§ 32-195 — Stormwater pollution prevention plan (SWP3); defined

Code of Ordinances of the City of Manhattan, Kansas (Codified through Ordinance No. 7838, enacted September 15, 2026. (Supp. No. 68)) · Manhattan Code of Ordinances § 32-195

Corpus is an independent public-information project, not the official City of Manhattan website. Stable reference: corpuslaw.us/code/925a8fc8-1f12-4b40-9aa8-e268ac39588e

Sec. 32-195. - Stormwater pollution prevention plan (SWP3); defined.

(a) Defined. A stormwater pollution prevention plan (SWP3) is a document that specifically describes the BMPs to be implemented for a particular construction site, subdivision development, or utility construction site to minimize erosion and to reduce the discharge of sediment and other pollutants into the stormwater management system and surface waters. Preparation and implementation of the SWP3 shall comply with the most current edition of the City of Manhattan Standard Specification. (b) Preparation and submission. The SWP3 shall be prepared by an engineer, architect, or landscape architect licensed by the Kansas State Board of Technical Professions. The submission of the SWP3 shall be upon such form and provide such information as prescribed by the director of public works. Multiple plans may be required for major phases of construction such as rough grading, building construction and final grading. The SWP3 shall contain, at a minimum, the following information: (1) The identification of existing natural resources such as streams, forest cover and other established vegetative cover. (2) A detailed description of all BMPs necessary to meet the requirements of this article. (3) A schedule that states when each BMP will be installed, and the period of time that it will be maintained during the construction schedule. (4) A delineation of all anticipated disturbed areas and a specification of the vegetative cover that must be established in those areas to achieve final stabilization. (c) Approval of the SWP3. If the SWP3 meets the requirements of this Article, the director of public works shall issues his written approval of the SWP3 within 14 days of the submission of the SWP3. If the SWP3 requires modification, the director of public works shall issue a request for revisions within 14 days of the submission of the SWP3. The person responsible shall not undertake any activity on the site that disturbs the soil or removes vegetation until the director of public works has issued a letter of SWP3 approval. The director of public works may withhold the issuance of a building permit until the person responsible has received approval of the SWP3 for the site. (d) Amendment of the SWP3. The person responsible shall amend the SWP3 in the following circumstances: (1) If there is a change in design, operation, or maintenance of BMPs; (2) If there is a change in the design of the construction project that could significantly affect the quality of the stormwater runoff or the use of the BMPs; (3) If the permittee or city inspections indicate deficiencies in the SWP3 or any BMP; or (4) If the director of public works determines that a significant pollution potential exists. (e) [Copy to city.] The person responsible shall provide a copy of the SWP3 to the city, the KDHE, or EPA, within one hour of any request during construction activity, or within the next business day for periods of inactivity. (f) [Copy to contractor.] The person responsible shall provide a copy of the SWP3 to each contractor or entity (including utility crews, city employees, and their agents) who will perform work at the site, and ensure compliance with the requirements of the SWP3. (g) [Site inspection.] The person responsible shall inspect the site on a regular schedule, which shall be no less frequent than once each month, and shall increase such inspections when construction activity increases. The person responsible shall inspect the site within 24 hours of a precipitation event of one-half inch or greater within the city. (h) [Condition of approval.] As a condition of the approval of the SWP3, the city shall have the authority to inspect the site for compliance with the SWP3 and this article at all reasonable times, which may include the collection of samples of any discharge to the stormwater management system or surface waters.

(Ord. No. 6659, § 9, 9-11-07)

Ask a question about Manhattan law

Corpus searches the Manhattan sections it holds and shows the ones that match, with their citations. Free, no sign-in.