§ 10.20.070 — Backfilling—Generally; removal of surplus material
The Code of the City of Wichita, Kansas (Supp. No. 36, Update 1: codified through Ordinance No. 53-088, adopted July 28, 2026) · Wichita City Code § 10.20.070
Corpus is an independent public-information project, not the official City of Wichita website. Stable reference: corpuslaw.us/code/a52d7633-5b1c-4538-ae48-56f6b876c686
Sec. 10.20.070. - Backfilling—Generally; removal of surplus material.
All excavations where sidewalk or pavement has been cut shall either be backfilled with clean sand, which shall be flushed and vibrated into place, or shall be backfilled with excavated material dampened and thoroughly compacted in six-inch layers until its density is equal to at least one hundred percent of the density of the adjacent undisturbed soil. For vehicular pavements, the excavation shall be compacted to within eight inches of the surface; for pedestrian pavements, the excavation shall be compacted to the bottom of the final sidewalk. Use of appropriate backfill material, including flowable fill, may be required by the city engineer. Temporary patches shall have a thickness equal to the full depth of the adjacent pavement and shall be compacted flush with the adjacent surfaces. Within twenty-four hours, all surplus excavated material shall be removed from the location.
(Ord. No. 50-182 § 8, 4-26-16)
Ask a question about Wichita law
Corpus searches the Wichita sections it holds and shows the ones that match, with their citations. Free, no sign-in.
