Sec. 19-539. - Wastewater discharge permit—Application; baseline monitoring reports.
Users applying for a wastewater discharge permit must submit to the director an application on a form provided by MSO for that purpose. All new significant industrial users must submit such application 180 days prior to the date of any wastewater discharge. Existing users, subject to new NCPS must, within 180 days after the effective date of the new pretreatment standard, submit such application. New users must, within 90 days before connecting to the POTW, submit such application. All users applying for a wastewater discharge permit or submitting a baseline monitoring report shall submit on the application, at a minimum, as required by 40 CFR 403.12 or by the director, the following information: (a) Name, address, and location of facility. (b) Name of a person or agent authorized to accept legal service of process in behalf of the applicant. (c) Standard industrial classification (SIC) code of both the industry as a whole and any processes for which NCPS have been promulgated and a list of any environmental control permits held by or for the facility. (d) Wastewater constituents and characteristics, including any pollutants in the discharge that are limited by any federal, state, or local standards with sampling and analyses performed in accordance with EPA-approved methods, and meeting the following requirements: (1) The user shall identify the pretreatment standards applicable to each regulated process if the user is a categorical industrial user. (2) All samples shall be representative of daily operations. (3) A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques, where feasible. The director may waive flow-proportional composite sampling for any user that demonstrates that flow-proportional sampling is not feasible. In such cases, samples may be obtained through time-proportional techniques or through a minimum of four grab samples where the user demonstrates that such sampling will provide a representative sample of the effluent being discharged. (4) Where the flow of the stream being sampled is less than or equal to 250,000 gpd, the user must analyze three samples within a two-week period. Where the flow of the stream being sampled is greater than 250,000 gpd, the user must analyze six samples within a two-week period. (5) Samples must be taken immediately downstream from pretreatment facilities, if such exist, or immediately downstream from the regulated process if no pretreatment exists, and prior to mixing with other waste. If nonregulated wastewater is mixed with regulated wastewater prior to pretreatment, the user must measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 CFR 403.6(e) in order to evaluate compliance with pretreatment standards. Where an alternate concentrations or mass limit has been calculated in accordance with 40 CFR 403.6(e), this adjusted limit along with supporting data shall be submitted to the director. Users not subject to categorical standards shall submit analysis of wastewater representative of the effluent discharged to the POTW. (6) The director may allow the submission of an application that uses only historical data, so long as the data provides information sufficient to determine the need for pretreatment. (7) A statement indicating the time, date and place of sampling, methods of analyses, and certifying that such sampling and analyses are representative of normal work cycles and expected pollutants discharges to the POTW shall accompany each application/baseline monitoring report unless such sampling and analyses was performed by the city. (e) Time and duration of all discharges. (f) Daily maximum, daily average, and monthly average wastewater flow rates, including daily, monthly, and seasonal variations, if any. (g) A description of activities, facilities, and plant processes at the site, including a list of all raw materials and chemicals used at the facility which are or could accidentally or intentionally be discharged to the POTW. (h) Copies of site plans, floor plans, and mechanical and plumbing plans, including details showing all sewers, floor drains, and appurtenances by size, location and elevation. The plans shall include a schematic process diagram that indicates all points of discharge to the POTW. All plans must be certified for accuracy by a professional engineer. (i) Each product being produced, by type, amount, process or processes, and the rate of production. (j) The type and amount of raw materials being processed (average and maximum per day). (k) The number of employees, job descriptions of employees, the hours of operation, and the proposed or actual hours of operation of the pretreatment facility. (l) A statement, reviewed by an authorized representative of the user and certified by a professional engineer registered or licensed in the state, stating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance or additional pretreatment is required for the user to meet pretreatment standards and pretreatment requirements. (m) If additional operations and maintenance or pretreatment will be required to meet pretreatment standards or pretreatment requirements, then the user shall supply a compliance schedule outlining the shortest time schedule necessary to accomplish installation or adoption of such additional operations and maintenance or pretreatment. The completion date of the schedule shall not extend beyond the compliance date established for the applicable pretreatment standard or pretreatment requirement. The following conditions shall apply to the schedule: (1) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards or pretreatment requirements (such schedule shall include, where applicable, but not limited to, dates for the hiring of an engineer, completion of preliminary plans, execution of contracts for major components, commencement of construction, commencement of operation, and conducting routine operations). (2) No increment referred to in subsection (m)(1) of this section, supra, shall exceed nine months, nor shall the total compliance period exceed 18 months. (3) No later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the director, including, as a minimum, whether or not the user has met the increment of progress, the reason for any delay, and if appropriate, the steps being taken by the user to return to the established schedule. In no event shall more than nine months elapse between the submission of such progress reports to the director. (n) Any additional information that may be required by the director to evaluate the application. (o) All applications and reports must contain the certification statement and be signed in accordance with section 19-552(c), as amended. (p) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant, neither present nor expected to be present in the discharge based on 40 CFR 403.12(e)(2).
(Ord. No. 9965, § 3(19-619), 3-7-2023)