§ 9-1103 — Stormwater discharges from construction activities

Code of Ordinances of the City of Lawrence, Kansas (Codified through Ordinance No. 10209, enacted April 14, 2026 (Supp. No. 4)) · Lawrence Code of Ordinances § 9-1103

Corpus is an independent public-information project, not the official City of Lawrence website. Stable reference: corpuslaw.us/code/77616916-2377-41a8-86f5-b0616f94203e

Sec. 9-1103. - Stormwater discharges from construction activities.

(a) General requirements for construction sites. (1) The owner of a site of construction activity shall be responsible for compliance with the requirements of this subsection (a). (2) Waste disposal. Solid waste, industrial waste, yard waste and any other pollutants or waste on any construction site shall be controlled through the use of best management practices. Waste or recycling containers shall be provided and maintained by the owner or contractor on construction sites where there is the potential for release of waste. Uncontained waste that may blow, wash or otherwise be released from the site is prohibited. (3) Ready-mixed concrete, or any materials resulting from the cleaning of vehicles or equipment containing or used in transporting or applying ready-mixed concrete, shall be contained on construction sites for proper disposal. Release of these materials is prohibited. (4) Erosion and sediment control. Best management practices shall be implemented to prevent the release of sediment from construction sites. Disturbed areas shall be minimized, disturbed soil shall be managed and construction site entrances shall be managed to prevent sediment tracking. Excessive sediment tracked onto public streets shall be removed immediately if the sediment presents a traffic hazard or public safety concern. (5) Upon completion of permitted construction activity on any site, the property owner and subsequent property owners will be responsible for continued compliance with the requirements of this subsection (a), in the course of maintenance, reconstruction or any other construction activity on the site. (b) Construction sites requiring an approved SWP3. This section applies to all construction sites excluding subdivision developments. Where construction on a site will disturb soil or remove vegetation on one or more acres of land during the life of the construction project, an approved stormwater pollution prevention plan (SWP3) for the project must be provided and implemented by the construction site owner as follows: (1) The area disturbed shall be assumed to include the entire property area unless all applicable plans specifically exclude certain areas from disturbance. (2) The SWP3 must be provided by the owner and submitted to the city for approval. Two copies of the SWP3 shall be submitted to the municipal services and operations department, stormwater engineer. For sites subject to plan review by the planning office, the plan will not be released for construction until an approved SWP3 has been obtained. (3) The preparation and implementation of the SWP3 must comply with subsection (d) of this section. (4) The director will review the SWP3 submitted for the site and will return either a letter of SWP3 approval or a request for revisions within 14 days of submission of the SWP3. Construction activity, including any soil disturbance or removal of vegetation, shall not commence on the site until the director has issued a letter of SWP3 approval. (5) The owner bears the responsibility for implementation of the SWP3 and notification of all contractors and utility agencies on the site. (c) Subdivision developments requiring an approved SWP3. Where construction of a subdivision development will disturb soil or remove vegetation on one or more acres of land during the life of the development project, approved stormwater pollution prevention plans (SWP3s) for the project must be provided and implemented by the subdivision owner as follows: (1) The area disturbed shall be assumed to include the entire platted area. (2) SWP3s must be provided by the subdivision owner and included in public improvement plans submitted to the city engineer for the development. (3) The preparation and implementation of all SWP3s must comply with subsection (d) of this section. (4) SWP3s must be provided for all phases of development, including sanitary sewer construction, storm drainage system construction, waterline, street and sidewalk construction, general grading and the construction of individual homes. The subdivision owner will not be required to provide an SWP3 for the activities of utility agencies within the subdivision. Utility construction is addressed in subsection (e) of this section. (5) Approval of public improvement plans by the city engineer will constitute approval by the director of the included SWP3. Construction activity, including any soil disturbance or removal of vegetation, shall not commence until the public improvement plans are approved for the development. (6) The subdivision owner shall provide a copy of the approved SWP3s to all utility agencies prior to their working within the subdivision. (7) The subdivision owner bears the responsibility for implementation of the approved SWP3s for all construction activity within the development, excluding construction under the control of subsequent owners of individual lots and construction managed by utility agencies. (8) The subsequent owner of an individual lot bears the responsibility for continued implementation of the approved SWP3s for all construction activity within or related to the individual lot, excluding construction managed by utility agencies. (d) Stormwater pollution prevention plans. Preparation and implementation of stormwater pollution prevention plans for construction activity shall comply with the following: (1) Preparation. a. The SWP3 shall be prepared under the direction of a qualified person, as defined in subsection (d) of this section. b. The SWP3 shall provide the name, address and telephone number of the project owner for the purposes of correspondence and enforcement. c. The SWP3 shall identify existing natural resources such as streams, forest cover and other established vegetative cover. d. The SWP3 shall specify and provide details for all BMPs necessary to meet the requirements of this article, including any applicable BMPs that have been adopted and imposed by the city. e. The SWP3 shall specify when each BMP will be installed, and for how long it will be maintained within the construction sequence. Multiple plans may be required for major phases of construction such as rough grading, building construction and final grading. f. The SWP3 shall delineate all anticipated disturbed areas and specify the vegetative cover that must be established in those areas to achieve final stabilization. (2) Implementation. a. BMPs shall be installed and maintained by qualified persons. The owner or representative shall be able to provide upon the director's request a copy of the SWP3 on site within one hour during construction activity, or within the next business day for periods of inactivity, and shall be prepared to respond to unforeseen maintenance of specific BMPs. b. The owner or representative shall inspect all BMPs at least once per month and within the next business day after a rainfall of one quarter of an inch or more as measured at the site or generally reported in the Lawrence area. c. Based on inspections performed by the owner or by authorized city personnel, modifications to the SWP3 will be necessary if at any time the specified BMPs do not meet the objectives of this article. In this case, the owner shall meet with authorized city personnel to determine the appropriate modifications. All modifications shall be completed within seven days of the referenced inspection, and shall be recorded on the owner's copy of the SWP3. (e) Requirements for utility construction. (1) Utility agencies shall be responsible for compliance with the requirements of subsection (e) of this section. (2) Utility agencies shall develop and implement best management practices (BMPs) to prevent the discharge of pollutants on any site of utility construction within the city. In addition, the city may adopt and impose BMPs on utility construction activity. (3) Utility agencies shall implement BMPs to prevent the release of sediment from utility construction sites. Disturbed areas shall be minimized, disturbed soil shall be managed and construction site entrances shall be managed to prevent sediment tracking. Excessive sediment tracked onto public streets shall be removed immediately if the sediment presents a traffic hazard or public safety concern. (4) Prior to entering a construction site or subdivision development, utility agencies shall have obtained from the owner a copy of any SWP3s for the project. Any disturbance to BMPs resulting from utility construction shall be repaired immediately by the utility company in compliance with the SWP3.

(Code 2018, § 9-903; Ord. No. 7373; Ord. No. 9491)