§ 26-2 — Removal of equipment required
Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 26-2
Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/7f2179ea-eb1c-449a-bfd5-d36949f13d13
Sec. 26-2. - Removal of equipment required.
It shall be the duty of every person to whom a permit may be issued as provided in this chapter, after the well has been drilled in the event the same is a dry hole or abandoned, to remove the derrick, drilling tools, equipment and machinery from the location of the well and to restore the premises to their original condition, as nearly as it is practical, and to see that the well is properly plugged. If oil or gas is produced from such well, then it shall be the duty of the holder of the permit upon the completion of the drilling of the well to remove all machinery, equipment and material not necessary to be retained for use in the production of the oil or gas from such well, and insofar as can be done, consistent with the production from such well to restore the premises to their original condition as nearly as practical. All of which, either in the event of a dry hole or a producing well, shall be done within sixty (60) days after completion of the drilling of the well.
(Code 1966, § 24-15)
Ask a question about Salina law
Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.
