Sec. 30-64. - Facilities work requirements.
(a) All facilities work shall be conducted in a manner that minimizes the disruption to the use of the rights-of-way and to vehicular and pedestrian travel. The occupant shall take appropriate measures to redirect or serve vehicular or pedestrian travel in the affected rights-of-way, in accordance with the Manual of Uniform Traffic Control Devices, and as directed by the city engineer. (b) Except as specifically permitted by a franchise agreement approved by the city, all newly constructed facilities shall be located underground. The occupant shall comply with all requirements of the city relating to underground facilities. Above ground facilities shall comply with all applicable zoning regulations. (c) The facilities work shall not obstruct access to any fire hydrant without the prior written approval of the city engineer and the director of fire services. (d) The rights-of-way shall be restored to its previous condition following the conclusion of the facilities work. Unless the city engineer approves the permitholder to perform street or alley cut repairs, which shall be performed consistent with the city engineer's rules and regulations, the city shall perform all street or alley pavement cut repairs. The permitholder shall be responsible for all costs of pavement replacement and backfilling, and shall be responsible for maintaining the approved traffic controls until the city completes the restoration. The city shall provide the facilities or owner with an estimate for all pavement repairs prior to the facilities work, and the permitholder shall pay the estimated amount prior to conducting its facilities work. The city's costs shall be on a time and materials basis and shall include a minimum 15 percent administration charge. The city will provide the permitholder with an invoice upon completion of its work, and the permitholder shall pay any additional amount due. The city shall refund any unused amount if the cost of the actual work was less than the amount the permitholder paid. (e) If city property is damaged during the facilities work, the permitholder shall immediately notify the city. The city engineer may direct the permitholder to repair the damage, at its expense, or the city may repair the damage, and the permitholder shall reimburse the city for such costs. (f) All facilities work must be conducted with suitable precautions to prevent damage to pipes, conduits, and other underground structures, and to protect from disturbance or damage all monuments and property marks until the city engineer has witnessed or otherwise referenced their location. (g) All facilities work shall be made available for inspection by the city, upon request. (h) Any contractor or subcontractor used for facilities work must be properly licensed under laws of the State of Kansas and all applicable local ordinances. (i) All underground facilities shall be marked as appropriate flush-type markers or by the use of visible warning decals placed on above ground enclosures. The selection of the marker to be used shall take into account pedestrian and vehicle traffic in the vicinity of the facility.
(Ord. No. 7462, § 1, 11-19-19)
Ask a question about Manhattan law
Corpus searches the Manhattan sections it holds and shows the ones that match, with their citations. Free, no sign-in.