§ 36-75 — Drainage and storm sewers
Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 36-75
Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/2362b476-8103-40ab-a972-acca2b96dcef
Sec. 36-75. - Drainage and storm sewers.
(a) General requirements. The planning commission shall not approve any plat of a subdivision which does not make adequate provisions for storm water runoff control. This control may be accomplished through the use of temporary detention basins, open channels, and/or closed conduits. The applicant shall be required to submit a drainage report prepared by a licensed professional engineer which examines the effects of the proposed subdivision on all upstream and downstream drainage conditions. The scope of this report shall be determined by the city engineer. The drainage report shall assume the ultimate development of the entire drainage basin based upon the current land use plan and the current and proposed zoning of the land within the drainage basin. Calculation of storm flows and runoff characteristics of the subdivision shall be performed in accordance with the design criteria established by the city engineer. The city engineer shall inform the planning commission, in writing, of the effects of the proposed subdivision on the existing storm drainage system based upon the above submitted drainage report. The city may require the developer of the proposed subdivision to construct or cause to be constructed all necessary storm drainage systems, designed in accordance with the design criteria established by the city engineer, prior to the issuance of any building permit. (b) Location. Drainage facilities shall be located in the street right-of-way where feasible, or in perpetual unobstructed easements of appropriate width. (c) Floodplain areas. The planning commission, when it deems necessary for the health, safety or welfare of the present and future population of the area and necessary for the conservation of water, drainage and facilities, may prohibit the subdivision of any portion of the property which lies within the floodplain of any stream or drainage course. These floodplain areas shall be preserved from any and all destruction or damage resulting from clearing, grading or dumping of earth, waste materials or stumps, except at the direction of the planning commission. (d) Dedication of drainage easements: (1) General requirements. Where a subdivision is traversed by a watercourse, drainageway, channel or stream, there shall be provided a storm water easement or drainage right-of-way conforming substantially to the lines of such watercourse, and of such width and construction as will be adequate for the purpose. The drainage shall be maintained by an open channel with landscaped banks and adequate width for maximum potential volume of flow, unless some other design is approved by the city engineer and planning commission. (2) Drainage easements. a. Where topography or other conditions are such as to make impractical the inclusion of drainage facilities within street rights-of-way, perpetual unobstructed easements at least fifteen (15) feet in width, or more if determined necessary by the city engineer, shall be provided across property outside the street. Drainage easements shall be carried from the street to a natural watercourse or to other drainage facilities. b. When a proposed drainage system will carry water across adjacent private land outside the subdivision, appropriate drainage rights must be secured and indicated on the plat. c. The applicant shall dedicate, either in fee simple or by drainage or conservation easement, land on both sides of existing watercourses, to a distance to be determined by the planning commission. d. Low-lying lands along watercourses subject to flooding or overflowing during storm periods, whether or not included in areas for dedication, shall be preserved and retained in their natural state as drainage ways. Not more than twenty-five (25) percent of such land or land subject to periodic flooding shall be computed for determining the number of lots to be utilized or for computing the area requirements of any lot.
(Ord. No. 80-8828, § 1(3.5), 12-22-80)
Ask a question about Salina law
Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.
