For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.16.070 — Street and Sidewalk Construction

Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 16.16.070

Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/265f63ba-4a1c-4e43-9846-295ca96eaf84

16.16.070 - Street and Sidewalk Construction.

Provisions relating to street and sidewalk construction shall be as follows: A. All streets shall conform to the requirements set forth in the Shawnee Design and Construction Manual. Curb and gutter shall be constructed on both sides of new streets. When newly platted land fronts on an existing street that does not contain curb and gutters, such curb and gutter shall be constructed at the time that any of the newly platted lots are improved with buildings, unless temporary improvements are determined by the City Engineer to be appropriate as set forth in 16.16.070(C) of the Shawnee Municipal Code. When a portion of unpaved right-of-way exists between newly installed curb and gutter and an adjoining paved street, the Subdivider shall pave that portion of unpaved right-of-way in such a manner that conforms to the Shawnee Design and Construction Manual. B. Sidewalks shall be designed and constructed, in accordance with the Shawnee Design and Construction Manual. Sidewalks shall be located on at least one (1) side of all new streets, and along the side of an existing street where a sidewalk does not already exist on either side. At the discretion of the Governing Body sidewalks may be required on both sides of the street. C. In cases where an existing peripheral street does not conform to the established standards of the City for the designated street classification, temporary improvements shall be made using the following standards and procedures shall apply: 1. These required improvements are meant to be temporary in nature and shall not in any way relieve the Subdivider of his or her responsibility to provide the required payment in accordance with the provisions of this Chapter or other portions of the Shawnee Municipal Code. In addition, temporary improvements may be required even without a peripheral street account payment, as determined by the City Engineer. 2. The landowner/developer shall provide a temporary improvement whenever any of the following conditions exist on a peripheral street: a. The existing street surface consists of a seal coated material, crushed rock or material other than asphaltic concrete or Portland cement concrete; b. The existing street surface is less than twenty-two (22) feet in width or three (3) inches in depth; or c. The street has an irregular deteriorated surface as determined by the City Engineer. 3. Such temporary improvement shall consist of not less than a three-inch overlay of hot mix asphaltic concrete over the entire existing street surface or minimum width of twenty-two (22) feet, whichever is greater. At a minimum, such temporary improvement shall extend along the entire length of the development. The subgrade for those portions of a widen-street shall be constructed in compliance with current collector street standards. 4. Plans and specifications for said improvements shall be prepared by the developer's engineer in accordance with the City's Shawnee Design and Construction Manual, and submitted for approval by the City Engineer in the same manner as any other street improvement project within the city.

(Ord. 3080, 2013) (Ord. 2496, 2000) (Prior Code Section 20-209)

Ask a question about Shawnee law

Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.