to the qualified erosion control professional. (4) The property owner may designate, in writing, others to act on his or her behalf, however, the responsibility for compliance shall remain with the property owner until the issued permit has been officially closed. (5) The land disturbance activity described in the land disturbance permit application shall be commenced within the time limits defined on the application. (6) Application shall include a statement that any land clearing, construction, or development involving the movement of earth shall be in accordance with the erosion and sediment control plan and that a certified contractor shall be on site on all days when construction or grading activities take place. (f) Review and approval. The county engineer will review each application to determine its conformance with the provisions of this article and the erosion and sediment control design criteria authorized hereby. The county engineer shall, in writing: (1) Approve the permit application if the application complies with all the requirements of this article and the county engineer determines that best management practices will be employed to control erosion and sedimentation to the maximum extent practicable; (2) Approve the permit application subject to conditions, as herein authorized, as may be reasonably necessary to secure the objectives of this article or prevent the creation of a nuisance or an unreasonable hazard to persons or to public or private property, and issue the permit subject to these conditions; or (3) Disapprove the permit application, indicating, in writing, the reason therefore. (g) Conditions of approval. In approving the issuance of any permit, the county engineer may impose conditions as may be reasonably necessary to secure the objectives of this article or prevent the creation of a nuisance or unreasonable hazard to persons or to public or private property. These conditions may include, but are not limited to: (1) The granting (or securing from others) and the recording in county land records of easements for drainage facilities, including the acceptance of their discharge on the property of others, and for the maintenance of slopes or erosion control facilities; (2) Adequate control of dust by watering, or other control methods acceptable to the county engineer; (3) Improvements of any existing grading, ground surface or drainage condition on the site (not to exceed the area as proposed for work or development in the application) to meet the standards required under this article for land disturbance, drainage and erosion control; (4) Installation of additional safety related devices when in the proximity of an elementary school, playground or other areas where small children may congregate without adult supervision; (5) Stormwater pollution prevention plan and any other conditions believed necessary to protect the general public's health, safety, and welfare; and (6) Liability insurance if, in the opinion of the county engineer, the nature of the work is such that it may create a hazard to human life or endanger adjoining property or property at a higher or lower elevation, or any street or street improvement, or any other private or public property, then the county engineer may, before issuing the permit, require the applicant to file a certificate of liability insurance. That certificate must be with an insurer admitted to do business in the state. The amount shall not be less than $1,000,000.00 per occurrence and $2,000,000.00 in aggregate. The insurance shall protect the permittee and the unified government from and against all claims by any person whatsoever for loss or damage from personal injury, bodily injury, death, or property damage to the extent caused or alleged to have been caused by the negligent acts or omissions of permittee, its employees, agents, or subcontractors. The values noted above may be adjusted at the discretion of the county engineer based on the exposure and risk involved in the project. Neither issuance of a permit, nor compliance with these provisions or any condition imposed by unified government relieves any person from any responsibility for damage to persons or property otherwise imposed by law, nor imposes any liability upon the unified government for damages to persons or property. (h) Assignment or transfer. (1) The permittee may request that the permit be transferred to another party. The transfer of a permit from one party to another shall be subject to the approval of the county engineer and not be effective until written approval is issued. (2) If the permittee sells any portion of the property before the termination of the permit, the permittee will remain responsible for that portion of the property until the new property owner obtains a permit or until a completion certificate is issued for the portion sold. (3) A new owner of a portion of property covered by an approved plan with respect to which a completion certificate has not been issued, shall, before a building permit is issued, obtain a permit, if, and as, required by this article. (i) Termination upon completion. To terminate the permit, the permittee shall submit a request to terminate permit form, as provided by the unified government, to the county engineer. The county engineer will then inspect the site and make a determination as to whether the permit can be terminated. The site will be considered stabilized when perennial vegetation, pavement, buildings, or structures using permanent materials cover all areas that have been disturbed. The permittee will be notified in writing of the determination. A certificate of occupancy (CO) or temporary certificate of occupancy (TCO) for a building permit may not be released until the land disturbance permit is approved for termination as a result of a successful final inspection.
(Ord. No. O-81-21, § 1, 6-24-2021)
Ask a question about Kansas City law
Corpus searches the Kansas City sections it holds and shows the ones that match, with their citations. Free, no sign-in.