For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 41-162 — Test procedures

Salina Code, City of Salina, Kansas (Codified through Ordinance No. 26-11299 adopted August 24, 2026. (Supp. No. 19)) · Salina Municipal Code § 41-162

Corpus is an independent public-information project, not the official City of Salina website. Stable reference: corpuslaw.us/code/91a21cd9-0fe7-45e4-ab39-133f29d9f556

Sec. 41-162. - Test procedures.

All analysis required by an industrial wastewater discharge permit shall conform to the techniques prescribed in 40 C.F.R. part 136. All self-monitoring analysis or compliance monitoring requires the use of a laboratory certified by KDHE for both the method of analysis and the parameter. For each measurement or sample the permittee shall record the exact place, date, and time of sampling, the date of the analysis, the analytical techniques or methods used, and the individual(s) or name of the laboratory who performed the sampling and analysis and results. If the permittee monitors any pollutant at the location(s) designated in the industrial wastewater discharge permit more frequently than required, using approved procedures, the results shall be included in the periodic compliance report. Such increased frequencies shall also be indicated.

(Ord. No. 92-9505, § 2, 4-27-92)

Ask a question about Salina law

Corpus searches the Salina sections it holds and shows the ones that match, with their citations. Free, no sign-in.