For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2 — INSTALLATION OF THE NETWORK

Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code, App. B, art. III, § 2

Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/d49f9287-300d-42ba-b005-8064cf4ea430

SECTION 2 - INSTALLATION OF THE NETWORK

2.1 Installation Specifications. The installation of the Facilities shall be made in accordance with plans and specifications as may be approved by the City and after obtaining all necessary Permits and Approvals. The location, depth of the fiber underground, and any other requirements shall be approved in writing by the City prior to construction of the Facilities at that specific location, approval of which shall not be unreasonably withheld, conditioned or delayed. Approval of plans and specifications and the issuance of any Permits and Approvals by the City shall not release IdeaTek from the responsibility for, or the correction of, any errors, omissions or other mistakes that may be contained in the plans, specifications and/or Permits and Approvals. IdeaTek shall be responsible for notifying the City and all other relevant parties immediately upon discovery of such omissions and/or errors and with obtaining any amendments for corrected City-approved permits, as may be necessary. IdeaTek shall be responsible for all costs associated with the permitting process, including, but not limited to, repairs and replacement of City ROW. IdeaTek shall undertake and perform any work authorized by this Agreement in a skillful and workmanlike manner. 2.2 Compliance with Permits. All work within the City's ROW shall be performed in compliance with all applicable Permits and Approvals, and all applicable regulatory requirements. 2.3 Traffic Control. The installation of the Facilities shall be performed in accordance with traffic control plans for temporary construction work that are approved by the City, which approval shall not be unreasonably withheld, conditioned or delayed. 2.4 Construction Schedule. If requested by the City, at least ten (10) days prior to the installation of the Facilities, IdeaTek shall deliver to the City a schedule for the proposed work related to the construction of the Facilities, as well as a list of the names of all agents and contractors authorized by IdeaTek to access the ROW on IdeaTek's behalf. 2.5 Coordination of Work. IdeaTek shall be responsible for coordination of work to avoid any interference with existing utilities, substructures, facilities and/or operations within the City's ROW. IdeaTek shall be the City's point of contact and all communications shall be through IdeaTek. IdeaTek shall be solely responsible for communicating with Kansas One-Call. 2.6 Placement of Facilities. IdeaTek shall coordinate the placement of its Facilities in the ROW in a manner that minimizes adverse impact on public improvements, as reasonably determined by the City Engineer. 2.7 Existing Utility Poles. IdeaTek shall obtain a properly executed agreement with the owner of any existing pole or structure, in addition to any required Permits and Approvals, before attaching its Facilities to an existing utility pole or structure in the ROW. 2.8 New Streetlight Poles and other City Facilities. IdeaTek may build new streetlight poles or other such facilities required for the installation of the Facilities in accordance with the City's ROW Ordinance, Zoning Regulations, and other applicable City, state and federal specifications and Laws ("New Poles"). The City encourages the conservation of the ROW by sharing of space by all utilities and ROW users. Accordingly, the Parties agree that in areas where there are existing poles, IdeaTek will work with the owner of that existing pole to collocate the DAS Facility, and IdeaTek will only pursue the installation of a new pole when the existing pole owner is unwilling to reasonably allow such attachment or where such attachment is unfeasible from a safety, technical, and engineering (structural and radio frequency coverage) perspective. 2.8.1 City Use of New Poles. The Parties understand and agree that the City may use any New Poles for City purposes, including but not limited to streetlights and other lighting so long as such use does not interfere with IdeaTek's use of its Network or Facilities. IdeaTek shall reasonably cooperate with the City when using the New Poles. Except for the installation of the lights and ancillary equipment on or in the New Poles and/or as set forth in Section 2.8.2 below, IdeaTek shall not be responsible for maintenance, repair, or replacement of City-owned lights, light bulbs and equipment, or equipment owned by third parties authorized by the City, on the New Poles. 2.8.2 Damage to New Poles. If a New Pole falls or is damaged such that there is an imminent threat of harm to persons or property, then the City may cause the New Pole to be removed to the side of the street or a location that City believes reasonably eliminates the risk of such imminent threat of harm to persons or property. IdeaTek shall, after written notice from the City that any New Pole has been damaged or removed, cause the New Pole to be repaired or replaced within thirty (30) days after the City's written notice. The cost to repair and/or replace any New Pole, including the replacement City streetlight, bulb and ancillary equipment shall be paid by IdeaTek; provided, however, that if the New Pole is damaged or destroyed by the City or a third party user that the City has given the right to use the New Pole, then the City and/or its third party user shall pay the cost to repair and/or replace the New Pole. To the extent that IdeaTek seeks reimbursement from a third party either directly or through applicable insurance, the City shall assign to IdeaTek any rights the City may have against such third party for such claim.

Ask a question about Salina law

Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.