11.16.090 - Stormwater Treatment Plan and Report Requirements.
A. Planning Commission Submittal: No Planning Commission Application shall be accepted by the City unless it includes a preliminary stormwater treatment plan and preliminary stormwater treatment report in accordance with the Shawnee Design and Construction Manual. B. Final Plans: The final stormwater treatment facility plans (Plans) are required to be incorporated into the public improvement plans and/or site development plans for the project and prepared in accordance with the Shawnee Design and Construction Manual. In addition, a Stormwater Treatment Facility Report (Report) is required to be submitted concurrently with the Plans and shall include detailed information for each STF within the Development as required by the Shawnee Design and Construction Manual. 1. The Director shall have the authority to set minimum Plan and Report submittal requirements by written policy or checklist. 2. Both the Plans and Report require review and acceptance by the Director prior to a building permit and/or public improvement permit being issued for the Development. 3. Following the construction and certification of the STF, the Landowner can not make any revisions to the accepted Plan and Report without written approval by the Director. The following items are required to make revisions to an approved Plan and Report: a. Revised Plans and Reports must be submitted to the Director for review and written acceptance prior to any changes being made to the existing Plans and Reports previously approved by the Director. b. Revised Plans and Reports must be prepared by a Professional Engineer unless another design individual is first approved in writing by the Director. C. Design Certification: Prior to commencing construction of a STF, a Professional Engineer shall submit a certification stating that the Plans, Report, and specifications for constructing required STFs are in conformance with this Chapter and the Shawnee Design and Construction Manual.
(Ord. 3394, 2021) (Ord. 2958, 2010) (Ord. 2868, 2007)