§ 32-52 — System development charges
Code of Ordinances of the City of Manhattan, Kansas (Codified through Ordinance No. 7838, enacted September 15, 2026. (Supp. No. 68)) · Manhattan Code of Ordinances § 32-52
Corpus is an independent public-information project, not the official City of Manhattan website. Stable reference: corpuslaw.us/code/6f729706-5ec0-4a4a-bfa8-4e0498d17483
Sec. 32-52. - System development charges.
(a) There is hereby established a system development charge to be imposed upon all structures that are issued a building permit for a permit for connection to the city water distribution system when the structure is initially connected, regardless of whether the structure is located inside or outside of the city limits. (b) Except for all facilities owned by Kansas State University, any new or existing structure located outside the city limits shall pay double the inside city system development charge as set forth in subsection (c) below, upon their initial connection to the city water distribution system. All facilities owned by Kansas State University shall pay the system development charges set forth in subsection (c) below for facilities inside the city regardless of whether the facilities are located inside or outside of the city limits. (c) The water system development charge shall be based on the size and type of each individual meter as follows: (1) System development charge: Water meter size | Water system development charge Inside city | Outside city ⅝ inch | $1,017.00 | $2,034.00 ¾ inch | $1,017.00 | $2,034.00 1 inch | $2,034.00 | $4,068.00 1½ inch | $4,066.00 | $8,132.00 2 inch | $12,871.00 | $25,742.00 3 inch | $35,361.00 | $70,722.00 4 inch | $60,966.00 | $121,932.00 6 inch | $130,061.00 | $260,122.00 8 inch | $227,606.00 | $455,212.00 10 inch | $338,698.00 | $677,396.00 12 inch | $430,824.00 | $861,648.00 16 inch | $541,916.00 | $1,083,832.00 (2) For water connections that utilize a compound water meter or fire meter, which consist of a combined two-meter system for the purpose of accurate metering of both high- and low-volume water demands, the larger of the two water meters shall be used to determine the system development charge. (3) For a one- or two-family residential dwelling structure connected to the city water system that requires a fire protection sprinkler system, if such sprinkler system requires a larger meter size to provide adequate fire protection, the fire chief, director of public works, or other duly designated representative of the city shall have the authority to determine the appropriate equivalent meter size to assess the meter-based monthly capacity surcharge to better reflect the standard residential water meter size that would otherwise be necessary to provide domestic service to the structure. (4) The system development charges shall be paid for any structure previously connected to the city's water distribution system that is being altered, added to, or rebuilt, if the structure requires a larger sized water meter. (5) Any structure connecting to the city's water distribution system, where the structure is located outside of the city limits and the connection is used exclusively for fire protection sprinkler systems, shall be required to pay a water system development charge. The water system development charge shall be based on the pipe diameter of the connection and shall be one-half of the equivalent meter size listed within this article for outside city connections. (d) This system development charge is for the right to connect to the city's water system and is in addition to any installation charges currently levied, or that might be levied in the future, for actual labor, materials, and administrative costs associated with making water taps and setting water meters. (e) The revenues from the charges set forth above shall be set aside in a water fund to be used for the construction, reconstruction, maintenance, replacement, and repair of improvements related to the city water system, or improvements to the public facilities of the city that provide increased capacity to serve new or expanded development, as the governing body of the city deems advisable. (f) The charges set forth above shall be immediately due and payable at the time a building permit is issued for the structure, or in the case where no building permit is required, shall be due and payable at the time the "initiating service charge" as set forth in section 32-48 is paid. (g) The building official shall collect the systems development charge before issuing any building permit or before permitting any connection to the water system. If a connection is made to the water system without the permit prescribed by this chapter, the system development charge is immediately due and payable as of the earliest date that such permit was required under this chapter and refusal to pay the systems development charge promptly upon notification shall be unlawful, and subject to a minimum fine of $100.00. (h) The system development charge shall be paid based on the year that the building permit is approved by the building official and not when the building permit was applied for. (i) Whenever the city provides water service to a property located outside of the city limits, pursuant to a written contract authorized by the governing body, the charges applicable to the property identified in that contract shall be the charges set forth within the contract, even if such charges are inconsistent with the provisions of this section. In addition, such charges may include a charge for extending infrastructure to serve the subject property.
(Ord. No. 7331, § 3, 12-19-17; Ord. No. 7389, § 2, 12-18-18; Ord. No. 7450, § 2, 10-15-19; Ord. No. 7516, § 2, 12-1-20; Ord. No. 7557, § 3, 12-7-21; Ord. No. 7598, § 3, 10-4-22; Ord. No. 7665, § 3, 10-17-23; Ord. No. 7733, § 3, 12-3-24; Ord. No. 7777, § 3, 10-7-25)
Ask a question about Manhattan law
Corpus searches the Manhattan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
