For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.24.050 — Approval of route by maintenance engineer

The Code of the City of Wichita, Kansas (Supp. No. 36, Update 1: codified through Ordinance No. 53-088, adopted July 28, 2026) · Wichita City Code § 10.24.050

Corpus is an independent public-information project, not the official City of Wichita website. Stable reference: corpuslaw.us/code/db7e3e3f-350d-42fd-8d66-eadb9daa45e5

Sec. 10.24.050. - Approval of route by maintenance engineer.

Upon approval of the permit by the Director of MABCD, the Maintenance Engineer or designee shall review the proposed route to insure a route consistent with public safety and a minimum amount of damage. The Maintenance Engineer shall provide the moving contractor an estimate of costs for moving, modifying, or otherwise disturbing any existing City facilities. If the initial route proposed is determined by the Maintenance Engineer to not be feasible, the applicant shall be given an opportunity to submit an alternate route for review.

(Ord. 50-181 § 5, 4-26-16; Ord. No. 50-338 § 5, 10-11-16)

Ask a question about Wichita law

Corpus searches the Wichita sections it holds and shows the ones that match, with their citations. Free, no sign-in.